Loading...
HomeMy WebLinkAbout2005-12-21 Min - Board REGULAR MEETING December 21, 2005 In accordance with District Code Section 2.08.010, the TDPUD minutes are action only minutes. All Board meetings are recorded on audio tapes which are preserved perpetually and made available for listening to any interested party upon their request. The regular meeting of the Board of Directors of the Truckee Donner Public Utility District was called to order at 7:03 PM in the TDPUD Board room by President Hemig. ROLL CALL: Directors Joe Aguera, Ron Hemig, Patricia Sutton, Tim Taylor and Bill Thomason were present. EMPLOYEES PRESENT: Mary Chapman, Scott Terrell, Ed Taylor, Kim Szczurek, Nancy Waters, Tammie McCollum, Jessica Kosfiszer, Neil Kaufman Pat Waite, Joe Horvath, Jim Wilson, Peter Holzmeister, Barbara Cahill and Sanna Schlosser. CONSULTANTS PRESENT: Steve Gross OTHERS PRESENT: Frank &Juanita Schneider, Bill Quesnel, Pat Davison and Christine Stanley PUBLIC INPUT There was no public input. CONSIDERATION OF A RESOLUTION DISPENSING WITH BIDDING AND AUTHORIZING THE PURCHASE OF ELECTRIC SYSTEM TRANSFORMERS Director Sutton moved and Director Aguera seconded, a motion to refer the matter to the District Counsel to review the transformer purchase contract and make preliminary contact with the TDPUD vendors; and to return to the board with additional information for action. ROLL CALL: All Directors, aye. SO MOVED. CONSIDERATION OF A CLOSE OUT CONTRACT CHANGE ORDER AND A RESOLUTION ACCEPTING THE INSTALLATION OF ELECTRICAL CONDUIT AT DONNER STATE PARK PROJECT AND AUTHORIZING CIRCULATION OF A NOTICE OF COMPLETION Director Taylor moved and Director Thomason seconded, a motion that the Board authorize Con- tract Change Order #1, reducing the contract price by $45,549.15 to Hard Line Excavating Inc., bringing the total of the contract to $345,950.85 for the Installation of Electric Conduit and Vaults in Donner State Park Project. ROLL CALL: All Directors, aye. SO MOVED. Director Taylor moved and Director Thomason seconded, a motion that the Board pass a Resolu- tion accepting the Installation of Electric Conduit and Vaults in Donner State Park Project as com- plete and authorizing the filing of the notice of completion. ROLL CALL: All Directors, aye. SO MOVED. 1 Minutes: Dec. 21, 2005 CONSIDERATION OF A RESOLUTION ACCEPTING THE DONNER LAKE TANK PROJECT AND AUTHORIZING CIRCULATION OF A NOTICE OF COMPLETION Director Aguera moved and Director Taylor seconded, a motion that the Board pass a Resolution accepting the Donner Lake 6323 Tank Project as complete and authorizing the filing of the notice of completion. ROLL CALL: All Directors, aye. SO MOVED. CONSIDERATION OF CONTINUING THE EMERGENCY ACTION RELATED TO PURCHASE OF A TRANSFORMER FOR THE TAHOE DONNER SUBSTATION Director Aguera moved and Director Taylor seconded, a motion that the Board continue the emer- gency action relating to the Tahoe Donner Substation Transformer. ROLL CALL: All Directors, aye by voice vote. SO MOVED. WORKSHOP ITEM DISCUSSION OF THE DRAFT BUDGET FOR 2006 AND RELATED MATTERS Various points discussed: • Prudent to recommend an increase of 2%for the reserves • Need to look beyond 2006 for the power supply since our current contract expires in 2008. The District will be in a good financial position in 2012 when the IDACORP contract buyout is paid off and the District can access power with IPP • Ways to eliminate expenses. Request that staff be specific on items they can do without. • Once budget is passed, the board wants a report in six months to see how expenses are matching up with the budget • Track broadband expenses • Continue with Public Outreach President Hemig stated that the board needs a general consensus to wrap up the budget process and have a public hearing. The Board agreed to hold a public hearing on January 4, 2006 and schedule action on January 18, 2006. STAFF REPORTS Mr. Holzmeister distributed his staff report which included the judgment decision in the case of Ce- bridge vs. LAFCo. LAFCo and the TDPUD have prevailed on all issues. Director Sutton asked that Mary Chapman's staff report regarding the cost to return to processing customer payments in-house be placed on a future agenda. ROUTINE BUSINESS TREASURER'S REPORT Approval of the report: Director Thomason moved, and Director Aguera seconded, that the Board approve the month ended November 2005. ROLL CALL: All Directors aye, by voice vote. SO MOVED 2 Minutes: Dec. 21, 2005 Approval of disbursements: Director Aguera moved, and Director Thomason seconded, that the Board approve the November 2005 disbursements report. ROLL CALL: Director Sutton, no; All other Directors, aye. SO MOVED. CLOSED SESSION CONFERENCE WITH LEGAL COUNSEL — REAL PROPERTY NEGOTIATIONS PURSUANT TO SECTION 54956.8 OF THE GOVERNMENT CODE. Item postponed to future board meeting. ADJOURNMENT There being no further