Loading...
HomeMy WebLinkAbout1978-07-17 Min - Board REGULAR MEETING JULY 17, 1978 In President Maass ' absence, Vice President Kuttel called the Regular Meeting of the Board of Directors of the Truckee Donner Public Utility District to order in the District offices at 7:06 P.M. ROLL CALL: Directors Hatch, Huber, Kuttel , and Sutton were present. Director Maass was absent. r-- EMPLOYEES PRESENT: A. Milton Seymour and Susan Craig. CONSULTANTS PRESENT: District Counsel Grumer and District Engineer Cook were present. OTHERS PRESENT: Among those present were John Peterson, John Sharp, Fred Whit- ford, Harold Christian and Jane Reed. APPROVAL OF MINUTES Review of draft minutes - Director Huber moved that the minutes of March 26, 1977, July 29, 1977, August 22, 1977, November 7, 1977, November 14, 1977, November 17, 1977, November 21 , 1977, March 6, 1978, and June 14, 1978 be adopted with any cor- rections attached. The motion was seconded by Director Hatch. ROLL CALL: Hatch, aye; Huber, aye; Sutton, no; Kuttel , aye; Maass, absent. SO MOVED. Director Sut- ton stated that there were corrections which have been submitted to some of these minutes and which need to be part of the final copy of the minutes in order for the minutes to be accurate - she further stated she believed the Board defeated its purpose of the minute process by accepting inadequate or erroneous drafts. Review of Sutton's corrections to previously approved minutes of May 15, 1978 Director Sutton noted that the corrections being discussed were those submitted after the Board took action to approve these minutes when the Board knew corrections were in the process of being typed. She requested this agenda item believing that the Board wished to keep accurate records of the meeting. Director Huber moved that the corrections (submitted by Director Sut- ton) be attached to the approved minutes of May 15, 1978. The motion was seconded by Director Hatch. ROLL CALL: Hatch, aye; Huber, aye; Sutton, no; Kuttel , aye; Maass, absent. SO MOVED. Director Sutton requested the record show she believed the minutes should be as accurate as possible - she stated that attachment was not making that accuracy part of the body of the minutes. BILLS FOR BOARD APPROVAL AND STATEMENT OF GENERAL FUND Relating to Director Huber's inquiry about interest received from LAIF, Mr. Seymour advised it pertained only to the General Fund. She also asked, since the statement was dated July 14, 1978, why Project 77-1 funds received on the llth were not included. The Manager noted that this is a separate account. However, payment of bills for Project 77-1 are presently to be made out of the General Fund because checks for the special construction account had not yet been received. In answer to Director Sutton' s question, District Engineer Cook stated that, at the last meeting, partial payment estimates had been presented for Board review and would be listed on the agenda for approval at this meeting. Directors Sutton and Huber indicated they had not received a copy of the payment estimate, and agreed that the manner in which 77-1 construction payments were presented for approval was improper; payment should be made directly out of the special con- struction account. It was suggested that payment be made on counter checks drawn on the special account. Director Sutton asked that approval of the payment es- timates be delayed until later in the meeting when Directors have had an oppor- tunity to review copies of the estimates - then authorization can be given. Director Huber requested that the Board be provided with an account- ing of the amount in LAIF on each Statement. Discussion was held concerning the computer school expenses for Libby Wiser Bennett in the amount of $838.00 listed as an approved billing. Director Sutton requested that the record show she felt the Board needed a written policy 7/17/78 pg• 1 regarding people being sent to conferences or schools, etc. , because she didn' t believe there was any written policy. District Counsel volunteered to prepare a draft policy for Board review having to do with expenses for conferences and training sessions for employees and Directors. This will be presented at the August 7, 1978, meeting. Director Sutton requested that the Manager provide an accounting of his expenses for attendance at the R.E.A. conference in Washington D.C. held in April ; Mr. Seymour agreed to do so. In answer to Director Sutton's question, Mr. Seymour advised that the expense for travel to Oakland was for the purpose of picking up the new water truck. Query was made by Director Sutton relating to the increase in the petty cash fund from $100 to $200. She believed the $100 amount was set by motion and did not think it could be changed without direction from the Board. She requested that discussion and possible action relating to an increase in the petty cash fund be set on the agenda for the next meeting. None of the other Directors expressed any reservations relating to this increase in the petty cash fund. Director Hatch moved that the Board allow the petty cash fund to be increased from $100 to $200. The motion was seconded by Director Huber. ROLL CALL: Hatch, aye; Huber, aye; Sutton, aye; Kuttel , aye; Maass, absent. SO MOVED. Director Sutton moved that the Board authorize payment of the bills with the exception of the payment to Jetco Underground Construction as partial payment under the FmHA project in the amount of $38,284.20, and with the fur- ther exception of the C. W. Roen Construction bill , partial payment on the Farm- ers Home Loan project in the amount of $27,967.50, with the understanding that these will be taken up later in the meeting. The motion was seconded by Director Hatch. ROLL CALL: Hatch, aye; Huber, aye; Sutton, aye; Kuttel , aye; Maass, ab- sent. SO MOVED. REVIEW OF REVISED 1976-1977 INCOME STATEMENT FOR WATER DEPARTMENT This statement was mentioned, but no discussion ensued. A copy of the Income Statement has been attached. REVIEW OF FEBRUARY AND MARCH BALANCE SHEETS AND STATEMENTS OF REVENUES AND EXPENSES Director Kuttel inquired if the Balance Sheets and Statements of Revenues and Expenses could be received on a more current basis. Mr. Seymour noted that these reports should only be two months behind. It was the request of Director Huber that the Budget Report be kept current; she will not vote to authorize further expenditures until she knows where the District stands. Relating to the March Statement of Revenues and Expenses, Mr. Sey- mour will ascertain why the Water Department shows a credit for Interest Expense on Loans. COMMITTEE REPORTS Status report on 1977 minutes Director Sutton advised that approximately one month ago she had submitted a status report on the 1977 minutes. Water Committee Mr. Seymour noted that he had written to Director Sutton and Mr. Cook concerning a possible Water Committee meeting in August. The meeting was set for August 22, 1978. Management Leave of Absence Policy Director Sutton and District Counsel Grumer have not yet met con- cerning the Management Leave of Absence Policy. The matter was tabled. 