Loading...
HomeMy WebLinkAbout1996-02-14 Min - Board Truckee Donner Public Utility District Board of Directors Joseph R.Aguera J.Ronald Hemig Business Office Planning Services Robert A.Jones (916)587-3896 (916)587-3944 FAX(916)587-5056 James A. Maass Patricia S.Sutton General Manager Peter L. Holzmeister MEMORANDUM Date: February 14, 1996 To: Dave Rully From: Peter Marcovich ' qT4 Subject: Monthly Report for January 1996 STATION MAINTENANCE Plastic drain lines and copper drain lines were installed at Southside Booster Station in an effort to keep water off the floor. New packing was installed in each of the four boosters. The interior of the booster room was painted and the piping manifold inside the station was painted. A leak in the yard piping just outside the building was repaired. Plastic drain lines and copper drain lines were installed at Northside Booster Station in an effort to keep water off the floor. New packing was installed in each of the three boosters. The interiors of both the Well room and the booster room were cleaned and painted. The manifold inside the booster station was painted. Several items on the Department of Health Services list have been repaired, screened or plugged this month. I have continued to program in Time Zone changes to minimize pumping during peak electric demand periods. Snow was removed from all of our facilities this month by the water crew. Post Office Box 309 11570 Donner Pass Road Truckee, California 96160 The entry lock on the door at Prosser Heights Hydro Station was replaced. A new heater coil was installed. WATER QUALITY Water samples were taken the five tuesdays of the month. Routine daily rounds were made, taking chlorine residuals throughout the system. OTHER BUSINESS I have continued to monitor the work at Southside Well #2 . The pump was pulled and set several times by the contractor but was never able to meet design specifications . The contractor is waiting for a new pump to be shipped by the manufacturer. Continued to communicate with Sandel-Avery Engineering regarding ongoing site problems and SCADA programming. Representatives from the California Energy Commission toured our facilities late last year. I am continuing to gather data on our entire system to give them. I sent one large packet of pump station information to them in January, and I anticipate I ' ll be sending the completed package sometime in February. WATER PRODUCTION SOURCE GALLONS Airport Well . . . . . . . . . . . . . . . . . . . . 34, 219, 000 Nouthside Well . . . . . . . . . . . . . . . . . . . 16, 778, 000 Donner Creek Well . . . . . . . . . . . . . . . . . . 15, 063, 000 Southside Well . . . . . . . . . . . . . . . . . . . . . . . . 0 "A" Well Well . . . . . . . . . . . . . . . . . . . . . . . . 729, 800 ►►B►► Well . . . . . . . . . . . . . . . . . . . . . . . . 262, 300 Prosser Heights Well . . . . . . . . . . . . . . . . . 2, 094, 406 Sanders Well . . . . . . . . . . . . . . . . . . . . . 1, 596, 000 Prosser Annex Well . . . . . . . . . . . . . . . . . . 2, 741, 000 Hirschdale Well . . . . . . . . . . . . . . . . . . . . . 114, 300 TOTAL PRODUCTION FOR JANUARY 1996 . . . . . . . . . . 73,597,806