business before the Board, the meeting was adjourned at 8:41 PM. TRUCKEE NNER P IC UTILITY D TRICT J. Ro ig, Presi ent Prepared by Barbara Cahill, Deputy District Clerk bhc 3 Minutes: Dec. 21, 2005 TRUCKEE • i Public Utility District pr Resolution No. 2005 - 36 AUTHORIZING THE ACCEPTANCE OF THE INSTALLATION OF CONDUIT AND VAULTS IN DONNER STATE PARK PROJECT AND DIRECTING FILING OF THE NOTICE OF COMPLETION WHEREAS, the Board of Directors of the Truckee Donner Public Utility District made the determination to undertake the Installation of Conduit and Vaults in Donner State Park Project; and WHEREAS, Hard Line Excavating, Inc.was selected by the District to perform the work; and WHEREAS, Hard Line Excavating, Inc. has completed all of the Work included in the Project; and WHEREAS, The District Associate Electrical Engineer, Sanna Schlosser, now certifies the completion of the project; and WHEREAS, the District's Electric Utility Manager, Steve Hollabaugh, has recommended that the work be accepted by the District; NOW THEREFORE BE IT RESOLVED by the Board of Directors of the District as follows: t. That the District hereby accepts the Installation of Conduits and Vaults in Donner State Park Project as complete. 2. That the Clerk of the District be directed to file with the County of Nevada the Notice of Completion, a copy of which is attached hereto. 3. That 35 days following the filing of the Notice of Completion, the monies retained from the contractor payments be released to the contractor if no claims have been made to the District by material suppliers or laborers. PASSED AND ADOPTED by the Board of Directors at a meeting duly called and held within the District on the 21st day of December 2005 by the following roll call vote: AYES: Directors Aguera, Hemig, Sutton, Taylor and Thomason NOES: None ABSTAIN: None ABSENT: None TRUCKEE D NNER P LIC UTILI DISTRICT By J. Ron Kern President of the Board ATTEST Peter L. Holzmeister, Clerk of the Board RECORDING REQUESTED BY: Truckee Donner Public Utility District WHEN RECORDED, RETURN TO: TRUCKEE DONNER PUBLIC UTILITY DISTRICT Post Office Box 309 Truckee, CA 96160 THE UNDERSIGNED DECLARES DOCUMENTARY TRANSFER TAX-NONE NOTICE OF COMPLETION NOTICE IS HEREBY GIVEN: 1. That the name and address of the public entity for whom the improvement project was done, as owner thereof, is the Truckee Donner Public Utility District, Post Office Box 309, Truckee, CA 96160. 2. Nature of interest or estate of owner: beneficial interest of a public utility easement for installation of water facilities. 3. That on December 21 st, 2005 the hereinafter described improvements were accepted as complete pursuant to Resolution 2005-36 of the Truckee Donner Public Utility District, the awarding authority. 4. That the subject improvements of the Notice are generally described and identified as follows: Installation of Electric Conduit and Vaults in Donner State Park 5. That the name and address of the contractor for such project was: Hard Line Excavating, Inc., P.O. Box 10029, Truckee, Ca. 96162 I certify under penalty of perjury under the laws of the State of 1 California that the foregoing is true and correct. Dated: , TRUCKEE DONNER PUBLIC UTILITY DISTRICT By ; Peter I Holzmeister, General Manager MAIL TAX STATEMENTS TO: SAME AS ABOVE Legal References: CC-3093,CCP-2003(oath), 2015.5(unsworn statement) --�`TRIRUICKEE DONNER Public Resolution No. 2005 - 37 AUTHORIZING THE ACCEPTANCE OF DONNER LAKE 6323 TANK PROJECT AND DIRECTING FILING OF THE NOTICE OF COMPLETION WHEREAS, the Board of Directors of the Truckee Donner Public Utility District made the determination to undertake the Donner Lake 6323 Tank Project; and WHEREAS, Crosno Construction Inc. was selected by the District to perform the work; and WHEREAS, Crosno Construction Inc. has completed all of the Work included in the Project; and WHEREAS, The District's Engineer, Neil Kaufman, now certifies the completion of the project; and WHEREAS,the District's Water Utility Manager, Ed Taylor, has recommended that the work be accepted by the District; NOW THEREFORE BE IT RESOLVED by the Board of Directors of the District as follows: 1. That the District hereby accepts the Donner Lake 6323 Tank Project as complete. 2. That the Clerk of the District be directed to file with the County of Nevada the Notice of Completion, a copy of which is attached hereto. 