7/17/78 pg. 2 �7 MANAGER'S REPORT General status of District An electric outage occurred on July 13th that affected Teichert and the properties along Deerfield Avenue. The outage was caused by the combination of a weak fuse and a warm day. There have also been several minor water outages cuased either by faulty telemetry or were planned in connection with the FmHA project. Mr. Seymour advised of a resident on Deerfield Line suffering from dysen- tery; the County Health Department suggested to her that perhaps the cause was the water supply. However, there were no other reported cases in the District. The Manager has ordered that samples be taken for testing thinking there might be infiltration from a faulty sewer line. One customer was caught stealing power; the matter is still under investi- gation. This item will be discussed in Executive Session. Report on investigation of non-paying water customers The staff has completed a list of customers who have, and are paying for, electric service, but are not paying for water. The District is investigating areas known to have water service available. Although the list is fairly ex- tensive, the vast majority of people will have a valid reason for not having paid for water service. The Manager requested that he be allowed to report further during Executive Session. Report re follow-up with Sierra Pacific respecting joint venture in hydro plants Mr. Seymour had nothing further to report regarding the joint venture be- tween the TDPUD and Sierra Pacific in hydro plants. He placed a call to Billy Martin's office (Bureau of Reclamation) but is still awaiting a .return call . The District is anticipating a meeting with the Board of Reclamation or the Western Power Marketing Administration of the Department of Energy. r-� Report respecting fire and liability insurance coverages and costs Marsh & McClennan were contacted; Mr. Seymour expected to have a repre- sentative visit the District in the very near future to discuss fire and liability insurance coverages and whether or not the District can better its present condition. Report on meeting with representatives of Underground Construction Co. The meeting with representatives of Underground Construction Co. has not yet been held. Report on contact with McDonough re State Lands Commission vs TDPUD Mr. Seymour indicated he had contacted Mr. McDonough; it was his request that the Board take action at this meeting with respect to Dart's proposal for settlement of the State Lands Commission case as indicated in his letter of May 23rd. Director Sutton suggested that the matter be discussed during Executive Session. Mr. Seymour noted he would be calling Mr. McDonough to- morrow to advise of any action taken by the Board. Manager' s recommendation of minute preparation and approval I The Manager noted that the final objective in minute preparation is an r" accurate, bound document which has received final approval of the majority of the Board and which contains all the necessary attachments. He listed ! the following steps necessary in achieving the final objective. a) From the magnetic tapes and notes taken during the meeting, the Executive Secretary prepares a draft version of the minutes of the meeting. b) Copies of the draft minutes are furnished to the Board members and Manager for review and any corrections required. j c) Upon return of the corrections, the Secretary will then prepare a final draft copy of the minutes. d) The final draft minutes should be listed on a Regular Board Meeting agenda for discussion and direction to either finalize or revise the minutes as corrected. e) Assuming the direction is to finalize the minutes, the secretary then would type a final version and make the necessary attachments. This final 7117178 pq. 3 form of the minutes would then be placed on the agenda of a Regular Board meeting for final approval and direction to be bound in the minute book. Director Sutton suggested that the Clerk of the District review the draft minutes and provide corrections prior to such draft being distributed to the Board. Based on this procedure, the Manager reported, a minimum of four weeks would be required to go from the meeting from which the minutes are being prepared until final approval and binding in the minute book. Director Sutton requested that the minutes be discussed further during Executive Session. Status report - 1977 minutes Review of the minutes of 1977 and 1978 through March 31st is required by the auditors prior to finalization of the 1977 audit. There are two sets of minutes to be completed - the minutes of February 6, 1978, and the minutes of November 30, 1977. Both sets will be completed prior to the workshop session with Matt Gomez on July 24th. Director Sutton noted that she felt the clean-up of the 1977 minutes should be a priority item. The Manager requested direction from the Board as to whether the 1978 minutes should be let slide in order to catch up on the 1977 minutes. Direc- tor Hatch requested the matter be discussed in Executive Session. HAROLD CHRISTIAN The Vice President, noting that Mr. Christian was present in the audience, asked if he would like to address the Board. Mr. Christian, a resident of Donner Lake, advised that he was representing a group of taxpayers who are going to do research as to whether it will cost more for electricity from the PUD, or if the District would be better off selling. Director Huber noted, that at the time the rates were revised by both the PUD and Sierra Pacific, she prepared a comparative study. For most users, the TDPUD rates were lower than those of Sierra Pacific Power Co. The group Mr. Christian is associated with has set an appointment with officials of Sierra Pacific on July 20th to see if they would be interested in buying the TDPUD. The Manager noted that it would be to the taxpayers benefit to have a rate comparison made prior to the meeting with Sierra Pacific. Director Huber noted that if the District was not able to come up with a reasonable rate structure for most people living in the area that would be comparable with Sierra Pacific, which the District was able to do, she would be will- ing to discuss selling the District. The Board voiced no objections to Mr. Christian's group doing such a study. For the record, Mr. Seymour stated that he is a customer of Sierra Pacific. His power in Kings Beach costs more per kilowatt hour than it would if he lived in Truckee. District Counsel Grumer suggested Mr. Christian become informed by meet- ing with the District's Board first in order to learn what is being done in —` the community prior to meeting with Sierra Pacific regarding sale of the District. The District will make a copy of Director Huber' s comparative study available to Mr. Christian. Upon being asked, Mr. Christian advised that, at this point, he was representing only two taxpayers of the District. Mr. Christian noted that his purpose in appearing before the Board was to inform them of his intended study, and also to speak about consolidation of the Truckee Sanitary District and the PUD. He stated that to consolidate the two Boards, all that was necessary was a resolution by the PUD Board to LAFCO who will then hold public meetings and elections. Mr. Grumer informed 7/17/78 pg• 4 69 Mr. Christian that the procedure was more complicated than he believed. Mr. Christian said he had talked to LAFCO and had the necessary pepers; he volun- teered to provide them to the District. Mr. Christian talked about what he believed to be Truckee Sanitary Dis- trict's financial condition and the supposed benefits of consolidation. It was his request that the TDPUD adopt a resolution to absorb the Sanitary Dis- trict. Director Huber noted that the District had invited the Truckee Sanitary District representatives on three occasions for the purpose of discussing a possible merger of services; they have refused to meet. District Counsel suggested the matter of a merger of services between the TSD and TDPUD be again placed on an agenda for public input and discussion. Vice President Kuttel noted that he was in favor of placing the matter of a merger of the TSD and TDPUD on the November ballot. Further discussion was held concerning the Truckee Sewer Ponds and users' charges. Director Hu-er moved that the matter of a possible consolidation of the TSD and TDPUD be placed on the August 7th agenda for public input and dis- cussion. Director Sutton seconded the motion. ROLL CALL: Hatch, aye; Huber, aye; Sutton, aye; Kuttel , aye; Maass, absent. SO MOVED. In response to Director Sutton's question, Mr. Christian stated he would be in attendance at the TSD Board meeting to make a similar request. Director Hatch noted that he felt there was sufficient time between this meeting and August 7th to communicate with