MEMORANDUM
Date: February 14, 1996
To: Dave Rully
From: Peter Marcovich ' qT4
Subject: Monthly Report for January 1996
STATION MAINTENANCE
Plastic drain lines and copper drain lines were installed at
Southside Booster Station in an effort to keep water off the
floor. New packing was installed in each of the four boosters.
The interior of the booster room was painted and the piping
manifold inside the station was painted. A leak in the yard
piping just outside the building was repaired.
Plastic drain lines and copper drain lines were installed at
Northside Booster Station in an effort to keep water off the
floor. New packing was installed in each of the three boosters.
The interiors of both the Well room and the booster room were
cleaned and painted. The manifold inside the booster station was
painted.
Several items on the Department of Health Services list have been
repaired, screened or plugged this month.
I have continued to program in Time Zone changes to minimize
pumping during peak electric demand periods.
Snow was removed from all of our facilities this month by the
water crew.
Post Office Box 309 11570 Donner Pass Road Truckee, California 96160
The entry lock on the door at Prosser Heights Hydro Station was
replaced. A new heater coil was installed.
WATER QUALITY
Water samples were taken the five tuesdays of the month. Routine
daily rounds were made, taking chlorine residuals throughout the
system.
OTHER BUSINESS
I have continued to monitor the work at Southside Well #2 . The
pump was pulled and set several times by the contractor but was
never able to meet design specifications . The contractor is
waiting for a new pump to be shipped by the manufacturer.
Continued to communicate with Sandel-Avery Engineering regarding
ongoing site problems and SCADA programming.
Representatives from the California Energy Commission toured our
facilities late last year. I am continuing to gather data on our
entire system to give them. I sent one large packet of pump
station information to them in January, and I anticipate I ' ll be
sending the completed package sometime in February.
WATER PRODUCTION
SOURCE GALLONS
Airport Well . . . . . . . . . . . . . . . . . . . . 34, 219, 000
Nouthside Well . . . . . . . . . . . . . . . . . . . 16, 778, 000
Donner Creek Well . . . . . . . . . . . . . . . . . . 15, 063, 000
Southside Well . . . . . . . . . . . . . . . . . . . . . . . . 0
"A" Well Well . . . . . . . . . . . . . . . . . . . . . . . . 729, 800
►►B►► Well . . . . . . . . . . . . . . . . . . . . . . . . 262, 300
Prosser Heights Well . . . . . . . . . . . . . . . . . 2, 094, 406
Sanders Well . . . . . . . . . . . . . . . . . . . . . 1, 596, 000
Prosser Annex Well . . . . . . . . . . . . . . . . . . 2, 741, 000
Hirschdale Well . . . . . . . . . . . . . . . . . . . . . 114, 300
TOTAL PRODUCTION FOR JANUARY 1996 . . . . . . . . . . 73,597,806