3. That 35 days following the filing of the Notice of Completion, the monies retained from the contractor payments be released to the contractor if no claims have been made to the District by material suppliers or laborers. PASSED AND ADOPTED by the Board of Directors at a meeting duly called and held within the District on the 21st day of December 2005 by the following roll call vote: AYES: NOES: ABSTAIN: ABSENT: TRUCKEE DONNE UBLIC UT L TY DISTRICT By J. Ro ig, Oresident of the Board ATTEST = j Peter L. Holzmeister, Clerk of the Board RECORDING REQUESTED BY: Truckee Donner Public Utility District WHEN RECORDED, RETURN TO: TRUCKEE DONNER PUBLIC UTILITY DISTRICT Post Office Box 309 Truckee, CA 96160 THE UNDERSIGNED DECLARES DOCUMENTARY TRANSFER TAX-NONE NOTICE OF COMPLETION NOTICE IS HEREBY GIVEN: 1. That the name and address of the public entity for whom the improvement project was done, as owner thereof, is the Truckee Donner Public Utility District, Post Office Box 309, Truckee, CA 96160. 2. Nature of interest or estate of owner: beneficial interest of a public utility easement for installation of water facilities. 3. That on December 21 st, 2005 the hereinafter described improvements were accepted as complete pursuant to Resolution 2005-37 of the Truckee Donner Public Utility District, the awarding authority. 4. That the subject improvements of the Notice are generally described and identified as follows: One 300,000 gallon water storage tank and appurtenances, tank foundation, tank under drain system, and ancillary items such as pipe, fittings,'` locator wire, marking tape and other appurtenances located approximately 1,400 feet southeast of the intersection of Donner Lake Road and Interstate 80, Truckee, Ca.. 5. That the name and address of the contractor for such project was: Crosno Construction Inc., 980 Ambrosia Lane, San Luis Obispo, CA 93401. I certify under penalty of perjury under the laws of the State of California that the foregoing is true and correct. Dated: Z x ` TRUCKEE DONNER PUBLIC UTILITY DISTRICT Peter I.. Ho zmeister, General Manager MAIL TAX STATEMENTS TO: SAME AS ABOVE Legal References: CC-3093,CCP-2003 (oath), 2015.5 (unsworn statement) Agenda Item # Public Utility District Staff Report To: Board of Directors From: Mary Chapman Date: December 15, 2005 CUSTOMER SERVICE: The customer services staff has been "very, very busy' doing ski lease transfers. The transfer requests are just now starting to slow down a little. I expect they will pick up again once the snow flies. I asked the customer services staff specifically if they have received any comments or complaints regarding the proposed rate increases. They said "no, not any'. MONTHLY WORK: Our monthly work is current. This includes meter reading, billing, accounts payable, payroll and general ledger. We still have a lot of work orders to close before we close our books for 2005. While the process of closing a work order is automated, the development agreements are very time consuming and there are a lot of them. We need to continue our efforts to streamline this process. Included in this agenda is the November treasurer's report. STAFFING: As most of you know, Rosana Matlock has given her notice that she is retiring. Rosana and her husband are moving to Kauai. Her last day will be January 13th. Rosana has worked for the District for over 15 years, has provided a lot of leadership to the office staff and will be sorely missed. We posted Rosana's position of billing supervisor in-house as the union contract requires. No one bid on the position. We then went to the outside to fill the position. We had 10 applicants that came and took the written test. Fortunately, there was one applicant with an excellent background that we offered the position to and she accepted. Her name is Lauren Schaake. Some of you may know her as she has been active in the community. Lauren is the current president of Soroptimist's and has a degree in electrical engineering. Lauren starts on December 191h. I'm hoping she's a fast learner as there is a lot to learn and do before Rosana leaves. AUDITORS: Two representatives came this week from Virchow Krause our new auditing firm. Their names are Jodi Dobson and Sarah Schleede. Both of them are CPAs. They came on Wednesday and left today. This visit was the preliminary audit visit. They will be back again at the beginning of April to complete the audit. We will be sending them lots of information between now and then. SPECIAL REQUEST BY DIRECTOR SUTTON: Director Sutton had requested that I provide her information on how much it would cost to hire an employee to process payments in-house instead of having them mailed to the lockbox. I have attached an estimate of the cost. I believe that it would take someone at least six hours a day to both open the mail and process the payments. And, that is provided that they are here and the equipment is working. As the department manager I can tell you that the system is working very well. I really would hope that the board would not bring the process back in house. ESTIMATED COST TO RETURN TO PROCESSING CUSTOMER PAYMENTS IN-HOUSE Hire new employee-General Clerk level Pay scale between$13.52/hour and$19.23 per hour(average$16.37/hour) $34,049.60 Employee benefits @ 83.67% 28,489.30 Maintenance on equipment 6,750.00 Supplies 765.00 $70,053.90 3/4 of an employee $25,537.20 Employee benefits @ 83.67% 21,366.98 Maintenance on equipment 6,750.00 Supplies 765.00 $54,419.18 See Note Currently paying to NISC $24,000.00 Note: This would be the minimum requirement. The work load on other staff would be affected during times of vacation and sick leave. Agenda n a Item # #.UCKEE s Public Utility District Staff Report To: Board of Directors From: Ed Taylor Date: December 14, 2005 Subject: Water Department Monthly Staff Report Water Department Capital Projects—Office Engineering The following is a brief summary of the projects currently underway: • Brockway Road Transmission Pipeline— The field surveys associated with the project have been completed. The CEQA Draft Initial Study has been completed and will be presented to the Board at the January 4, 2006 meeting. A license agreement with the Union Pacific Railroad for the pipeline crossing will also be presented at the January 4, 2006 meeting. • District Pipeline Replacement 2006— I have begun working of the design of this project. A proposal from Inland Ecosystems to prepare the CEQA Initial Study associated with this project will be presented at the January 4, 2006 meeting. • Interstate 80 Pipeline Crossing at Moraine Road — I have been working with Caltrans regarding the existing water pipeline that crosses 1-80 from the east end of Moraine Road to the west end of Richards Boulevard. Caltrans has been planning on widening westbound 1-80 from the existing Agricultural Inspection Station to the Donner Lake interchange for a number of years. A potential conflict between the highway construction and the existing water pipe has been identified. I am currently discussing various options with Caltrans to address this issue. Water Department Capital Projects—Construction Inspection Mark Harrigan has completed his inspection duties and has been transferred back to Operations and Maintenance. Jessica Kosfiszer has been inspecting the Donner Lake Tank project. • District Pipeline Replacement — 2005 — This project has been completed. The Notice of Completion has been filed with Nevada County. • Donner Lake Pipelines —2005 — This project has been completed. The Notice of Completion was filed with Nevada County on November 28. • Donner Lake Road Storage Tank—The Donner Lake Tank Earthwork& Piping contract has been completed. The Notice of Completion was filed with Nevada County on November 8. Work on the Donner Lake 6323 Tank contract has been completed. I will request that the Board accept the project at the December 21 meeting. • Old Greenwood Well — Well is complete with a pump test capacity of 2,400 GPM. Plans are prepared for the well building, and because of the high capacity of the well, a pump station is needed. This will be a similar setup as the Airport Well and Pump Station. Developer Projects Developer Projects—Office Engineering Mike Connell has spent time working on projects submitted by developers. As of December 14, there is no backlog. The District has reviewed all submitted projects and responded to the developer. We are currently awaiting resubmittals on a number of projects. Developer Projects—Construction Inspection Construction by developers is almost completed for 2005. Paul Rose and Mike Connell have been conducting post construction inspections and generating punch lists on a number of projects. There are currently about 60 projects in the process somewhere between Plan Approval and Final Acceptance. Water Department—Operations & Maintenance Distributions In the Month of October and November,the distribution crew has repaired another 36 mainline and service line leaks. This brings us to 144 repaired leaks this year so far. And that leaves us as of December 13, 8 more leaks on the list to be repaired. Crew time was also spent time hooking up another 36 open trenches (new meter sets). And with the construction season in full swing about 5 to 6 hours per day has been spent on — marking out USA tickets in October. In November, construction slowed down and we were able to put 2 people on full time to meter replacement. Since the beginning of November, they have completed one half of the repairs and replacement on the broken meter list. In the mix were also 6 hot taps 2" and larger. We also started with Fire hydrant repair. Operations: In October and November, the Operations Crew spent more time returning Green Point Springs back to Donner Lake. They also continued building Red Mountain pump station in the last two months. The walls went up and the roof went on, floor got poured and most of the electrical panels were installed. With Staff acting as the General on the project and the staff doing some of the work on the pump stations, we are saving on average $100,000 per station built. The projects were completed along with normal duties of pumping water and maintaining the pump stations. Water Quality Water Quality has been working on the backflow program. He has been out doing Cross Connection Control Surveys of the different business in the District. He also took the yearly nitrates samples of all the wells and the 4th quarter radioactivity samples. Contract Administrator The Donner Lake Water Rehabilitation final payment submittal for the SRF has been sent to the Department of Health Services. Capital improvement projects are winding down with close out paperwork. New Development agreements have continued to come in. Many developer projects are complete requiring finals, as-builts and documents to record. 