the Truckee Sanitary District. Director Sutton stated she felt the Manager should prepare such correspondence. RESOLUTION AUTHORIZING THE DISTRICT TO CHARGE CUSTOMERS A FEE FOR COLLECTION EFFORTS WHEN NECESSARY BECAUSE OF DELINQUENCIES Mr. Grumer advised that although he had mailed copies of this draft reso- lution it had not yet been delivered to the Directors. Director Sutton moved that the Board table item #1 having to do with charging customers a fee for collection efforts when necessary because of delinquencies to the next regular meeting in order for the Board to attempt to review the resolution. The motion was seconded by Director Hatch. ROLL CALL: Hatch, aye; Huber, aye; Sutton, aye; Kuttel , aye; Maass, absent. SO MOVED. STANDBY CHARGES STATUS REPORT ON COLLECTIONS FOR 1977-1978 Mr. Seymour noted that he did not yet have a detailed report on collections for 1977-1978. The Vice President tabled this item until the next Regular Meet- ing. REPORT RESPECTING ADVICE OBTAINED FROM ASSEMBLYMAN CHAPPIE REGARDING COLLECTION OF STANDY CHARGES BY NEVADA COUNTY Mr. Grumer reported that no response has been received from Assemblyman Chappie at this time. This matter was tabled. RESOLUTION REAFFIRMING STANDBY CHARGES FOR FISCAL YEAR 1978-1979 RESOLUTION DESIGNATING THE COUNTY OF NEVADA AS COLLECTOR OF DELINQUENT STANDBY CHARGE COLLECTIONS The Vice President tabled these items. Director Hatch requested that, before these items are set for the next meeting, the paperwork be completed and ready to be acted upon. If that is not possible, he suggested setting the matters for the second meeting in August. Establishing the same charge as last year and, within the next year or ten months, reviewing the charge for possible revision was discussed. Also discussed were various methods of determining a fair standby charge for dif- ferent size parcels. 7/17/78 pg• 5 "l9 Concerning the resolution designating the County of Nevada as collector of delinquent standby charge collections, Director Sutton stated that the Manager had informed the Board that this resolution would have to be passed in July. It was determined that such resolution could be passed any time prior to the 15th of August. Director Sutton requested that the exhibit that is necessary to accompany the resolution, which specifies the parcel numbers, owners, and the amount of the charge that is delinquent, be available at the August 7th meeting. Director Sutton moved that all the items under No. 2, Standby Charges - a, b, c, and d be ready for the August 7th meeting. THE MOTION DIED FOR LACK OF A SECOND. District Counsel Grumer asked for clarification as to the charges to be incorporated in the resolution reaffirming Standby Charges for the fis- cal year 1978-1979. Director Sutton recommended that the Manager and Engineer collaborate and provide a written proposal respecting Standby Charges. By the second meeting in August, if there has not been any concrete proposal that is acceptable to the Board, Director Sutton stated she felt the old resolution form should be used. REVIEW OF PROPOSED MITIGATION AGREEMENT AND NEGATIVE DECLARATION ON SANDERS WELLS NO. 2 and 3 Regarding the proposed mitigation agreement and negative declaration on Sanders Production Wells No. II and III , it was the opinion of Directors Huber and Sutton that the proposed agreement went beyong what the Board had originally agreed upon. Various amendments, deletions and additions to the agreement were considered. As a result, it was Mr. Cook's understanding that the entirety of the agreement should be addressed only to the exploration; there should be another assessment, negative declaration, and notice of de- termination on whatever happens after the exploration. Discussion ensued between the Directors and Dr. Sharp of Hydro Search respecting water demands of Tahoe Donner and the proposed project. Director Huber suggested the mat- ter be referred back to the Committee on water matters in Tahoe Donner. It was the Board's contention that they had previously agreed to only two ex- ploration holes; production had not been addressed by the Board. Mr. Cook will rewrite the mitigation agreement and deliver the same to the Board the first part of next week for their review. Director Huber stated that she felt the District should allow the Nega- tive Declaration on one or the other of the sites - whichever had the best possibilities. DISCUSSION RESPECTING FARMERS HOME ADMINISTRATION'S REQUEST FOR WEATHERIZA- TION AGREEMENT Mr. Seymour advised that this item, tabled from the last meeting, relates to a visit and letter from the FmHA concerning loans for home weatherization for which the District would receive 1% of the amount of the loan plus $25. Director Sutton was in favor of the FmHA Weatherization Agreement, but had concerns as to whether there was sufficient time available to provide the necessary leadership. Director Sutton moved, although she would like to be able to approve the Weatherization Loan Program, that the matter be tabled. The motion was seconded by Director Huber. ROLL CALL: Hatch, aye; Huber, aye; Sutton, aye; Kuttel , aye; Maass, absent. SO MOVED. RESOLUTION AUTHORIZING ALL DIRECTORS TO SIGN CHECKS ON ALL DISTRICT ACCOUNTS Mr. Grumer advised that this matter had been carried over from the pre- vious meeting because of the feeling that there was a duplication between --. this resolution and a former resolution. After research, it was determined that there was no such former resolution. Director Huber moved that the Board adopt Resolution No. 7838 authoriz- ing all Directors to sign checks on all District accounts. The motion was seconded by Director Hatch. ROLL CALL: Hatch, aye; Huber, aye; Sutton, ab- stain; Kuttel , aye; Maass, absent. SO MOVED. Director Sutton' s abstention, she noted, was because in some ways she didn' t believe five signators were needed - with five signators, the responsibility for signing and keeping up with the District transactions was spread between too many people. REVIEW AND POSSIBLE ACTION RE APPLICATION TO APPROPRIATE UNAPPROPRIATED WATER FROM SOUTH SIDE SPRINGS Mr. Cook reviewed the application and supplement to the application to 7/17/78 pg. 6 appropriate unappropriated water from South Side Springs. It had been Mr. Cook's recommendation that the District file on the spring because the Dis- trict has no right to such spring. Mr. McDonough filed, in accordance with the Board's authorization, utilizing the paperwork and forms that were filled out and contained in the Water System Analysis. The State Water Resources Control Board, upon receiving the application, advised that different forms must be sued and also a negative declaration must be adopted by the District through the District CEQA process. Mr. Cook's purpose in presenting the application and supplement to the Board was to request their review and, if in order, adopt the same at the ,^.. August 7th meeting. Director Huber suggested the matter be tabled for possible action at the August 7th meeting. DISCUSSION REGARDING RICH CLAIM Mr. Seymour advised that Mr. Rich had complained about electrical prob- lems with his television and light bulbs. The District investigated and found the voltage was 2 2 volts high. The tap in the transformer was lowered. Mr. Grumer noted that the District's standard procedure is to reject a claim unless there is concession of liability and agreement with the amount of the claim. It was Mr. Rich's request that the District make an adjustment on his bill in the form of a $58 credit - $28 for light bulbs and $30 for fixing the television. Director Hatch made a motion that Mr. Rich's claim be denied and that District Counsel send an appropriate letter to that effect. Director Huber seconded the motion. ROLL CALL: Hatch, aye; Huber, aye; Sutton, abstain; Kuttel , aye; Maass, absent. SO MOVED. Director Sutton stated that she wished to abstain because she believed the District does have some responsi- bility