HomeMy WebLinkAbout1996-01-11 Min - Board (2) Truckee Donner Public Utility District Board of Directors Joseph R.Aguera J. Ronald Hemig Business Office Planning Services Robert A.Jones (916)587-3896 (916)587-3944 FAX(916)587-5056 James A. Maass Patricia S.Sutton General Manager Peter L. Holzmeister MEMORANDUM Date: January 11, 1996 To: Dave Rully From: Peter Marcovich Subject: System Operations 1995 1995 WATER PRODUCTION BY SOURCE SOURCE GALLONS AIRPORT WELL . . . . . . . . . . . . . . . . . . . . 629, 670, 000 NORTHSIDE WELL . . . . . . . . . . . . . . . . . . . 221, 071, 000 DONNER CREEK WELL . . . . . . . . . . . . . . . . . . 89, 352, 000 SOUTHSIDE WELL . . . . . . . . . . . . . . . . . . . 27, 285, 000 "A" WELL . . . . . . . . . . . . . . . . . . . . . . 32, 524, 300 "B" WELL . . . . . . . . . . . . . . . . . . . . . . 11, 860, 300 PROSSER HEIGHTS WELL . . . . . . . . . . . . . . . . 64, 988, 054 SANDERS WELL . . . . . . . . . . . . . . . . . . . . 28, 719, 000 PROSSER ANNEX WELL . . . . . . . . . . . . . . . . . 24, 506, 000 HIRSCHDALE WELL . . . . . . . . . . . . . . . . . . . . 2, 383, 700 TOTAL . . . . . . . . . . . . . . . . . . . . . . . 1,132,359,354 Post Office Box 309 • 11570 Donner Pass Road Truckee, California 96160 1995 WATER PRODUCTION BY MONTH MONTH GALLONS JANUARY . . . . . . . . . . . . . . . . . . . . . . 63, 092, 790 FEBRUARY . . . . . . . . . . . . . . . . . . . . . . 65, 794, 488 MARCH . . . . . . . . . . . . . . . . . . . . . . . . 57, 872, 933 APRIL . . . . . . . . . . . . . . . . . . . . . . . . 63, 873, 317 MAY . . . . . . . . . . . . . . . . . . . . . . . . . 61, 974, 791 JUNE . . . . . . . . . . . . . . . . . . . . . . . 114, 176, 445 JULY . . . . . . . . . . . . . . . . . . . . . . . . 162, 700, 402 AUGUST . . . . . . . . . . . . . . . . . . . . . . . 167, 889, 904 SEPTEMBER . . . . . . . . . . . . . . . . . . . . . . 137, 536, 294 OCTOBER . . . . . . . . . . . . . . . . . . . . . . . 97, 682, 324 NOVEMBER . . . . . . . . . . . . . . . . . . . . . . 71, 276, 368 DECEMBER . . . . . . . . . . . . . . . . . . . . . . 68, 489, 298 TOTAL IN GALLONS . . . . . . . . . . . . . . . . . 1,132,359,354 TOTAL IN ACRE FEET . . . . . . . . . . . . . . . . . . . . 3475 We were down 5. 64% from 1994 total source production. However, it should be noted that the 1995 total is second only to 1994 in Truckee Donner Public Utility District history. TOTAL WATER PRODUCTION 1978-1995 ` 1400 1200 .- a ° 800 . c _ . 2 800 400 200 0 78 79 80 91 82 83 84 85 86 87 88 89 90 91 92 93 94 95 STATION MAINTENANCE The interiors of Sierra Meadows Tank, both Donner Trails Tanks, Ski Lodge Tank and the Airport Tank were all cleaned. The cupola roof vents on all of our tanks were screened. The end of the drain lines and over flow lines on several of the tanks have been screened. A new hydro-pneumatic tank, new motor and new pump were installed at Ponderosa Palisades West Hydro Station. One new Clayton pump control valve was installed in Donner Trails Booster Station. One new Clayton pump control valve and three new wafer isolation valves were installed in Southside Booster Station. There were some motors, pumps and control valves rebuilt in other stations. New plumbing, packing and other general maintenance was performed. Underground three phase power was brought into Ponderosa Palisades Hydro Station. The standby generator provided power to ,.� the system during scheduled outages. The new domestic pump has been installed. The floor drain from Sanders Well building was plugged with tree roots . A new line was installed. A drain line was installed at the Airport Well sand pit to divert standing water. Sand was cleared from the pit and the perimeter was fenced. In an effort to deter access to our facilities, new gates were installed at the driveways leading to Martiswoods Tank, Glacier Tank and Armstrong Tank. A coat of paint was put on the exterior of Armstrong Tank to cover the excessive amount of graffiti . The interiors of several booster stations were cleaned and painted. Three station driveways were repaired and patched. Trees, shrubs and tall grasses were removed from several booster station and tank sites. A new flow meter was installed in Soma Sierra Booster Station. Preventative maintenance was performed on some control panels . OTHER BUSINESS I have programmed in Time Zone changes on the SCADA work station to minimize pumping during peak electric demand periods . A representative from the Department of Health Services made an annual tour of our facilities. Representatives from the California Energy Commission also toured our facilities . I am currently collecting data they need to make their recommendations. The Prosser Annex Tank was brought on line in March. The new Prosser Heights Tank was brought on line in August. The rehabilitation work was completed and Sanders Well was brought back into service in May. The rehabilitation work was completed and the Northside Well was brought back into service in June. The Prosser Annex Well was brought on line in July. Nearly all of the site work at the Gateway Tank is completed. The retaining wall is in place, the road is cut and paved and the pipeline work is complete. The tank itself is ready to be sand blasted and painted. All of the underground piping for Southside Well has been completed. The new well pump has been set and removed several times, failing to reach designed performance levels. Work was started and continues on the Hirschdale Water Treatment Facilities. The two septic tanks were set and covered, all of the underground piping and conduit was put in place, the concrete floor was finished, the walls were framed, windows and doors were set, the siding was completed and plywood sheeting was put on the roof. The road to the site was repaired and the SCADA antenna relocated. IMTER PRODUCTION SOURCE GALLONS Airport Well . . . . . . . . . . . . . . . . . . . . 33, 085, 000 „A" Well . . . . . . . . . . . . . . . . . . . . . . . 1, 896, 300 "B" Well . . . . . . . . . . . . . . . . . . . . . . . . 657, 500 Donner Creek Well . . . . . . . . . . . . . . . . . . . 8, 975, 000 Southside Well #1 . . . . . . . . . . . . . . . . . . . . . . . 0 Northside Well . . . . . . . . . . . . . . . . . . . 16, 939, 000 Sanders Well . . . . . . . . . . . . . . . . . . . . . 1, 615, 000 Prosser Heights Well . . . . . . . . . . . . . . . . . 2, 458, 398 Prosser Annex Well . . . . . . . . . . . . . . . . . . 2, 734, 000 Hirschdale Well . . . . . . . . . . . . . . . . . . . . . 129, 100 TOTAL PRODUCTION FOR DECEMBER 1995 . . . . . . . . . 68,489,298