Loading...
HomeMy WebLinkAbout1996-02-15 Min - Board (3) Truckee Donner Public Utility District Board of Directors Joseph R.Aguera /•� J.Ronald Hemig f Business Office Planning Services Robert A.Jones (916)587-3896 (916)587-3944 FAX(916)587-5056 James A.Maass Patricia S.Sutton General Manager Peter L.Holzmeister WATER DEPARTMENT ACTIVITIES REPORT FOR JANUARY 1996 February 15, 1996 WATER QUALITY: See attached bacteriological report. I have been reviewing the District 's source water quality analysis to update our yearly customer mailer due in April . George and I reviewed and signed copies of our depositions for the Josephine 's explosion. MAINTENANCE, REPAIRS & NEW CONSTRUCTION: eon,*, Service connections continued in January with a total of 3 new hook-ups and 2 service up-grades. Staff repaired 3 leaks, repaired 1 fire hydrant and responded to 17 USA requests. As of February 14, there were 5 known leaks throughout the District service area, they will be repaired as scheduling permits. Snow removal activities picked up considerably in January. Call has been quiet with a minimum of system related problems. We have received a few customer related frozen pipe calls. We finally received the record drawings on the 1991 pipeline replacement project from SEA. We have made several copies (app. 100 sheets per copy) . Staff has been using them to edit the improvement plans received from Southwest Gas for this summers construction project. WATER PLANNING DEPARTMENT: See attached report from Mike Connell, Water Dept. Planner. Paul, Mike and myself have been working with Sauers Engineering to develop the improvement plans for the 1996 pipeline replacement project in Tahoe Donner and Edmunds Drive. Post Office Box 309 • 11570 Donner Pass Road Truckee, California 96160 PEW OPERATIONS / PROJECTS: See attached report from Pete Marcovich, Water Operations Specialist. Southside Well #2 rehab is still in limbo as we await the correct pump from the manufacturer. Sargent Irrigation has begun drilling the new Glenshire Drive Well . Staff is making good progress cleaning, painting and repairing the pump stations. Truckee Donner Public Utility District Board of Directors Joseph R.Aguera J. Ronald Hemig Business Office Planning Services Robert A.Jones (916)587-3896 (916)587-3944 FAX(916)587-5056 James A. Maass Patricia S.Sutton General Manager Peter L. Holzmeister MEMORANDUM Date: February 14, 1996 To: Peter Holzmeister From: David Rully 4K Subject : Monthly Bacteriological Report - January, 1996 Attached is the "Summary of Bacteriological Water Quality" report for the month of January. The January portion of the report shows that all 41 �.., distribution system samples were free of coliform bacteria. The report also shows that 40 source samples were free of coliform bacteria. The District has met the State ' s drinking water standards for the month of January. Post Office Box 309 • 11570 Donner Pass Road Truckee, California 96160 SUMMARY OF BACTERIOLICAL WATER QUALITY TRUCKEE DONNER PUBLIC UTILITY DISTRICT System Source Samples Portions Percent Samples Portions Percent Yr. /Month Collected Positive Positive Collected Positive Positive 1996 January (Truckee) 32 0 0 25 1 04% (Prosser) 8 0 0 15 0 0 (Hirschdale) 1 0 0 1 0 0