Loading...
HomeMy WebLinkAbout1968-05-24 Min - Board May 24, 1968 Truckee, California The members of the Board of Directors of the Truckee Public Utility District met at a special meeting at the office of the District on Main Street, Truckee, California at 7:30 P.M. Upon Roll call the following directors were noted present: Doyle, Rose, Firpo, Waters, Moore .�•,. District Employees: Longo., Hublar Guests: Ray & Tona Smith, Karl Kuttle, Nick Comola, Brien Walters and various other contractors. This meeting was convened for the purpose of awarding contracts for the Engineers Bid. MATERIAL BIDS Bid item #1 through #6 was awarded to Record Supply Co. Bid item #7 through #9 - no award Bid item # 10 was awarded to Crane Supply Co. Bid item #11 & #12 was awarded to Vincent Supply Co. Bid item #13 was eliminated Manager stated that Sacramento Utilities Supply Co. was not considered on this bidding as they were on an all or none basis. CONSTRUCTION BIDS Manager stated that in addition there will be $1,500.00 odd material items which the District will purchase. Manager suggested the bid follow the recommendations to award. Motion was made by Director Rose, seconded by Director Firpo that the Bids follow the Recommendations to Award. So carried. CONSTRUCTION Bids were as follows: ALPINE SMITH CONSTRUCTION COMPANY Total Bid $30,367.00 TERRY CONSTRUCTION COMPANY Total Bid $231795.00 A. TEICHERT AND SON, INC. Total Bid $41,280.00 ROBERT C. GEBHARDT Total Bid $241903.50 SIERRA PACIFIC CONSTRUCTION CO. Total Bid $20p7O9.00 HARKER & HARKER COMPANY Total Bid $24,001.25 Awards were given to Sierra Pacific Construction Company. Waters asked Brien if he did any investigating of this company. Brien stated that he has not but he knows the company to be a substantial company. He stated he suspects no problems with this company as long as they meet the bond at the meeting on Monday morning on June 3rd. He will provide proof of insurance. A motion was made by Director Rose, seconded by Director Firpo that the award be given to Sierra Pacific Construction Company. So carried. Brien stated that the low bidder has an 8 week delivery on construction pipe, the pipe is a little better than the type specified. In order to get the pipe in 3 weeks the District would have to accept weld pipe. �-- Brien stated the pipe specifications bid is 19� less in the 10" and 7� on the 8". Total weld pipe would be $3,000. Brien stated it will cost $2,000 more to get it done 5 weeks sooner. Brien also stated that he would like to see the ruck dug at this time at the Gateway area because it will be a 4" trench. L. B. Fosters bid on 10" $1.90 L. B. Foster's bid on 8" $1.56 Manager stated that L. B. Foster would be low bidder according to the figures. Manager stated that he would rather increase the material price. Brien stated that he came up with $1,278.00 cheaper than L. B. Foster through the Record Supply Company and at a 2 weeks delivery time. Manager stated that starting date of construction will be based on the delivery date of the pipe. Brien stated by the way of progress report that the base maps are completed and all that needs to be done is the water. Inventory is being done also. Brien stated he will make a report at the next regular meeting. Brien stated no more information on rates, but he can get a finished draft of water rules and regulations which will be brought up on the 4th. He stated the first meeting in July he will have the Rate Recomanendations. There being no further business to be brought before the Board it was moved by Director Rose, seconded by Director Firpo meeting be adjourned. } President of the Board of Directors Tom Paulus, ecor ing Secretary