2 Agenda ItemIF # _4TRUCKEE DONNER Public Staff Report To: Board of Directors From: Alan Harry, Manager Telecomm Services / Support Services Subject: Staff Activity Report; November 105 Date: December 14, 2005 Broadband/ FTTU: On November 7, 2005 Nevada County Superior Court Judge Dover heard testimony from LAFCo, District and Cebridge legal counsel. At the close of the hearing Judge Dover advised Counsel that he had ninety-days to issue his written decision. As such, we may not see the decision until the later part of January 2006. Support Services: After readying our facilities for the "upcoming winter", relocating those materials generally not accessed once the snow sticks, we have found ourselves pulling items from the "north forty' as they were needed by the electric and water crews for jobs not yet completed. The rain experienced during November once again reminded us that we have a serious water leak issue to correct at our Donner Pass facility. As such we have had two roofing contractors survey the condition of the roof and have found that with the addition of correctly fitted flashing material the leaks should subside. During 2006 we will prepare a set of specifications for the patching and replacement of the metal roof in 2007. The warehouse has been staying quite busy with the good weather allowing continued construction, and the need to complete the necessary cycle counts to close out 2005. During the busiest months, June through October, we added a temporary seasonal helper which allowed us to keep ahead of the game, ensuring that electric and water material orders were completed on time, and at times ahead of schedule. Fleet maintenance has been quite busy. Along with ongoing maintenance of existing vehicles and equipment we took possession of four new replacement vehicles. These vehicles have been brought into service after the installation of the necessary safety, radio and computer equipment. Two additional vehicles, approved in the 2005 Budget, will arrive in sixty to ninety days. Page 1 Agenda Item # 9 E,2� . DONNER Public Utility District -4 Staff Report To: Board of Directors From: Kathy Neus, Project Manager Date: December 14, 2005 Monthly Activity Report Saint Mary's Wellness Center was at the District on Wednesday December 7th to give flu shots to employees, spouses, significant others and children over 12 from 8-10:00 am in PUD Board Conference Room. There were 27 participants which wasn't bad considering how late the shots were. The District is on Saint Mary's calendar for next year. Hearing and Eye Tests were scheduled for November 7th and 8th; thirty-five employees participated. There will be more chair massages in December. A Winter Driving class was presented by the California Highway Patrol on December 7th; it was a good reminder for all. The basics of the District's Wellness Program have been tentatively put together; the Health Fair with screenings is currently scheduled for February 9, 2006. The Health Fair is open to the Directors and their spouses. The Corporation Yard still occupies my time. I have a current biological and cultural study; Inland Ecosystems has prepared a preliminary Storm Water Pollution Prevent Plan (SWPP) for the Corporation yard. Holdrege and Kull have completed the geotechnical report of the anticipated footprint for the new corporation yard. Holdrege and Kull have been working on the Phase 1 Environmental Review of the Del Oro Water Company office building lots. Holdrege and Kull have completed the Phase I Environmental report and nothing out of the ordinary has been found. have received the appraisals for Somerset Dr in Glenshire and Richards Blvd. I am still waiting on Donner Lake and the Hilltop properties. I am expecting the Donner Lake appraisal by the next week and hopefully the Hilltop parcels by Christmas. Agenda ItemTRU # i E DONNER DistrictPublic Utility Staff Report To: Board of Directors From: Scott Terrell Date: December 13, 2005 Note: Since most of these projects are ongoing, Staff continues to report the basic information and highlights the activities that have occurred during the reporting month. When a project/activity is completed it is reported,then deleted from this report. Strategic Planning/District$Savings Key Accounts- Staff attended