when there is a faulty connection on a transformer for increased use r of electricity and power surges. RESOLUTION DECLARING CERTAIN DISTRICT VEHICLES SURPLUS AND ISSUING A CALL FOR BIDS Mr. Seymour advised that the District presently has three trucks not in use - Units No. 1 , 2, and 4. Radios and. other peripheral equipment have been removed from the vehicles. After discussion, Director Huber moved that the Manager and Counsel draw up a resolution declaring vehicles surplus and establishing the minimum bid, time for inspection, and issuing a call for bids. The motion was second- ed by Director Hatch. ROLL CALL: Hatch, aye; Huber, aye; Sutton, absent; Kuttel , aye; Maass, absent. SO MOVED. DISCUSSION AND POSSIBLE ACTION RESPECTING SPECIAL USE PERMIT FOR POWERLINE, ALDER HILL EXTENSION AND REPEATER STATION Director Hatch, being a Forest Service employee, left the Board Room during discussion of this item. He stated that he felt it may possibly be a matter of conflict. Mr. Seymour explained that the special use permits being discussed were renewal permits for the District to use Forest Service land for existing transmission lines. Director Huber noted that the Forest Service is no longer using the repeater station. Mr. Seymour advised that although the Forest Ser- vice is no longer using the repeater station, they do own it and may wish to lease out the station. He further noted that, in the past, these permits were signed by the Manager. Director Sutton moved that the Board authorize the Manager to execute the Special Use Permit for the Department of Agriculture, Forest Service for elec- tric transmission line as attached to the letter from Acting District Ranger Whited received July loth by the District. The motion was seconded by Direc- tor Huber. ROLL CALL: Hatch, absent; Huber, aye; Sutton, aye; Kuttel , aye; Maass, absent. SO MOVED. 7/17/78 pg. 7 1� RESOLUTION APPOINTING OFFICE MANAGER AND SETTING FORTH TERMS AND CONDITIONS OF THE POSITION District Counsel Grumer noted that he had not been aware of the need for preparation of this resolution. Director Sutton moved that this item be tabled until after Executive Session. NO SECOND TO THE MOTION OR VOTE WAS RECORDED. The Vice President, however, tabled the matter until after Executive Session. DISCUSSION RE TIMBERLINE SHOPPING CENTER EIR Director Huber advised that she had had the opportunity to review the Environmental Impact Report prepared on Timberline Shopping Center. One of the problems , she stated, that may or may not arise is the solution to the spring water would involve placing a ditch across the southern portion and pipe the water over to TDPUD property, or possibly tile underneath all pavements, which will cover 95% of the property, and pipe the water into the ditch or leach field. She was concerned with the effect of a heavy run-off year and the water going onto the South Side Spring area and well site. Furthermore, she expressed concern with the traffic due to the movie theatre be be constructed across Ponderosa Pal- isades Drive from the shoppint center. Comments must be received by the County prior to July 25th. Mr. Seymour had advised the designing engineer, he said, that the TDPUD did not want run-off water to come across the street to District property. Various problems related to the development of the property in question were discussed. District Engineer Cook advised that he had not yet had the opportunity to review the Timberline Shopping Center EIR, but through listening to the comments made, stated he would also be concerned with contaminated water on District property whereupon springs are located. Director Sutton moved that the Engineer, in conference with the Manager respond to the EIR on Timberline Village Shopping Center before the deadline. Director Huber seconded the motion. ROLL CALL: Hatch, aye; Huber, aye; Sutton, aye; Kuttel , aye; Maass, absent. SO MOVED. Director Sutton re- quested that copies of the response be provided to the Directors. District Engineer Cook asked that he be given a copy of the EIR for review. DECLARATION OF TEN SURPLUS PARCELS AS UNNECESSARY FOR DISTRICT USE Mr. Seymour advised that Dr. Tapia of the Truckee Donner Recreation and Park District had responded to the District's inquiry re these parcels. Dr. Tapia's letter stated that although the TDR&PD was interested in these par- eels, because of Proposition 13 they were unable to make a proposal . Director Huber requested that the Board exclude parcel "C" from being declared surplus along with the other nine parcels, and dealt with separately. The parcel is located in the Armstrong Tract; it is an open, sunny lot that would be ideal for the construction of a solar home. Mr. Seymour advised that, last winter, Mr. Bonnett, MAI , appraised these parcels and made recommendations as to possible use. He pointed out that parcel "C" was ideally situated for a solar heating application. He felt all of the ten parcels could be sold for residential use; several might be suitable for multiple family dwellings. Director Hatch expressed concern relating to the possibility that, per- haps in the future, the Recreation and Park District would be in a position to make use of some of these parcels. Mr. Seymour suggested going back to the Park District and asking them, if they had the funds, which parcels they would like. Recombining the parcels on South River Street was discussed. Director Hatch moved that the Manager write a letter to the Truckee Donner Recreation and Park District and approach them on the basis of a possible donation - ask which of the ten parcels, if they did have the money, they would be interested in, and what the proposed use of such parcel would be. A copy of the response is to be provided to the Board. Director Huber seconded the motion. ROLL CALL: Hatch, aye; Huber, aye; Sutton, aye; Kuttel , aye; Maass , absent. SO MOVED. 7/17/78 pg• 8 13 DISCUSSION RESPECTING NEED TO ESTABLISH POLICY ON PLANNING DEPARTMENT NOTICES Director Sutton noted that she felt the District had a need to es- tablish a policy from the standpoint of how inquiries are handled regarding development. She suggested a committee consisting of two Directors be formed to review Planning Department notices and make recommendations to the Board. After discussion, Director Hatch moved that a committee consisting of Directors Huber and Sutton be formed to make a draft policy on District re- sponses to Planning Department notices and development of a flow chart as to how '^ they will be handled, and that such policy be presented to the Board at the meet- ing of the 21st. The motion was seconded by Director Huber. ROLL CALL: Hatch, aye; Huber, aye; Sutton, aye; Kuttel , aye; Maass, absent. SO MOVED. It was clarified that the committee would have the authority to in- clude employees, consultants, and others as necessary to sit with them. A meeting was scheduled between Mr. Cook, Mr. Grumer, Mr. Seymour, and Directors Huber and Sutton on July 21st at 1 :00 P.M. MISCELLANEOUS INQUIRIES Rasmussen and Russell subdivison Determination regarding this subdivision was dependent upon Standby Charges established for 1978-1979. No decision having been made respecting Standby, this matter was discussed only briefly. Mr. Cook advised that Mr. Zir- jacks of Vail and Associates had been forwarded a copy of the District's rules and regulations applicable in this instance. Mr. Seymour reported that an in- quiry had been made as to when a will-serve letter would be issued. Financial consultants Mr. Seymour advised that there was a need for scheduling interviews for two financial consultants. He suggested a Special Meeting be set after a date had been established for such interviews. Juliot - Curtis lease The Manager reported that he wrote to Mssrs. Juliot and Curtis recent- ly asking them to supply the information required by District Counsel and District Engineer. No response has yet been received. Director Sutton suggested this