The regular meeting of the Board of Directors of the Truckee Donner Public Utility District
was called to order by President Aguera at 7:10 PM in the TDPUD Board Room.
ROLL CALL: Directors Joe Aguera, John Corbett, Bob Jones and Patricia Sutton were
present. Director Jim Maass was absent.
EMPLOYEES PRESENT. Mary Chapman, Susan Craig, Peter Holzmeister, Kathy Neus
and Bob Quinn.
CONSULTANTS PRESENT: Attorneys Steve Gross and John Phelps; Consulting
Engineer Keith Sauers Virginia Horler of Raucher Pierce Refsnes, Inc..
CONSIDERATION OF A STAFF REPORT ON WATER SYSTEM STANDBY POWER
GENERATORS; POSSIBLE ACTION
At the last meeting, the Board discussed the advantages of mounting the standby
generator on a used truck rather than on a trailer. One of the District's electric bucket
trucks is being decommissioned soon; the present equipment could be removed from the
truck and a new flat bed installed for around $5,000.
Consulting Engineer Chuck Martin is recommending the purchase of a 350 kw generator
instead of 250 kw. The smaller generator was recommended earlier because it was more
portable. The 250 kw unit will not operate the Airport pump or all pumps simultaneously
at Soma Sierra or Donner Trails. However, if a truck is used to transport the unit, the
portability problem is erased. The approximate cost of a 250 kw diesel generator is
$38,000; the 350 kw unit is $46,000.
Briefly discussed was a used 275 kw unit that is for sale in the community. Because of
its age and the possibility that replacement parts may not be available, purchase was not
considered to be a reasonable option.
Director Jones moved, and Director Corbett seconded, that the standby generator be a
District-furnished-truck-mounted 350 kw generator. All Directors, aye, by voice vote. SO
MOVED.
CONSIDERATION OF PROPOSALS FOR SERVICES IN CONNECTION WITH THE
REFINANCING OF THE HEADQUARTERS COMPLEX, 1986 CERTIFICATES OF
. PARTICIPATION - PROPOSAL OF INVESTMENT BANKING SERVICES FROM
RAUSCHER PIERCE REFSNES, INC. - PROPOSAL OF SPECIAL BOND COUNSEL
SERVICES FROM BROWN AND WOOD
812193 Pg 1
• Virginia Horier, a representative of Raucher Pierce Refsnes, Inc., the investment banking
firm that coordinated the last certificates of participation issue and acted as the
underwriters to guarantee the sale of the bonds for the District, was present in the
audience. At the request of the Administrative Services Manager, Ms. Honer reviewed the
District's two financings to see if there would be an advantage to refinancing either the
1986 or 1991 Certificates of Participation since interest rates have dropped. There would
be no economic benefit to the District in refinancing the 1991 Certificates of Participation.
It would, however, be economically beneficial to the District to pursue refinancing the
1986 Certificates of Participation. The projected net debt service savings are estimated
to be $119,978 over the life of the issue or $80,006 on a net present value basis.
After some discussion, Director Jones moved that the Board authorize execution of an
agreement with RauscherPierce Refsnes, Inc. to proceed with the refinancing of the 1986
Certificates of Participation for the District Headquarters Complex provided that pursuing
this option continues to provide a substantial net savings to the District as estimated;
further, that the District hire the services of Brown & Wood, inc. to proceed with the
preparation and review of documents relating to the refinancing of the 1986 Certificates
of Participation for the District Headquarters Complex for a fee of $25,000 plus out-of-
pocket expenses not to exceed $5,000. The motion was seconded by Director Corbett.
ROLL CALL: Corbett, Jones, Sutton and Aguera, aye; Maass, absent. SO MOVED.
PROPOSITION 55 PROJECT - STATUS REPORT - DOWNTOWN PIPELINES,
CONSIDERATION OF PROGRESS PAYMENT REQUEST NO. 2 - CHLORINATION
STATIONS, CONSIDERATION OF PROGRESS PAYMENT REQUEST NO. 2
Application has been made to the Department of Water Resources for the second
disbursement of loan funds to the District in the amount of $199,618.50 representing
project costs through May 1993.
Chlorination Stations - The contractor is on schedule with approximately 37% of the
project complete in about 35% of the contract time. He is making satisfactory progress
toward completion.
Downtown Pipelines-Progress is slow fora number of reasons including rocky conditions
and insufficient equipment and manpower. The contractor is assuring that additional
manpowerand equipment are coming and that the project will be completed on schedule.