a Key Accounts Workshop at SMUD September 15, 16. The Workshop went well with several key account personnel from various utilities sharing their insights and experiences in performing key account work for their utilities and communities. State Energy Funding Assistance/SBSX- TDPUD has received a total of $140,000 in SBSX grant monies from the California Energy Commission. Staff has used some of the monies to purchase and install compact fluorescent lighting and low-flow showerheads in the Senior's apartments. Staff will be completing the installation of WH pipe insulation this Winter. Conservation/DSM/Economic Development/Public Benefits Landscape Water Conservation Workshop Series 2005- There are no more workshops scheduled for 2005. Staff will be working with Trout Creek and the Villager next year. UNR Smart & Sustainable Living EXPO- Staff has been meeting for the last several months organizing a green building conference titled "Smart and Sustainable Living Exposition" to be held at UNR October 1, 2005. The Truckee Community was invited to this event through a TDPUD bill stuff er. The event went very well with about 300 in attendance. It looks like the success of this event will ensure that it becomes an annual event. There was a meeting Friday, November 4 to discuss the event and how to improve it for next year and then a celebration dinner afterwards. It is planned to be an annual event. Green Building Tour- This year's tour took place October 8 and included both Truckee as well as Lake Tahoe. This is a big event building upon last year's very successful event where the tour grew from about 50 people per year to over 75. The green building movement is growing which is creating more interest in the tour. Every year Staff works with Mayumi of Moonshine Ink to update the Green Building Resource Guide. The information is very helpful to our customers who want to learn more about GB measures. Planning for next year's tour will begin early next year. 0 Page 1 Green Building Development Assistance- Staff has been talking to several developers over their possible interest in incorporating green building measures into their subdivisions and other projects. So far I have talked to the developers of WinterCreek, Hilltop, DMB Highlands Group, Forest Service new Office building, Town of Truckee, Recreation & Parks District new Community Center, Park Service new Museum, new Sierra College campus planned for Truckee in 2008. The Sierra College Board approved making the campus a LEED Silver green building rated building. Staff attended the Forest Service building design meeting in August and the next meeting is planned for in mid-October. Staff has now been asked to participate in the design of the Mill Site/Railroad Yard neighborhood project. Staff attended the Sierra Business Council's Annual Conference on Sustainable & Economic Development October 21, 22 in Murphy's California. Staff may be asked to help out with next year's conference. Affordable Housing- I have offered to work with WHATT in Truckee to make their projects more affordable through energy and water management strategies. I have attended some affordable housing conferences and meetings including one with a green building emphasis. Staff has been in touch with most of the area developers regarding their plans to design and build affordable housing units. Staff met with the WHATT Director and Rose Cade with the Enterprise Foundation September 27 with $Ms for funding affordable green housing projects. The meeting went very well with interest in pursuing green funding for affordable housing for the region. Staff is in touch with Rachelle Pellisier regarding their proposed affordable housing plans. Public Benefits Program- TDPUD staff prepared a Public Benefit's report for TDPUD PB programs from 1998 through 2004 for NCPA in preparation for a report CMUA is presenting to the legislature. The purpose of the CMUA report is to show the legislature that CA's public utilities have been aggressively implementing their PB programs as compared to the picture the IOU's are painting about the publics. TDPUD funded a program to place weatherstripping on all of the 120 doors in the 60 Senior Center housing units. The work has been completed with the exception of a few doors where the occupants are not around. TDPUD Staff has processed about 450 Conservation Cash Rebate program applications to date. New Truckee Middle School- Staff has worked with Sue Mock and ACMS to send out a bill stuffer to help raise funds for the new Solar PV system. So far the ACMS has received about $10,000 in donations for this project in addition to the $10,000 grant funding. Schools Energy & Water Conservation Education Program- This program is designed to teach both energy and water conservation to dh grade children and includes energy and water conservation measures the kids can install