WATER DEPARTMENT ACTIVITIES REPORT FOR JANUARY 1996
February 15, 1996
WATER QUALITY:
See attached bacteriological report.
I have been reviewing the District 's source water quality analysis
to update our yearly customer mailer due in April .
George and I reviewed and signed copies of our depositions for the
Josephine 's explosion.
MAINTENANCE, REPAIRS & NEW CONSTRUCTION:
eon,*, Service connections continued in January with a total of 3 new
hook-ups and 2 service up-grades.
Staff repaired 3 leaks, repaired 1 fire hydrant and responded to 17
USA requests. As of February 14, there were 5 known leaks
throughout the District service area, they will be repaired as
scheduling permits.
Snow removal activities picked up considerably in January.
Call has been quiet with a minimum of system related problems. We
have received a few customer related frozen pipe calls.
We finally received the record drawings on the 1991 pipeline
replacement project from SEA. We have made several copies (app. 100
sheets per copy) . Staff has been using them to edit the
improvement plans received from Southwest Gas for this summers
construction project.
WATER PLANNING DEPARTMENT:
See attached report from Mike Connell, Water Dept. Planner.
Paul, Mike and myself have been working with Sauers Engineering to
develop the improvement plans for the 1996 pipeline replacement
project in Tahoe Donner and Edmunds Drive.
Post Office Box 309 • 11570 Donner Pass Road Truckee, California 96160
PEW OPERATIONS / PROJECTS:
See attached report from Pete Marcovich, Water Operations
Specialist.
Southside Well #2 rehab is still in limbo as we await the correct
pump from the manufacturer.
Sargent Irrigation has begun drilling the new Glenshire Drive Well .
Staff is making good progress cleaning, painting and repairing the
pump stations.
Truckee Donner Public Utility District Board of Directors
Joseph R.Aguera
J. Ronald Hemig
Business Office Planning Services Robert A.Jones
(916)587-3896 (916)587-3944 FAX(916)587-5056 James A. Maass
Patricia S.Sutton
General Manager
Peter L. Holzmeister
MEMORANDUM
Date: February 14, 1996
To: Peter Holzmeister
From: David Rully 4K
Subject : Monthly Bacteriological Report - January, 1996
Attached is the "Summary of Bacteriological Water Quality" report
for the month of January.
The January portion of the report shows that all 41
�.., distribution system samples were free of coliform bacteria. The
report also shows that 40 source samples were free of coliform
bacteria.
The District has met the State ' s drinking water standards for the
month of January.
Post Office Box 309 • 11570 Donner Pass Road Truckee, California 96160
SUMMARY OF BACTERIOLICAL WATER QUALITY
TRUCKEE DONNER PUBLIC UTILITY DISTRICT
System Source
Samples Portions Percent Samples Portions Percent
Yr. /Month Collected Positive Positive Collected Positive Positive
1996
January
(Truckee) 32 0 0 25 1 04%
(Prosser) 8 0 0 15 0 0
(Hirschdale) 1 0 0 1 0 0