At present, he has completed approximately 29% of the project in about 45% of the
contract time.
New Wells - The Board authorized Simon Hydro-Search to proceed with hydrogeology
tasks at Southside, Prosserand Glenshire Drive. They have prepared draft specifications
for test hole excavation at Southside and Glenshire Drive.
Storage Tanks - Negotiations have been proceeding for acquisition of a site for Frontier
Tank to be located north of Prosser Heights subdivision. Preliminary surveys have been
made to locate the new tank at the same elevation as the existing Prosser Heights tank.
812193 Pg 2
• Director Corbett moved, and Director Jones seconded, that the Board approve payment
of Periodic Estimate for Partial Payment Number 2 to Arcadian Enterprises in the amount
of$83,173.09. All Directors, aye, by voice vote. SO MOVED.
Director Corbett moved that the Board approve payment of Periodic Estimate for Partial
Payment No. 2 in the amount of $29,893.95 to JJM Engineering Constructors, Inc.;
seconded by Director Jones. Director Sutton abstained, all other Directors, aye. SO
MOVED.
SCADA PROJECT- CONSIDERATION OF A PROGRESS PAYMENT REQUEST TO
SANDEL/AVERY ENGINEERING - CONSIDERATION OF A PROGRESS PAYMENT
REQUEST TO MOUNTAIN ELECTRIC-CONSIDERATION OF A CONTRACT CHANGE
ORDER- CONSIDERATION OF AUTHORIZING A TRANSFER OF FUNDS FROM THE
CERTIFICATES OF PARTICIPATION ACQUISITION FUND TO THE WATER GENERAL
FUND
The original contract completion date for the SCADA project was to have been February
26, 1993. Sandel/Avery Engineering was experiencing delays, and through Amendment
No. 1 to the contract, the completion date was extended to July 15, 1993. As of July 15,
1993, the project was still only 62% complete.Consulting Engineer Keith Sauers has
communicated the District's concern regarding the project status to Sandel/Avery several
times. Based on the rate of progress since the start of work, Mr. Sauers does not expect
• the contract to be complete before mid-February 1994.
There was some discussion of the contract documents and the lack of a penalty clause.
Manager Holzmeister will determine who prepared the documents; further, he will invite
a representative of Sandel/Avery to be present at the next regular Board meeting to
discuss the project with the Board.
Sandel/Avery submitted an invoice in the amount of$24,005.39. Mr. Sauers found it to
be consistent with the contract for their work. Director Corbett moved, and Director Jones
seconded, that the Board authorize payment of Invoice No. 728931 in the amount of
$24,005,39, All Directors, aye, by voice vote. SO MOVED.
Mountain Electric has presented Periodic Estimate for Partial Payment No. 3. They have
completed 80%of their contract in 72%of the allowable time. Director Corbett moved that
the Board approve Periodic Estimate No. 3 and authorize payment of $6,540.62 to
Mountain Electric; seconded by Director Jones. All Directors, aye, by voice vote. SO
MOVED.
After consideration, Director Jones moved that the Board approve Mountain Electric's
Contract Change Order No. 2 in the amount of $5,635.47 for extra work proposed by
Sandel/Avery Engineering. Director Corbett seconded the motion. All Directors, aye, by
voice vote. SO MOVED.
• Director Corbett moved, and Director Jones seconded, that the Board authorize a transfer
of$30,546.01 from the 1991 Certificates of Participation acquisition fund to reimburse the
812193 Pg 3
Water General Fund. All Directors, aye, by voice vote. SO MOVED.
CONSIDERATION OF AUTHORIZING A TRANSFER OF FUNDS FROM THE 1991
CERTIFICATES OF PARTICIPATION ACQUISITION FUND TO THE DISTRICT WATER
GENERAL FUND
The Administrative Services Manager presented a list of invoices relating to the SCADA
project that have been paid by the District. Since the bills were under$3,000, they were
not listed on the list of bills presented for Board consideration. Mrs. Chapman is asking
that the Board authorize reimbursement to the Water Department General Fund for the
COP Acquisition Fund for the total of the invoices.
Director Corbett moved, and Director Jones seconded, that the Board authorize staff to
transfer $20,784.74 from the 1991 Certificates of Participation Acquisition Fund to
reimburse the Water Department General Fund for payment of SCADA related invoices.