in their parent's homes. Sue Mock is responsible for teaching this program for the School District. Livingwise kits have been ordered and received for this School year. Staff visited two of Sue Mock's classes October 6. Staff gave two more class presentations Nov. 9. Ground Source Heat Pump Program- Staff is currently looking into new ideas on how to educate and promote this technology to our customers. Staff has been contacted by several developers, architects and building engineers, etc. due to their interest in possibly pursuing GSHPs for projects they will be building. Staff has been working with Meline Engineering to evaluate the potential for a GSHP system for the building. They have conducted two studies which look promising and staff has asked them to prepare a proposal to do the engineering and write specifications for the project. This project is on hold until funding is available for it. Fuel Cells- Steve H. and Staff attended a fuel cell presentation given at TDPUD June 15. Delmar Networks offered a turn-key 5 Kw fuel cell for $15,000 to demonstrate fuel cell use in Truckee. Staff is currently looking at the value of such a project and whether we have now or in the future an appropriate site and application for this demonstration. Del Mar Networks has provided us with a Buy and Try option of using and demonstrating the technology at our facility for 3 months without • Page 2 obligation. Staff hopes to bring this fuel cell to TDPUD. This project is on hold until funding is available for it. Energy Surveys/High Bill Assistance- Staff completed 0 commercial and 3 residential energy-use analyses and/or energy survey(s) this month. Staff also responded on-site to 2 residential "high" bill complaint(s). There are currently several customers Staff is working with to help them understand and control their energy costs.Staff fields many questions by phone. Communications/Public Relations/Education Newsletter- Staff with the assistance of Gilwee PR completed the current newsletter which went out in Spring. The articles in the newsletter included: TDPUD water system, customer service programs, energy and water conservation, green building activities, the Truckee biomass project and a welcome to the two new Board members. Staff will be working on the next newsletter this Winter. Cable TV- Staff met with Cable TV marketing representative Peg Friesen to discuss TDPUD advertising on cable TV once again. Community Event Marketing- Local organizations have been in contact with TDPUD staff regarding helping them publicize their 2005 activities. Bill stuffers already distributed this year include: Earth Day, Truckee Home and Building Show, Truckee Day, July 4 Party, Carnival fundraiser, Nevada County Fair, Lake Tahoe Summer Music Festival, SBIC Green Building Seminar, Smart and Sustainable Living EXPO at UNR, Truckee River Day, Green Building Tour and the Solar PV fundraiser for the Middle School. Upcoming bill stuffers planned for 2005 include: Power Content Label, Bayou La Batre Community Fundraiser. Power Content Label- State law requires that all California public and private utilities supply their customers with a Power Content Label quarterly. The next PCL is being mailed out 04, 2005. Water Bottle- The new TDPUD water bottle is getting a lot of attention. There have been requests for bottles to take to meetings and other events Staff has 2,000 TDPUD water bottles along with 2,000 labels to be applied to any water bottles being filled with pure, clean Truckee water. The Alder Creek Middle School used TDPUD water bottles for their 8th grade graduation. If you know of any groups or organizations that could benefit from the use of TDPUD water bottles please let staff know. Truckee Home & Building Show- Staff worked once again to help the Home Show staff organize another great event. Staff gave a green building presentation May 28, 3-5 p.m. at the Show to about 25 in attendance. The theme again for the Show this year was green building. Staff met with Pam Neff, Home Show organizer, to discuss bringing in more green building type businesses into the event. The next Home Show will have a strong green building emphasis. Community/Statewide Involvement Town of Truckee Green Building Committee- Staff was appointed to the Town of Truckee Green Building Committee. Our last meeting was September 12. The Committee is currently working on several new projects including looking at voluntary guidelines and more educational activities and information for consumers and local building professionals. The Committee reported to Town Council activities to date and 2006 Workplan at the November 3 meeting. The next meeting took place December 7. Staff was working with the Forest Service on the Green Design of their new 11,000 square foot building planned to begin construction next Fall. Sierra Green Building Association- Staff