mat- ter be placed on the agenda under the Manager's Report for the August 21st meeting. Mr. Seymour noted he would write a second letter; he also advised that, during a telephone conversation, he had made a verbal request for the necessary data - Mr. Curtis indicated he would be providing the information. Carpeting for the District office In answer to Director Huber's question, Mr. Seymour noted that Rex Reid had measured the District offices for carpeting. He further noted that the Budget Report would have to become current before such an expenditure was made. West River Street Assessment District Mr. Seymour advised that there was a need to transfer funds from the General Fund to the West River Street Assessment District Fund. There is a pre- sent requirement for $316; and possibly another $2,400 in a short period of time. This is due to delinquencies and must be handled prior to the end of the month, r-- according to the Bookkeeper. Director Huber moved that direction be given to transfer the necessary monies from the General Fund to cover the delinquencies on the West River Street Assessment District. The motion was seconded by Director Hatch. Director Sutton requested an amendment to the motion to the effect that a written report be pro- vided to the Board by the end of the week regarding the specific amount. All Directors were in agreement with such amendment. ROLL CALL: Hatch, aye; Huber, aye; Sutton, aye; Kuttel , aye; Maass, absent. SO MOVED. Director Sutton noted that this is the second time the Board has had to take action in this manner - she stated she felt this meant the District was not keeping on top of the problems of the West River Street Assessment District 7/17/78 pg. 9 k payments. She clarified by stating she did not mean the collecting of delin- quencies, but rather that the Dsitrict was not doing things properly for the records of the District - by not doing things in advance. Mr. Seymour stated he would take whatever action he felt was necessary to correct the situation; he further stated that it would not happen again. Paving - maintenance Director Sutton noted that, last year, the Dsgtrict obtained quotes on paving and maintenance, such as seal coating. She stated last fall that she felt that this year the District should seek bids on such services. Mr. Seymour advised that quotations on a square-foot basis had been obtained from at least three paving contractors. The lowest quote was $1 .68 per square foot, which was his choice. He did not anticipate that the total cost of the work would exceed $4,000 or $5,000 for the year. Director Sutton noted for the record that she personally believed that this should be done on a formal bid basis each year. Sierra Pacific Power Co. - change in billing procedures Director Sutton requested that a copy of correspondence from Sierra Pacific Power having to do with a change in their billing procedures become an attachment to these minutes. Sierra Pacific Power Co. - request to P.U.C. It was requested by Director Sutton that a copy of Sierra Pacific's request to the Public Utilities Commission for the District's possible service to the Fowle property - Advice Letter dated June 5th - be attached to these min- utes. Also, she requested the follow-up letter dated June 21st be attached. Notice from Public Utilities Commission Director Sutton inquired about the notice from the Public Utilities —� Commission having to do with an inspection that they plan to make in this area on August 3rd. Mr. Seymour advised that the P.U.C. would be inspecting the District's facilities to point out violations; their findings are not binding as far as this District is concerned. Also, Mr. Seymour noted that the P.U.C. will take into account that a good portion of the District plant is old. He felt their report would be interesting, informative and useful . Annexation in Placer County Mr. Cook advised that Placer County has provided a list of property owners but such list did not include the parcel numbers. Cook Associates was given the assignment of providing a map and addresses of those people on the list so that a petition could be sent to all the property owners. Beavers - 80-acre parcel Mr. Seymour noted that Jim Porter, Attorney at Law, has requested an item be placed on the next meeting agenda. Such item relates to the request of Butch Beavers that the District serve an 80-acre parcel in accordance with a will-serve letter issued by the District in 1959 and signed by Daven Morey. Mr. Grumer advised that there is no specific doctrine in existence which would determine whether the commitment is or is not obsolete. Mr. Seymour advised that request was made by Albert Day in 1976 for a commitment from the District on this same parcel . --� DISTRICT ENGINEER'S REPORT STATUS REPORTS Abandonment of Prosser Well - Mr. Cook reported that the Paynes have authorized the use of the District's constructed Prosser Well by the adjoining property owner (Lot 21 , Pannonia Estates) . The property owner has excavated the trench to the well site for the installation of power cables and water mains. It was the District Engineer's opinion that a summary of legal responsibilities and obligations would be in order from District Counsel before the Board can make 7/17/78 pg. 10 1.6r a reasonable determination as to what course of action to follow in the protec- tion of the Martis Valley aquifer. Discussion ensued; District Counsel suggest- ed the matter be discussed in Exeuctive Session. Project 77-1 - Jetco Underground - Mr. Cook advised that Jetco Underground is making excellent progress on the Deerfield Line replacement. Approximately 50% of the pipeline is installed; however, the services have not been transferred yet. There is a progress payment for Jetco, which will be discussed later in the meeting. For the most part, the use of the screen to make the specified backfill material is functioning adequately. "^ Project 77-1 - Roen Construction - The District Engineer noted that Roen Con- struction is making satisfactory progress. Lacking some clean-up work, Tonini Springs and McGlashen Springs have been completed and placed back on line. Work has been completed with the installation of the liner and the reinstallation of the pump in Southside No. 1 . Following some disinfection and miscellaneous work, Southside No. 1 will be back on line this week. Chemical wash on Southside No. II will be underway soon under the direction of Bill Nork's crews. Roen is in the process of relocating the Prosser Heights Booster; when that has been com- pleted, work on the Prosser Heights Well will get underway. Roen Construction's progress is satisfactory at the present time, and, Mr. Cook stated, he expects their work will continue to be satisfactory. Martis Valley Estates Unit #4 - Mr. Cook noted that, some time ago, the Walters Report indicated that a 12" main would be required from Highway 267 looping the system to the north with Olympic Heights. The initial improvement plans for Martis Valley Estates, Units 1 and 2 contain, at the District's request, provi- sions for the 12" diameter main in accordance with the Walters Plan. District management at that time did not see fit to make the 12" main a requirement of project approval . An 8" main was installed and is in place throughout the Mar- tis Valley Estates project. Application C, submitted in October of 1976, pro- vided for the double loop and tie in the area of Martis Valley Estates. The work that is proposed as part of Martis Valley Estates No. 4 will be in compliance with Application C of October 1976 and the District's long term system objectives in the eastern portion of the town. Mr. Cook indicated that he has confirmation from the project engineer that the construction will conform to the District's Rules, Regulations and Guidelines. He also indicated that the tie down East River Street is a development which will take place, that the line across the River will be the 