ROLL CALL: Corbett, Jones and Aguera, aye; Sutton, no; Maass, absent. SO MOVED.
CONSIDERATION OFA RESOLUTIONAPPROVING SPECIFICATIONS AND ISSUING
A CALL FOR BIDS FOR RE-COATING THE ROOF AT THE DISTRICT'S
HEADQUARTERS BUILDING
The flat roofs at the District headquarters building, with the exception of the flat roof area
• over the administration offices, have had no maintenance since they were constructed.
The fire coating that was originally installed came loose approximately three years ago
and the wind blew most of it away. For the majority, the roofs are down to the original tar
and paper. There are several leaks over the warehouse area. The sun is drying out the
paper, so there is potential for more leaks. The roofs are deteriorating and require some
type of coating to stop the process; if not done, they will require replacing in a few years.
The Support Services Manager is suggesting issuing a call for bids for a high solid acrylic
elastomeric weather barrier coating that has a Class A fire rating, protection from UV
effects, stays flexible and resistant to temperature extremes and is weather resistant.
Currently the high school and hospital are using this acrylic coating with no problems or
complaints.
By Board consensus, staff was directed to analyze the contract documents and
guarantees, to talk with the architect and contractor, to determine why the roof is failing
and see what can be done.
PUBLIC INPUT
There was no public input.
CORRESPONDENCE
is Bruce Grow's retirement
812193 Pg 4
• The Board reviewed the letter of resignation from Bruce Grow, who has been a valuable
staff member for 27 years. His retirement date is September 17, 1993.
Director Jones moved, and Director Corbett seconded, that a resolution of
acknowledgment and appreciation be prepared for presentation to Mr. Grow at the next
Board meeting. All Directors, aye, by voice vote. SO MOVED.
CONSIDERATION AND POSSIBLE APPROVAL OF BILLS
After review, Director Jones moved, and Director Corbett seconded, that the bills
presented for consideration be approved for payment. All Directors, aye, by voice vote.
SO MOVED.
STAFF REPORT
A complete copy of the Staff Report is attached hereto for reference.
Glenshire Mutual Water Company/Airport District
Glenshire Water Company has identified a location in the northeast corner of Airport
property where they want to drill a test hole. They hope to find enough water to sink a
1,000 GPM production well. The Airport District asked for a financial proposal from
• Glenshire- they see this as a potential revenue generator for the Airport. Also, the Airport
indicated it would want a meeting with all interested parties including the PUD.
This matter will be placed on the next regular meeting agenda.
Electric services to TTSA
TTSA reports problems with voltage fluctuations; their staff has investigated and all
indications are that the problem is on the PUD system. Bob Quinn, Wayne Cummings
and Ken Weekly are working on the problem; they indicate the problem is within the
TTSA plant. PUD and TTSA will work together until the situation is found and corrected.
The Executive Officer of TTSA, Craig Woods, reports that Jim Reidy, a Sierra Pacific
Power Company engineer, has made a study of TTSA electric bills; he says he can save
them 25% if they take power from Sierra. Mr. Woods wants to meet with PUD Manager
Holzmeister to discuss services from SPPCo or a possible rate reduction from TDPUD.
This matter will be placed on the next regular meeting agenda.
Donner Lake Utility Company
It appears that the sale of Donner Lake Utility Company to Del Oro Water Company has
. been denied by the Administrative Law Judge. Counsel is obtaining a copy of the
pertinent documents.
812193 Pg 5
in-house Electrical Engineer
Attached to the Staff Report are memoranda suggesting employment of an in-house
electrical engineer.
Training our supervisors
Manager Holzmeister will be attending the American Management Association course
entitled, "Training the Trainer," during September in San Francisco. This will enable him
to conduct sessions with the department heads aimed at revitalizing the District's system
of management.
Scott Terrell memorandum
A copy of Mr. Terrell's memorandum is attached. The Planning Department performs
several community outreach programs.
CLOSED SESSION
The Board adjourned to closed session at 9:26 PM for the purpose of discussing the
Black arbitration in accordance with Government Code Section 54956.9(a), employee
matters and MOU matters in accordance with Section 54957.6, and a matter governed
® by Section 54956.9(c) and (b)(1).
RETURN TO PUBLIC SESSION
The Board returned to public session at approximately 11:46 PM. There was no action
taken or direction given as a result of closed session.
ADJOURNMENT
There being no further business before the Board, the meeting was adjourned at 11:47
PM.