participates in the Sierra Green Building Association in Truckee. The group educates and assists building professionals in their pursuit of building energy- efficient, economical and human and environmentally-sensitive buildings in the region. Many local Page 3 building professionals are actively pursuing green building design. SiGBA organized a series of seminars and other events to assist consumers and building professionals this year including: SBIC �.. Green Building Workshop August 23(went well with over 80 in attendance), Green Building Conference October 1 at UNR and the Truckee/Tahoe Green Building Home Tour. The Sigba Executive Committee meets monthly. The last meeting was November 15. Regional Sustainability Proposal- Staff has met with a group of people in No. Nevada, Lake Tahoe and Truckee to put together a proposal that will bring in funding from the National AIA group in Washington DC to conduct a sustainable economic development study for this region. Green Building & Economic Development- Staff gave a presentation to several City of Palo Alto Departments on Green Building September 19 while I was in the Bay area for another meeting. The City of Redding is interested in discussing this issue with Staff. This subject is gaining a lot of interest in the Truckee/Tahoe area as an economic development tool. California Municipal Utilities Association Energy Services, Marketing and Legislative Committees- Staff attended the CMUA meeting in Lompoc October 17, 18. Staff gave a presentation on green building at this meeting. NCPA Public Benefits Committee- Staff joined the newly formed NCPA public benefits committee to work with other NCPA member utilities to optimize benefits through collaboration. The group is put out an RFP to solicit bids from consultants to create a database of PB measures and their kW and kWh benefit. Bidders were interviewed in June and the contract is being awarded to KEMA Consulting. NCPA member utility energy services staff has had several meetings to move this project forward. The project will be complete by this Winter. This project will clarify to the CA legislature exactly how much money in being spent by each public utility on each specific area of the state-mandated public benefits program. CA Regional Water Authority- Staff began attending RWA Water Conservation Committee meetings in April, 2005. The committee is made up of water representatives of most of the water agencies in No. CA. The group works together to optimize collaborative program benefits. Staff gave a Green Building presentation to this group with a focus on water efficiency technologies and measures August 9. The next meeting is scheduled for December 13. Public Renewable Partnership(PRP)- Western Area Power Administration Staff formed a group called the Public Renewable Partnership made up of about 15-20 publically-owned electric utilities throughout the State. PRP applied and received $6,000,000 in grant funding from the California Energy Commission. The grant money includes funding an assessment of whether a biomass plant could be built in the Tahoe-Truckee area that could provide a reliable supply of economical electric generation for any interested utility. The grant money also includes setting up a small-scale biomass demonstration project. The 15 Kw Biomass Pilot project building is almost complete. Staff was asked and participated in the CA Energy Commission meeting October 28 regarding their $5.8M Pier projects including the Truckee Biomass project. The Commission!ng/Start-up and operator training took place the week of October 31. There is still more work to complete the project installation including being able to grid-tie it. There is a visit scheduled for December 15-16 to complete this work. A report on the feasibility of the larger scale(1-3 Megawatt) biomass project in Truckee is almost ready for Board review. BIG PAC- I met with a newly formed group of public agency councils(PAC) who are discussing ways to work together in their 20 plus local governments on green building issues and promotion. This group is currently working on Statewide voluntary Green Building Guidelines adapted from Alameda County Waste management Authority's GreenPoints GB guidelines. The Guidelines have been 0 Page 4 completed and are being disseminated to city and county entities throughout the state. Utility Energy Forum Planning Committee- The May 4-6 UEF Conference was very successful. Planning meetings are currently taking place to plan the May 3-5 2006 UEF. US Green Building Association- TDPUD is a member of the USGBC. Staff attends the USGBC Annual conference at least every other year. Staff interacts with the San Fran USGBC Chapter as San Francisco activities certainly affect Truckee as many of Truckee's second homeowners are from the Bay area as well as those shopping for real estate in Truckee. a Page 5