12" size, that the line both south and north of the River will be 8" with the exception of the line east of the East River Street tie. Leonesio - Nevada County Planning Department application - Regarding the proposal to refurbish Coffee's Garage, Mr. Cook reported that water service is provided by a 3" main in the street; however, fire flow is provided from the mill line through the fire hydrants located at the southeast corner of the Post Office. Fire flow in the area as provided by the 10" diameter mill line is satisfactory to the Fire District. From the District system' s standpoint, it was Mr. Cook's opinion that the proposed refurbishing of Coffee's Garage would not represent a proposal that would be detrimental to the system or that a change in use would require modifications to the existing system. Director Sutton noted that she was concerned with the amount of prop- erty that is being refurbished or built downtown for other usages and the relation- ship to fire flow. She stated she felt there should be some sort of facility fee that would enable the District to collect funds for the purpose of replacing or improving the downtown system. District Engineer Cook agreed that the downtown system was in need of improvement. In the 1976 report, he stated, it was pointed out that the area in question was deficient. Discussion ensued respecting the deficiencies of the downtown system ,.... and possible means of improvement. Quintana Construction - Quintana has completed the East River Street main line extension in accordance with the improvement plans as provided by Cranmer Engin- eering and as recommended by the District. Barring some compaction test failures, the project has essentially been completed. The plans, specifications, District standards, and the quality of Mr. Quintana's work were discussed. Land surrounding Tonini Springs - Mr. Cook provided a map showing the relation- ship of the property and access requested by the Ralphs; such map has been at- tached to these minutes. Brief discussion ensued regarding the property. Fire flow problems - High Street duplex - Mr. Cook noted that a multi-family living unit has been proposed at the old Dolley Mansion. The fire flow in the area is about 500 gallons per minute. The Fire District would like it to be 2,000 GPM. Alternatives presented at the time of the Environmental Review 7/17/78 oa. 11 1l proposal going through the County were not looked upon with favor by the developer. Mr. Cook mentioned a fourth alternative - the transmission main connecting the Town Tank and the Trout Creek Well will pass directly by the proposed project and by the installation of a fire hydrant at the appropriate location on the Dart transmission main, fire flow to this area can be provided. Mr. Cook further noted that the District system must be modified to meet the fire flow requirements. If there is a benefit to the surrounding area by the improvement, the line extension policy provides for repayment. Dart - Phase I Transmission Main - The District Engineer reported that T & S Construction is making satisfactory progress on the isntallation of the 16" diameter ductile cast iron transmission main connecting the North Side Well and Town Tank with Phase II of the transmission main. To date, no response has been received from Mr. Wetherall , the Josephs ' attorney; construction is progressing within the 1968 provided ease- ment. Dart - Phase II Transmission Main - Pacific Telephone Company and Dart Industries conducted pre-bid conferences today for the Phase II transmission main installation, Mr. Cook noted. The physical construction of the main should start within two weeks. It is anticipated that the joint PT&T - Dart project will take approximately 60 to 70 days to complete once the contractor has moved on site. DISTRICT COUNSEL'S REPORT Report on West River Street Assessment District delinquencies District Counsel Grumer reported that the Directors had been provided with a copy of both the letters and resolution which had been sent. Report on discussion with Marron respecting approved list of bidders for District works Mr. Grumer noted that he is still awaiting a return call from Mr. Marron respecting an approved list of bidders for District works. PLANNING DEPARTMENT NOTICES The proposed development by Martis Associates, including a theatre and gas station, was discussed. By concurrence, the Board requested that Mr. Cook provide a letter to the Planning Department similar to that which was written respecting Timberline. Director Huber moved that the Board direct the Engineer to comment on the use permit 78-28 SP78-40 for the motion picture theatre and gas station as it might affect the water at South Side Springs, and with respect to drain- age. The motion was seconded by Director Hatch. ROLL CALL: Hatch, aye; Huber, aye; Sutton, aye; Kuttel , aye; Maass, absent. SO MOVED. Director Huber moved that SP78-45 EIS78-203, which was the six-unit apartment house, be commented upon by the Engineer with regards to how much water is available at that particular location. Mr. Seymour noted that a fire hydrant test done in that specific area had revealed a flow of 1 ,600 gallons per minute. The motion was seconded by Director Sutton. ROLL CALL: Hatch, aye; Huber, aye; Sutton, aye; Kuttel , aye; Maass, absent. SO MOVED. CORRESPONDENCE R.E.A. Request for Audit Report Director Sutton asked that a copy of the R.E.A. request for the District Audit Report, dated July 10, 1978, be attached to these minutes. Patsy Bell Claim The claim submitted by Patsy Bell was mentioned. Mr. Grumer advised 7/17/78 pg. 12 7� that it would be discussed during Executive Session. EXECUTIVE SESSION Vice President Kuttel adjourned the meeting to Executive Session at approximately 11 :22 P.M. for the purpose of discussing legal and personnel matters. RETURN TO PUBLIC SESSION The meeting was reconvened to Public Session at 12:55 A.M. FmHA Project 77-1 Director Huber moved that the bills for Jetco and Roen be approved as billed and paid out of the construction account for the 77-1 project. The motion was seconded by Director Hatch. ROLL CALL: Hatch, aye; Huber, aye; Sutton, aye; Kuttel , aye; Maass, absent. SO MOVED. Theft of Power Director Huber moved that the Manager be directed to write a letter, with Counsel 's concurrence, concerning the flagrant theft of power. Director Hatch seconded the motion. ROLL CALL: Hatch, aye; Huber, aye; Sutton, aye; Kuttel , aye; Maass, absent. SO MOVED. ADJOURNMENT Director Hatch moved that the meeting be adjourned. The motion was seconded by Director Sutton. Minute Committee Prior to the meeting being adjourned, it was noted that a Minute Committee r was to be selected. Vice President Kuttel appointed Director Su-ton, Mr. Sey- mour, Ms. Craig, and Mr. Grumer. Mr. Grumer requested that the Committee meet on Friday. ADJOURNMENT There being no further business before the Board, the meeting was adjourned by the Vice President at 1 :03 A.M. TRUCKEE DONNER PUBLIC UTILITY DISTRICT ames A. Maass, President Susan M. Craig, Execut' e Secretary TRUCKEE-DONNER PUBLIC UTILITY DISTRICT POST OFFICE BOX 309 TRUCKEE. CALIFORNIA 95734 TELEPHONE 587-3896 AUDIENCE ATTENDANCE FOR THE MMEE ING OF �. PLEASE PRINT YOUR NAME: 1 . n ��-�-c rs o rt 2. 3. C 4. 5. 6. 7. 8. 9. 10. 11 . 12. 13. 14. 15. 16. 17. 18. 19. 20. 21 . 22. 23. TRUCKEE DONNER PUBLIC UTILITY DISTRICT STATEMENT OF GENERAL FUND - July 14, 1978 Bank Balance - June 29, 1978 $ 75,553.93 Truckee Electric and Water Revenue 64,540.46 Donner Lake Electric Revenue 15,588.13 Electric Connection Fees 6,597.00 Water Connection Fees 1 ,540.00 ,.-. Standby Revenue 2,790.00 Interest Received from LAIF 13,290.70 Transfer from LAIF 97,500.00 Miscellaneous Billings Revenue 210.00 Miscellaneous Revenue 125. 10 $ 277,735.32 Approved Billings $171 ,606. 29 Bank of America - Second night drop deposit bag 15.00 Bank of America - Federal tax deposit 2,196.41 Bennett, Elizabeth - Computer school expenses , Boston 838.00 *Refunds - Credit balances on closed accounts: M. Lishman 1-026-01 $ 2.08 Jensen-Lindbloom Const. 