Subject: System Operations 1995
1995 WATER PRODUCTION BY SOURCE
SOURCE GALLONS
AIRPORT WELL . . . . . . . . . . . . . . . . . . . . 629, 670, 000
NORTHSIDE WELL . . . . . . . . . . . . . . . . . . . 221, 071, 000
DONNER CREEK WELL . . . . . . . . . . . . . . . . . . 89, 352, 000
SOUTHSIDE WELL . . . . . . . . . . . . . . . . . . . 27, 285, 000
"A" WELL . . . . . . . . . . . . . . . . . . . . . . 32, 524, 300
"B" WELL . . . . . . . . . . . . . . . . . . . . . . 11, 860, 300
PROSSER HEIGHTS WELL . . . . . . . . . . . . . . . . 64, 988, 054
SANDERS WELL . . . . . . . . . . . . . . . . . . . . 28, 719, 000
PROSSER ANNEX WELL . . . . . . . . . . . . . . . . . 24, 506, 000
HIRSCHDALE WELL . . . . . . . . . . . . . . . . . . . . 2, 383, 700
TOTAL . . . . . . . . . . . . . . . . . . . . . . . 1,132,359,354
Post Office Box 309 • 11570 Donner Pass Road Truckee, California 96160
1995 WATER PRODUCTION BY MONTH
MONTH GALLONS
JANUARY . . . . . . . . . . . . . . . . . . . . . . 63, 092, 790
FEBRUARY . . . . . . . . . . . . . . . . . . . . . . 65, 794, 488
MARCH . . . . . . . . . . . . . . . . . . . . . . . . 57, 872, 933
APRIL . . . . . . . . . . . . . . . . . . . . . . . . 63, 873, 317
MAY . . . . . . . . . . . . . . . . . . . . . . . . . 61, 974, 791
JUNE . . . . . . . . . . . . . . . . . . . . . . . 114, 176, 445
JULY . . . . . . . . . . . . . . . . . . . . . . . . 162, 700, 402
AUGUST . . . . . . . . . . . . . . . . . . . . . . . 167, 889, 904
SEPTEMBER . . . . . . . . . . . . . . . . . . . . . . 137, 536, 294
OCTOBER . . . . . . . . . . . . . . . . . . . . . . . 97, 682, 324
NOVEMBER . . . . . . . . . . . . . . . . . . . . . . 71, 276, 368
DECEMBER . . . . . . . . . . . . . . . . . . . . . . 68, 489, 298
TOTAL IN GALLONS . . . . . . . . . . . . . . . . . 1,132,359,354
TOTAL IN ACRE FEET . . . . . . . . . . . . . . . . . . . . 3475
We were down 5. 64% from 1994 total source production. However,
it should be noted that the 1995 total is second only to 1994 in
Truckee Donner Public Utility District history.
TOTAL WATER PRODUCTION
1978-1995
` 1400
1200 .-
a ° 800 .
c _ .
2 800
400
200
0
78 79 80 91 82 83 84 85 86 87 88 89 90 91 92 93 94 95
STATION MAINTENANCE
The interiors of Sierra Meadows Tank, both Donner Trails Tanks,
Ski Lodge Tank and the Airport Tank were all cleaned.
The cupola roof vents on all of our tanks were screened. The end
of the drain lines and over flow lines on several of the tanks
have been screened.
A new hydro-pneumatic tank, new motor and new pump were installed
at Ponderosa Palisades West Hydro Station.
One new Clayton pump control valve was installed in Donner Trails
Booster Station.
One new Clayton pump control valve and three new wafer isolation
valves were installed in Southside Booster Station.
There were some motors, pumps and control valves rebuilt in other
stations. New plumbing, packing and other general maintenance
was performed.
Underground three phase power was brought into Ponderosa
Palisades Hydro Station. The standby generator provided power to
,.� the system during scheduled outages. The new domestic pump has
been installed.
The floor drain from Sanders Well building was plugged with tree
roots . A new line was installed.
A drain line was installed at the Airport Well sand pit to divert
standing water. Sand was cleared from the pit and the perimeter
was fenced.
In an effort to deter access to our facilities, new gates were
installed at the driveways leading to Martiswoods Tank, Glacier
Tank and Armstrong Tank.
A coat of paint was put on the exterior of Armstrong Tank to
cover the excessive amount of graffiti .
The interiors of several booster stations were cleaned and
painted.
Three station driveways were repaired and patched.
Trees, shrubs and tall grasses were removed from several booster
station and tank sites.
A new flow meter was installed in Soma Sierra Booster Station.
Preventative maintenance was performed on some control panels .
OTHER BUSINESS
I have programmed in Time Zone changes on the SCADA work station
to minimize pumping during peak electric demand periods .
A representative from the Department of Health Services made an
annual tour of our facilities.
Representatives from the California Energy Commission also toured
our facilities . I am currently collecting data they need to make
their recommendations.
The Prosser Annex Tank was brought on line in March.
The new Prosser Heights Tank was brought on line in August.
The rehabilitation work was completed and Sanders Well was
brought back into service in May.
The rehabilitation work was completed and the Northside Well was
brought back into service in June.
The Prosser Annex Well was brought on line in July.
Nearly all of the site work at the Gateway Tank is completed.
The retaining wall is in place, the road is cut and paved and the
pipeline work is complete. The tank itself is ready to be sand
blasted and painted.
All of the underground piping for Southside Well has been
completed. The new well pump has been set and removed several
times, failing to reach designed performance levels.
Work was started and continues on the Hirschdale Water Treatment
Facilities. The two septic tanks were set and covered, all of
the underground piping and conduit was put in place, the concrete
floor was finished, the walls were framed, windows and doors were
set, the siding was completed and plywood sheeting was put on the
roof. The road to the site was repaired and the SCADA antenna
relocated.
IMTER PRODUCTION
SOURCE GALLONS
Airport Well . . . . . . . . . . . . . . . . . . . . 33, 085, 000
„A" Well . . . . . . . . . . . . . . . . . . . . . . . 1, 896, 300
"B" Well . . . . . . . . . . . . . . . . . . . . . . . . 657, 500
Donner Creek Well . . . . . . . . . . . . . . . . . . . 8, 975, 000
Southside Well #1 . . . . . . . . . . . . . . . . . . . . . . . 0
Northside Well . . . . . . . . . . . . . . . . . . . 16, 939, 000
Sanders Well . . . . . . . . . . . . . . . . . . . . . 1, 615, 000
Prosser Heights Well . . . . . . . . . . . . . . . . . 2, 458, 398
Prosser Annex Well . . . . . . . . . . . . . . . . . . 2, 734, 000
Hirschdale Well . . . . . . . . . . . . . . . . . . . . . 129, 100
TOTAL PRODUCTION FOR DECEMBER 1995 . . . . . . . . . 68,489,298