November 17, 1990
The special meeting of the Board of Directors of the Truckee Donner
Public Utility District was called to order by President Maass at
9 : 14 A.M. in the TDPUD conference room.
ROLL CALL: Directors Joe Aguera, John Corbett, Richard Curran, Pat
Sutton and Jim Maass were present.
EMPLOYEES PRESENT: Peter L. Holzmeister.
CONSULTANTS PRESENT: Bob Rauch.
WORKSHOP TO ADDRESS GOALS AND OBJECTIVES OF THE DISTRICT
A workshop was held to discuss long and short range goals. No
action was taken.
ADJOURNMENT
The meeting was adjourned at 2 : 35 P.M.
TR ICE DONNER PU'J�bIC UTILITY DISTRICT
Pr den`
Prepared by
Susan M. Craig, Deputy District Clerk
smc
REGULAR MEETING
• November 19, 1990
The regular meeting of the Board of Directors of the Truckee Donner
Public Utility District was called to order by President Maass at
7 : 03 P.M. in the TDPUD Board Room.
ROLL CALL: Directors Joe Aguera, John Corbett, Richard Curran and
Jim Maass; Director Pat Sutton was expected.
EMPLOYEES PRESENT: Tom Buckhouse, Andy Hyde, Bruce Grow, Joe
Straub, Mary Chapman, Peter Holzmeister and Susan Craig.
CONSULTANTS PRESENT: Keith Sauers and Keith Knibbs of Sauers
Engineer; Counsel John Phelps.
OTHERS PRESENT: Among those present in the audience were Sue Ann
Donigan, Nikki Burchett, Eileen Fix and Bill Quisnell.
CONSENT AGENDA
Items 5 and 7 were removed from the consent agenda since staff
recommendations were not available at the time the packet was
prepared.
Director Curran moved, and Director Corbett seconded, that the
consent agenda be approved as follows:
That the low bid of Westinghouse Electric Supply Company
(WESCO) in the total amount of $11, 916 for transformers
be accepted.
That the semi-annual loan payment transfer from the water
general fund to reimburse the Tahoe Donner upgrade fund
in the amount of $17 , 000 be authorized.
All Directors, aye, by voice vote. SO MOVED.
Director Sutton arrived at this point in the meeting, at 7 : 04 P.M.
CONSIDERATION OF DONNER TRAILS TANK NO. 2 PROJECT
Change Order
District Engineer Hyde advised that Change Order No. 2 covers extra
work already done at his request by the contractor to enlarge
overflow piping from the existing Donner Trails tank from six
inches in diameter to twelve inches in diameter. It was less
costly to install larger overflow piping for the existing tank at
this time than it would be to dig through the new paving next year.
He recommended that the Board approve the change order in the
amount of $2 ,780.
Director Corbett moved, and Director Aguera seconded, that the
Board approve Contract Change Order No. 2 on the Donner Trails Tank
1
. No. 2 project. All Directors, aye, by voice vote. SO MOVED.
Partial Payment No. 3
The partial pay request covers the period from October 1 to
November 1. There is no line item for the disinfection of the tank
or for additional testing should it be required, and Mr. Hyde
recommended that $1, 500 be withheld from the amount requested by
the contractor.
Consultant Keith Knibb described the work remaining to be done.
Director Corbett moved, and Director Curran seconded, that the pay
request in the amount of of $31,049. 10 be approved. All Directors,
aye, by voice vote. SO MOVED.
Transfer of restricted funds
Director Corbett moved, and Director Curran seconded, that the
Board authorize the transfer $31, 049. 10 from the restricted
facility fee account to the general fund to cover the payment of
Partial Payment No. 3 for the Donner trails Tank No. 2 construction
project. All Directors, aye, by voice vote. SO MOVED.
CONSIDERATION OF ALDER CREEK PIPELINE PROJECT
• Change Order
Mr. Hyde reported that the Alder Creek Pipeline Project was
completed the first part of November. The change order includes
the groundwater relief drain required by Nevada County, dike
reconstruction, 40 ' of additional water main, a deduction for
adjustment of the amount of paving, two additional hydrant valves,
back charges due to the weather and delays, over-excavation and
additional rock due to leaking water, and a deduction for the
acquisition of some pipe from the District. Keith Sauers provided
a memo describing these items as well as supporting information
from the contractor.
During the project the contractor experienced quite a bit of
difficulty due to the leaking in the old pipe. These problems
resulted in a claim from the contractor for extra work. The claim
was reviewed by the District and contractor, and a compromise was
reached and is reflected in Change Order No. 2 .