1-153-01 2.41 T. Rowley 1-260-01 5.04 C. Shorkey 2-258-01 22.16 K. Brooks 2-761-01 2.28 C. Merica 2-821-01 5.10 N. Preston 4-093-02 3.80 A.W. Allen 6-037-03 1 .22 P. Melarkey 6-047-03 1 .32 D. Sabble 6-079-05 15.05 J. Carmichael 6-104-03 1 .95 D. LaLonde 6-116-02 5. 10 J. Rechlin 6-118-01 5. 10 V. Gonsalves 7-129-01 1 .88 J. Craig 7-170-01 1 .61 D. Mattson 7-266-02 1 .67 F. Redman 8-207-02 1 .56 R. Westberg 8-220-02 5.82 C. Johnston 8-520-01 1 .63 S. Costa 9-085-02 1 .43 Masonic Temple 10-007-01 12.38 S. Habild 12-037-03 1 .60 K. Schillig 13-078-03 11 .50 G. Curtis 13-089-01 32.50 P. Oliver 14-034-04 2.08 F. Baker 14-037-07 5. 10 Walker Boudwin Const. 14-056-01 33.53 L. Kelly 14-134-02 5.10 R. Jones 15-186-01 13.58 W.M. Chrisman 15-471-03 2.54 Paul Long Const. 65-214-01 23.54 Donner Lake Trading Post 65-353-01 114.17 W. Little 65-397-01 26.47 D. Solem 66-045-05 29.02 S. Whaley 67-016-03 12.55 W. Maraschin 70-120-01 11 .67 Refunds - Checks voided, issued twice: R. Racich 2-928-01 ( 37.62) S. Goodall 2-182-02 ( 42.88) Seymour, A. Milton - Reimbursement for travel expense to Oakland 26.72 T.D.P.U.D. - Interest on consumer deposits 4.05 T.D.P.U.D. - Refunds on Sierra Pacific Power rebate 1 ,200.93 U.S. Postmaster - Trust fund 20.00 U.S. Postmaster - Permit No. 1 200.00 (176,452.44) �y214 PAYROLL 6-30-78 OT DT Standby Gross Net Barry 629.20 485.31 Chapman 626.56 457.80 Connell 635.50 463.33 Craig 537.50 384.74 Grow 874.72 639.76 Jones 390.24 291 .93 Marsh 599.28 440.55 Lopez 6.92 819.16 575.81 Pomponi o 520.08 387.69 .., Reynolds 94.20 927.32 680.20 Rose 615.12 409.37 Rully 48.84 769.66 509.72 Seymour 1250.00 860.68 Silva 67.10 941 .82 688.14 Slattery 750.00 541 .79 Straub 92.30 904.54 625.94 Tamietti 73.26 794.08 615.07 Waltrip 566.72 418. 79 Bennett 520.08 404.25 196.12 186.50 13671 .58 9880.87 Temporary and Part-time Employees: Mannix 333.34 275.61 Painter 292.44 228.20 625.78 503.81 196.12 186.50 14297.36 10384.68 $(10,384.68) Bank Balance $ 90,898.20 Bills for Board Approval : Camellia Valley Supply Co.-l" and 5/8" x 3/4" $ 1456.44 Rockwell SR water meters IVC Printing & Graphics - meter reports and 180.79 material charge tickets Jetco Underground Construction - Partial 38284.20 payment estimate no. 1 , Deerfield line Kay Pomponio - 4 shutters and brackets for admin. 26.43 secretary's office C.W. Roen Construction - Partial payment 27967.50 estimate no. 1 , Deerfield line Stice & Wells Insurance Agency - Umbrella 7072.00` policy insurance U.S. Post Office -Increase trust fund from 11O.00' $20.00 to $30.00 Petty Cash - Increase fund from $100.00 to 1-00,0a (75,097.36) $200.00 Balance of account after payment of above $ 15,800.84 *There are a large number of refunds as none were done while processing the Sierra Pacific Power Company refund. �'' INCOME _.._.(T 1976 197/ WATER DEPARTMENT Truckee Truckee T.D. T.D. Total Total Water tlater Water Water Water Water 1976 1977 1976 1977 1976 1977 Revenue: Residential Sales 89,720.95 95,509.90 36,240.75 41 ,871.40 125,961.70 137,381.30 Commercial Sales 38,429.25 39,498.38 13,332.28 15,217.50 51,761.53 54,715.88 Interdepartmental Sales 164.00 168.00 -0- -0- 164.00 168.00 Miscellaneous Rents 409.00 355.00 -0- 885.00 409.00 1,240.00 *Standby Revenue 11 ,246.91 13.809.74 -0- 37,335.00 11 ,246.91 51,144.74 Other Revenues 1 ,980.00 2.000.00 90.00 540-00 2,070.00 2,540.00 Gross Revenue 141 ,950.11 151 ,341.02 49,663.03 95,848.90 191 ,613.14 247,189.92 Allowances 1.,495.74 117.50 263.00 450.27 1 ,758.74 567.77 Net Revenue 140,454.37 151 ,223.52 49,400.03 95,398.63 189,854.40 246,622.15 Operating Expenses: Supervision & Engineering 1 ,536.23 3,109.97 558.58 1 ,131.00 2,094.81 4,240.97 Distribution Expense 32,465.37 28,541.08 46,059.19 46,527.16 78,524.56 75,068.24 Meter Expense 797.89 2,176.10 54.51 214.47 852.40 2,390.57 Customer Installation Expense 62.06 -0- -0- -0- 62.06 -0- Misc. Distribution Expense 2,494.12 2,889.57 1 ,282.41 2,107.67 3,776.53 4,997.24 Right of Way Rents 447.76 247.00 130.80 28.00 578.56 275.00 Total Operating Expenses 37,803.43 36,963.72 48,085.49 50,008.30 85,888.92 86,972.02 Maintenance Expenses: Supervision & Engineering 1 ,528.85 3,001.29 555.90 1 ,091.46 2,084.75 4,092.75 Structures 731.77 957.94 290.26 1 ,837.48 1 ,022.03 2,795.42 Wells & Tanks 408.47 825.01 170.33 892.66 578.80 1 ,717.67 Distribution Equipment 10,507.99 14,644.93 3,463.73 4,828.08 13,971.72 19,473.01 Hydrants 727.95 24.88 -0- 140.68 727.95 165.56 Meters 763.22 115.41 46.88 136.31 810.10 25.1.72 Misc. `Distribution Expense 507.56 -0- 178.33 -0- 685.89 -0- Total Maintenance Expenses 15,175.81 19,569.46 4,705.43 8,926.67 19,881.24 28,496.13 Customer Account Expense: Meter Reading 297.24 238.18 858.85 249.47 1 ,156.09 487.65 Records & Collections 13,229.26 14,181.55 4,805.00 5,189.36 18,034.26 19,370.91 Uncollectible Accounts 1 ,152.68 2,824.18 469.62 282.92 1 ,622.30 3,107.10 Advertising 73.26 -0- 26.64 -0- 99.90 -0- Total Customer Account Expense 14,752.44 17,243.91 6,160.11 5,721.75 20,912.55 22,965.66 W �* Truckee Truckee T.D. T.D. Total Total Water Water Water Water Water Water 1976 1977 1976 1977 1976 1977 Administrative & General Expenses: Administrative & General Salaries 13,966.51 15,909.06 5,078.72 5,785.09 19,045.23 21 ,694.15 Office Supplies & Expenses 1 ,504.40 1 ,802.09 547.05 655.28 2,051.45 2,457.37 Outside Services 27,317.52 19,037.93 9,861.48 24,550.74 37,179.00 43,588.67 Insurance Expense 2,295.15 3,762.45 834.57 1 ,368.17 3,129.72 5,130.62 Injuries & Damages 688.87 1 ,012.78 250.50 368.29 939.37 1,381.07 Miscellaneous General Expenses 2,755.92 5,248.17 1 ,002.15 1 ,672.52 3,758.07 6,920.69 Maintenance of General Plant 142.27 176.42 51.73 65.00 194.00 241.42 Total Administrative & Gen. Exp. 48,670.64 46,948.90 17,626.20 34,465.09 66,296.84 81 ,413.99 Miscellaneous Operating Expenses: Depreciation Expense 30,595.38 31,024.86 ( 59.88) .47 30,535.50 31,025.33 Interest Expense 1 ,212.44 1 ,133.55 -0- -0- _ 1_,212.44 1,133.55 Total Misc. Operating Expenses 31 ,807.82 32,158.41 ( 59.88) .47 31 ,747.94 32,158.88 Total Operating Expenses 148,210.14 152,884.40 76,517.35 99,122.28 224,727.49 252,006.68 **Total Operating Margins ( 7,755.77) ( 1,660.88) (27,117.32) ( 3,723.65) ( 34,873.09) ( 5,384.53) *Standby Revenue - Has been adjusted to reflect the amount due to the-Tahoe Donner water system. **( ) Indicates loss in margins TRUCKEE DONNER PUBLIC UTILITY DISTRICT BALANCE SHEET February 28, 1978 ASSETS MARGINS AND LIABILITIES Facilities, Buildings, Land: Margins: Plant in Service Operating margins - Cumulative 1 ,285,108 Electric plant 2,177,228 since 1927 Water plant 874,856 Other equities - Profit on sale 608,856 General plant 355,462 of non-utility property Less accumulated depreciation (1 ,792,212) Year to date margins 47,738 Net Plant in Service 1 ,615,334 Total Margins 1 ,941,702 Construction work in progress 46,164 Acquired plant 3,938 Long-Term Debt: Net Utility Plant 1 ,665,436 REA bonds payable 367,574 Note payable to Sierra Pacific 66,573 Power Company Real Property - PUD House , sewer assess- 23,765 Sewer assessments payable 15,797 ments due Other - Computer loan, truck loan 24,920 Total Long-Term Debt 474,864 Restricted Funds 374,798 Current Liabilities: Current Assets: Accounts payable 381 ,727 Cash 609,978 Consumer deposits payable 30,428 Notes receivable - Van Wetter 1 ,500 Accrued liabilities - Payroll taxes, 185,690 Accounts receivable - Electric 300,284 interest on notes, deferred income, and water usage billings refund payable Accounts receivable - Standby 14,554 Total Current Liabilities 597,845 Accounts receivable, Other - Line 71,065 extensions, connection fees, misc. Materials and supplies 192,450 Customer Advances For Specific Improve- 243,681 Other current assets - Insurance 4,262 ments to System (Restricted Funds) prepmt. , interest receivable, future line