HomeMy WebLinkAbout1996-01-11 Min - Board MEMORANDUM
Date : January 1 1996
From: Mike
To: Dave
Subject : Development Agreements / Projects
for Calendar Year 1995
Per your request, the following listing provides a brief
description of the various projects I was involved with during
1995 . I have included a status report in the boxes following each
project .
Hospital District Professional Bldg.
• * Professional medical building located across from the
Hospital Administration building. The Hospital District is
the developer. Units in this project may be sold to private
parties.
Water system modifications and meter installations were
completed in the late fall . Remote meter installation and
final inspection is pending
Grossman Condominiums
* This is a four unit condo project located on Northwoods
Boulevard in Tahoe Donner.
Water system improvements have been completed per the executed
development agreement . The developer has requested
information concerning possible modifications and changes in
service . Dave Rully and Mary Chapman are currently addressing
these requests.
r^
Page 1 1995 Project List January 11, 1996
Truckee Pines
* 104 Unit affordable housing complex, located on Estates
Drive next to the Senior Citizens complex.
The developer' s and contractors are currently working on an
inspection punch list . Final acceptance is expected following
completion of the punch list items .
Tahoe Donner Golf Course Maintenance Building
* Located on Northwoods Blvd. next to the Fire Station.
This will be a 6500 s. f. building.
Construction has been completed. Final inspection of backflow
devices and remote meter installations are pending.
Truckee Town Square
* This project is located at the existing "SMALL MALL" on
Donner Pass Road. The project will remove the existing "SMALL
MALL" structure and replace it with 3 new buildings . This project
will also include the existing "Robertson building" . Additions to
the "Robertson building" are proposed.
�.•. This development is currently on hold due to environmental
issues . The developers are evaluating the project and will
contact the District when they have decided on a course of
action.
Levon Professional Building
* This project is located next to the sheriffs station,
on Donner Pass Road. The project proposes construction of a 2
story, 6600 s . f. office building.
Construction and meter installations are complete . Remote
meter installation is pending. Final inspection and
acceptance are pending.
Gooseneck Ranch
* This project is located in Martis Valley (Placer
County) . It is a proposed residential subdivision with a golf
course.
The developer has withdrawn their request for water service
from the District .
Page 2 1995 Project List January 11, 1996
Truckee Diner
* This project is located at the corner of West River
Street and Highway 267 . The project proposes construction of a
restaurant (phase 1) and a nine unit commercial building (phase
2) . At this time only phase 1 is expected to be constructed this
year.
Construction of Phase 1 water system improvements is complete .
Final acceptance will follow a fee adjustment .
Truckee Falls
* This project is located on Northwoods Blvd. between
White Fir Trail and Lausanne Way. The project proposes
construction of an eighteen hole golf course and associated
structures .
We are currently working with the developer in the development
agreement process . Sauers Engineering will evaluate developer
provided information concerning wells on the project site.
Donner Lake Plaza
* This project is located in the Donner Gate area between
�• the Chevron station and the Beginning restaurant .This will be a
6200 s . f . commercial building. The U-Haul rental business will be
relocated to this location.
All construction is complete . Final acceptance is expected
soon.
River Village
* This project is located near the Martis Valley
substation. Proposed is a 40 lot affordable housing subdivision.
The draft development agreement was given to the developer for
review and signature .
Donner Village Condos
* This project is located in Tahoe Donner on Northwoods
Blvd. This will be a 14 unit condo complex built on two parcels
that have been combined.
The upgraded lateral and meter manifolds for this project have
been installed. Meters will be installed as the individual
units are constructed.
Page 3 1995 Project List January 11, 1996
�^ Olson 4-Plex #2
* This project is located in Tahoe Donner on Northwoods
Blvd. This will be a 4 unit condo complex.
This project is complete .
Martis Town Houses
* This project is located on Martis Valley Drive in
Sierra Meadows . Currently there is a single family residence on
the parcel . The proposed project will have a total of two
duplexes.
This project is complete.
Long Subdivision
* This project is located at the end of Tundra Drive in
Tahoe Donner. The project is not within the subdivision
boundaries . There will be three residential parcels within the
subdivision.
Construction of this project is not complete. The developer
has challenged both District and State Department of Health
requirements . Due to these continued challenges and at the
request of the developer, involvement of the District General
f^ Manager was necessary. The developer has been advised of the
projects requirements . I expect project completion next
construction season.
Henrikson Commercial Building
* This project is located on West River Street . The
developer' s are adding 15, 000 square feet to the existing 10, 000
square foot building.
Due to changes in District code/policy additional meters and
or service lines were not required for this addition. The
developer has met all requirements of the District .
Truckee Pines / River Village Intertie
* In order to provide required fireflow for the Truckee
Pines project, installation of an S" line was required. This
looped line was expected to be constructed with the River Village
project . Due to the fact that the River Village project was nor
constructed, this line was installed by the developer' s of
Truckee Pines .
Construction of this line was completed in the late fall .
This section of line will be included with the final
110-1 acceptance of the Truckee Pines Apartments.
Page 4 1995 Project List January 11, 1996
Kendall Project
* This project is located between Ponderosa Ranchos and
Sierra Meadows . This subdivision consists of 8 residential
parcels .
Construction of this project has been complete for more than a
year. Final costs associated with this project have been
disputed and unconditional acceptance has not been approved.
I am working with the General Manager in an effort to finalize
the outstanding issues .
Dependable Tow - West River Street
* This commercial building was constructed a couple of
years ago. This building is on West River Street across from the
Old County Barn.
It is not known whether the building department has issued an
occupancy permit . Water service to the building has been
installed but not activated. The developer will be required
to pay appropriate fire flow facilities fees prior to
connection to our system.
Porter Simon Building
* This commercial building replaced the building
destroyed by the explosion downtown.
=co:mp:letion
nstruction is complete and final acceptance is pending
of a couple of minor items .
Farley 8-Plex
* This is an apartment project on Northwoods Blvd. in
Tahoe Donner.
The developer has not finalized all of the development
agreement requirements . Final acceptance will be delayed
until all of the requirements have been satisfied.
Sierra Pines Condos
* This project is located on Jeffery Pine Road in Sierra
Meadows . This is a condominium project that has been constructed
in phases . The final 4 units were finished in 1995 .
Final project review is pending. 71
Page 5 1995 Project List January 11, 1996
Tahoe Truckee Unified School District
* This project involves the relocation of modular units
on school properties .
Determination of fire flow facilities fees is required. I am
waiting for a report from Sue Camara that will confirm what
fees have been previously paid.
89/80 Properties
* This project is located on Sha Neva Road near the
Forest Service office and the Sanders Well Site. The developers
are proposing construction of retail/commercial/mini storage
improvements .
The developers have requested Sauers Engineering to perform
water system modeling. The results of this modeling will help
the developers to determine the future scope of their project .
Zurich Mini-Storage
* This project is located in Tahoe Donner at the corner
of Zurich and Northwoods Blvd. The project will consist of mini
storage units and a small real estate office.
We have provided information to the developers and are
awaiting their response. Construction is expected in the 1996
�^ construction season.
Wild Cherries Coffee House
* This is a retail coffee/food service business located
in the existing Westgate Shopping Center.
We are waiting for specific design information concerning the
expected water usage. Determination of any required system
modifications will be made after receipt of the requested
information.
Eagle Court
* This is a 4 unit condominium project located on
Northwoods Blvd. in Tahoe Donner.
I am currently working on construction estimates and the
development agreement . Construction is expected in the 1996
construction season.
Page 6 1995 Project List January 11, 1996