Some of the items were previously discussed with the Board - the
groundwater relief drain which was added in accordance with Nevada
County' s encroachment permit; dike reconstruction due to relocation
of the pipeline to the shoulder of the road; and delays which
occurred due to rain water flooding the excavations. (The flooding
would not have occurred if the pipeline had not been moved to the
edge of the road. )
• Mr. Hyde recommended approval of Change Order No. 2 in the adjusted
amount of $16, 509 . 13 .
2
Director Sutton expressed concern that the payroll report form
. provided by the contractor wasn't correct and questioned whether
the District was being back-charged at an appropriate rate. Mr.
Sauers advised that he reviewed the prevailing wage scale with the
contractor and the rates are very close to what is required; the
contractor will provide the correct payroll form before the
contract is released, he said.
Director Curran moved, and Director Corbett seconded, that the
change order in the amount of $16,509 . 13 be approved. ROLL CALL:
Aguera, Corbett, Curran and Maass, aye; Sutton, abstain. SO MOVED.
Partial Payment No. 2
Responding to Director Sutton's question, Mr. Sauers advised that,
including the change order, the project is about 29% over the
original contract price.
Director Corbett moved, and Director Aguera seconded, that Partial
Payment No. 2 in the amount of $36, 262 .77 be approved. Director
Sutton abstained, all other Directors, aye, by voice vote. SO
MOVED.
Transfer of restricted funds
Director Sutton questioned whether or not this project should be
paid for with funds from the restricted facility fee account. She
asked to be provided with some justification for leaky line
replacement coming from facilities fees which she felt were more
related to storage and tanks. Mr. Holzmeister advised that the
District uses these funds for capital improvements, and this
project is considered to be a capital improvement. Mr. Hyde noted
that the 1990 budget indicates the project will be funded by rates
and facilities fees. The Chairman put the matter over and asked
for an explanatory memo.
PUBLIC INPUT
There was no public input.
CONSIDERATION OF THE WATER SYSTEM MASTER PLAN AND NEGATIVE
DECLARATION FOR THE PROJECT
Review of Department of Health Services letter dated October 17 ,
1990 concerning possible health effects of the plan
Consulting Engineer Keith Sauers briefly summarized the proposed
master plan. Thereafter, the Chairman opened the public hearing at
7 : 45 P.M.
Bill Quisnell identified himself as a customer from Ponderosa
Palisades. He asked why the plan calls for running pipe to serve
. Tahoe/Boca Estates and doesn't address the Joerger development.
3
Mr. Sauers advised that both areas are outside the District' s
• boundaries. Any costs to serve would be borne by the developer if
they were to be included; new growth pays the cost of providing
service to the new growth, he said.
Another member of the audience, Sue Donigan, said it sounds like
the customers will be paying for the situation at Tahoe Donner.
Chairman Maass agreed that the customers will bear the cost of the
Tahoe Donner line replacement, but the proposed rate increase is
not a result of that situation. After a developer builds lines and
the District accepts them, it is the responsibility of the entire
District to take care of those lines. It was noted that the
District's standards have improved since Tahoe Donner was built.
He advised that the final report on the Tahoe Donner leak analysis
undertaken by SEA will appear on the next meeting agenda.
Mr. Sauers provided a letter detailing the extent of the revisions
made so far to the draft version of the master plan. The changes
were made in response to comments made by the Board, District staff
and others who reviewed the plan such as Counsel Phelps and Jess
Morehouse. The final version will include these as well as other
comments made at the public hearing.
Chairman Maass noted that the plan is only a guideline; things will
be added and deleted as time goes on.
. Responding to Director Sutton's question, Mr. Sauers advised that
the District has permits to divert water from McGlashan, Tonini,
Southside, Sheepherder/Sawtooth Springs. She asked that the plan
include the permit numbers, how obtained, some historical data and
the fact that the District would like to retain the permits.
In his letter, Jess Morehouse of the State Department of Health
Services mentions that the Donner Creek well has been inactive for
several years and to return it to service according to the master
plan will require rehabilitation of the well and installation of
iron removal treatment. He also pointed out its close proximity to
Donner Creek, the shallow aquifer supplying the well, and possible
related health concerns. Mr. Sauers said a copy of Mr. Morehouse ' s
letter would be made a part of the master plan document.
Mr. Sauers noted that items identified in the dialogue (but not
known when they would be needed) were added to Table 13-1.
Director Sutton asked that the projects currently existing be
identified. Mr. Hyde assured Director Sutton that even though the
negative declaration only refers to Items 1 through 20 as projects
listed on Table 13-1, he believes there is no substantial impact on
the environment; the same conclusion can be made with the expanded
table. He said the proposed negative declaration applies to the
entire master plan.
Mr. Hyde advised that the entire master plan was provided to local
• agencies; the State Clearinghouse asked only for the negative
declaration and initial study. No responses have been received at
this time. He noted that no action is expected at this time. The
4
purpose of the public hearing is to receive comments from the Board
. and public on the plan and environmental study.
There being no further comments, Director Corbett moved that the
public hearing be closed at 8: 35 P.M. ; Director Aguera seconded the
motion. All Directors, aye, by voice vote.
WORKSHOP ON THE 1991 BUDGET
Manager Holzmeister explained that no rate increase or change in
programs is being requested in the Electric Department. However,
the Water Department needs a rate increase and a change in programs
(leaks, preventive maintenance and planning) . Costs are increasing
faster than new services, he said.
Mr. Holzmeister reviewed with the Board the major cost items. The
total of the electric fixed expenses is $6,705,786; total budget is
$7 , 645, 408; the amount remaining is $939, 622 or 12 . 3% . Fixed water
expenses are $1, 507, 121; total budget is $2, 175, 141; the amount
remaining is $668, 020, or 30.7%.
Also, Mr. Holzmeister presented a rate comparison of the PUD with
other water utilities. WestPac had the highest monthly charge,
$26. 68 ; Glenshire was lowest with $14 . 50. The PUD presently
charges $14 . 41 plus the appropriate zone charge.
• Office Manager Chapman provided 1990 budget figures and proposed
1991 budget figures for each department, contributions to capital,
purchased power costs, debt service and interdepartmental rent.
Mrs. Chapman summarized the responsibilities of the
Finance/Customer Services Department, reviewed the current
staffing, and goals for 1991. She noted one new employee has been
included in the budget. Also, she is requesting that funds set
aside in the 1990 budget for an endorsement machine, printer and
scanner be carried forward to the 1991 budget.
Bruce Grow noted that the Technical Services department supervises
meter reading, meter maintenance, vehicle maintenance, building
maintenance and some substation operations. There are currently
eight employees in the department, and he is not requesting
additional help. He reviewed and explained his 1991 budget
requests with the Board.
Chairman Maass mentioned his desire to have two documents - one a
brief summary which includes water and electric on the same page;
another document containing the detail.
Joe Straub, Purchasing Agent/Warehouseman, noted that this
department is responsible for purchasing material used by other
District departments, and for properly warehousing that material.
Mr. Straub reviewed his budget requests with the Board.
• District Electrical Engineer Tom Buckhouse advised that Electric
Operations is staffed by two Line Foremen, a Lead Lineman, five
5
Journeyman Linemen and a Groundman under his direction. They are
• responsible for the operation and maintenance of the electric
system and the extension of the system to serve new customer loads.
Considerable effort has been spent over the past three years
improving the reliability of the electric system through a phase
balancing program, a program of converting vertical construction to
horizontal construction, and a reconductoring program. The
programs will continue in 1991 and subsequent years in order to
provide customers with a safe, reliable and economical source of
electrical energy. Mr. Buckhouse reviewed his anticipated expenses
with the Directors.
Civil Engineer Hyde advised that Water Operations currently has a
staff of nine and is responsible for the operation and maintenance
of the water system, which includes wells, booster pump stations,
storage tanks, pipelines, appurtenances and services. A major
shift in budgeting is being proposed, and the previously neglected
area of preventive maintenance of pumping facilities is being
emphasized. A major effort is still required for repairing leaks
in water mains and service laterals, although the effort should be
reduced when the pipeline replacement project in Tahoe Donner is
complete.
Because of the late hour, the Chairman suggested adjourning the
meeting. He asked that staff prepare a priority list for water
operations, and that supporting services list their priorities
also. Manager Holzmeister said he would bring a variety of options
back to the Board for consideration.
BILLS FOR APPROVAL
Director Corbett moved, and Director Aguera seconded, that the
bills presented for consideration be approved for payment. All
Directors, aye, by voice vote. SO MOVED.
ADJOURNMENT
At 11: 20 P.M. , Director Aguera moved that the meeting be adjourned
to 7 : 00 P.M. on Monday, November 26, 1990; seconded by Director
Corbett. All Directors, aye, by voice vote. SO MOVED.