extension costs Total Current Assets 1,194,093 TOTAL ASSETS 3,258,092 TOTAL MARGINS AND LIABILITIES 3,258,092 oa �s STATEMENT OF REVENUES AND EXPENSES For the month of and two months ended February, 1978 ELECTRIC DEPAMIENT WATER DEPARTMENT ELECTRIC AND WATER TOTAL Current Month Year to Date Current Month Year to Date Current Month Year to Date 1977 1978 1978 1977 1978 1978 1978 1977 1978 Net Revenues 185,446 203,701 455,991 32,641 16,741 32,462 220,442 456,023 488,453 Purchased Power 125,151 142,794 312,203 - - - 142,794 280,055 312,203 Operating Expenses 5,600 5,707 10,685 4,949 7,405 16,100 13,112 23,249 26,785 Maintenance Expenses 2,879 8,473 20,295 1 ,547 1 ,480 3,701 9,953 10,017 23,996 Customer Accounts Expenses - 4,924 10,182 18,133 1 ,564 2,312 4,356 12,494 13,802 22,489 Meter reading, billing, customer services General and Administrative Expenses 7,719 7,657 15,168 3,308 3,589 7,175 11 ,246 19,811 22,343 Outside Services 2,408 3,105 8,969 1 ,443 1,546 5,619 4,651 9,742 14,588 Depreciation 6,899 7,091 14,125 2,580 2,597 5,193 9,688 18,957 19,318 Interest Expense on Loans 1,096 999 11999 98 91 182 11090 2,768 2,181 Unallocated Overhead 2,619 ( 400) ( 3,465) - - - ( 400) 2,043 ( 3,465) Total Operating Expenses 159,295 185,608 398,112 15,489 19,020 42,326 204,628 380,444 440,438 Total Operating Margins 26,151 18,093 57,879 17,152 ( 2,279) ( 9,864) 15,814 75,579 48,015 Other Income and Expenses - - - - - - ( 138) 1 ,458 ( 277) Net Margins - - - - - - 15,676 77,037 47,738 () Indicates loss in margins TRUCKEE DONNER PUBLIC UTILITY DISTRICT BALANCE SHEET MARCH 31 , 1978 ASSETS MARGINS AND LIABILITIES Facilities, Buildings, Land: Margins: Plant in Service Operating margins - Cumulative Electric plant $ 2,177,692 since 1927 1,285,108 Water plant 874,856 Other equities - Profit on sale General plant 355,718 of non-utility property 608,856 Less accumulated depreciation (1,802,605) Year to date margins 87,030 in ins 1,980,994 Plant Service e 1 605 661 Total Mar Nete c 9 Construction work in progress 51,609 Acquired plant 3,874 Long-Term Debt: Net Utility Plant 1,661 ,144 REA bonds payable 367,573 Note payable to Sierra Pacific Power Company 66,573 Real Property - PUD House 23,732 Sewer assessments payable 17,334 Other - Computer loan, truck loan 24,921 Total Long-Term Debt 476,401 Restricted Funds 375,841 Current Liabilities: Current Assets: Accounts payable 345,000 Cash 597,461 Consumer deposits payable 30,705 Notes receivable - Van Wetter 1,500 Accrued liabilities - Payroll taxes, Accounts receivable - Electric interest on notes, deferred income, and water usage billings 299,769 refund payable 175,153 Accounts receivable - Standby 14,341 Total Current Liabilities 550,858 Accounts receivable, Other - Line extensions, connection fees, misc. 63,282 Materials and supplies 192,834 Customer Advances For Specific Improve- Other current assets - Insurance ments to System (Restricted Funds) 243,681 prepmt. , interest receivable, future 22,030 line extension costs Total Current Assets 1,191 ,217 TOTAL ASSETS 3,251 ,934 TOTAL MARGINS AND LIABILITIES 3,251,934 STATEMENT OF REVENUES AND EXPENSES For the month of and three months ended March 31 , 1978 ELECTRIC DEPARTMENT WATER DEPARTMENT ELECTRIC AND WATER TOTAL Current Month Year to Date Current Month Year to Date Current Month Year to Date 1977 1978 1978 1977 1978 1978 1978 1977 1978 Net Revenues 192,831 205,399 661 ,390 15,319 15,748 48,209 221 ,147 664,174 709,599 Purchased Power 137,707 128,708 440,910 - - - 128,708 417,762 440,910 Operating Expenses 4,238 7,067 17,752 5,647 7,308 23,408 14,375 33,133 41,160 Maintenance Expenses 4,350 5,099 25,394 2,210 2,295 5,996 7,394 16,577 31,390 Customer Accounts Expenses - Meter reading, billing, customer services 7,188 7,683 25,816 1 ,822 1,923 6,278 9,606 22,812 32,094 General and Administrative Expenses 22,727 7,781 22,948 5,656 3,678 10,853 11 ,459 29,296 33,801 Outside Services 6,640 58 9,027 2,846 3,197 8,817 3,255 38,126 17,844 Depreciation 6,899 7,095 21 ,220 2,581 2,598 7,791 9,693 28,438 29,011 Interest Expense on Loans 1 ,103 995 2,994 98 ( 3,532) ( 3,350) ( 2,537) 3,969 ( 350 Unallocated Overhead 1 ,625 ( 237) ( 3,701) - - - ( 237) 3,668 ( 3,701) Total Operating Expenses 192,477 164,249 562,360 20,860 17,467 59,793 181 ,716 593,781 622,153 Total Operating Margins 354 41 ,150 99,030 ( 5,541) ( 1 ,719) (11 ,584) 39,431 70,393 87,446 Other Income and Expenses - - - - - - ( 139) 672 ( 41Q Net Margins - - - - - - 39,292 71 ,065 87,030 () Indicates loss in margins 7" TRUCKEE-DONNER PUBLIC UTILITY DISTRICT POST OFFICE BOX 309 TRUCKEE, CALIFORNIA 95734 TELEPHONE 587 3896 July 17, 1978 MANAGER'S REPORT 1 . GENERAL STATUS OF DISTRICT a) An electric outage occurred on July 13th that affected Teichert and the properties along Deerfield Avenue. The outage was caused by the combination of a week fuse and a warm day. There have also been several minor water outages caused either by faulty telemetry or were planned in connection with the FmHA pro- ject. One customer was caught stealing power; the matter is still under investigation. 2. REPORT ON INVESTIGATION ON NON-PAYING WATER CUSTOMERS Attached is a complete list of customers who have and are paying for electric service, but are not paying for water. The District is in- vestigating areas known to have water service available. Although this list is fairly extensive, the vast majority of people will have a valid reason for not having water service. 3. REPORT RE FOLLOW-UP WITH SIERRA PACIFIC RESPECTING JOINT VENTURE IN HYDRO PLANTS At this time, there is nothing further to report regarding the joint venture between the TDPUD and Sierra Pacific in hydro plants. The District is still anticipating a meeting with the Board of Reclamation or the Western Power Marketing Administration of the Department of Energy. 4. REPORT RESPECTING FIRE AND LIABILITY INSURANCE COVERAGES AND COSTS Marsh & McClennan were contacted; I expect to have a representa- tive visit in the very near future to discuss fire and liability insurance coverages and whether or not the District can better its present condition. 5. REPORT ON MEETING WITH REPRESENTATIVES OF UNDERGROUND CONSTRUCTION CO. The meeting with representatives of Underground Construction Co. has not yet been held. 6. REPORT ON CONTACT WITH MC DONOUGH RE STATE LANDS COMMISSION VS TDPUD I have contacted Mr. McDonough; it is his request that the Board take action at this meeting with respect to Dart' s proposal for settlement of the State Lands Commission case as indicated in his letter of May 23rd. -1- 7. MANAGER'S RECOMMENDATION ON MINUTE PREPARATION AND APPROVAL Minute preparation continues to plague both the Board and the staff of the District. In reviewing the minute preparation process, I have approach- ed the problem by observing that the final objective in minute preparation is an accurate, bound document which has received final approval of the majority of the Board and which contains all the necessary attachments. With that objective in mind, I have listed necessary steps between a meeting of the Board and achieving the final objective. These steps are: a) From the magnetic tapes and notes taken during the meeting, the Executive Secretary prepares a draft version of the minutes of the meeting. b) Copies of the draft minutes are furnished to the Board members and Manager for review and any corrections required. c) Upon return of the corrections , the Secretary will then pre- pare a final draft copy of the minutes. d) These final draft minutes should be listed on a Regular Board Meeting agenda for discussion and direction to either finalize or revise the minutes as corrected. e) Assuming the direction is to finalize the minutes, the secre- tary then would type a final version and make the necessary attach- ments. This final form of the minutes would then be placed on the agenda of a Regular Board meeting for final approval and direction to be bound in the minute book. Based on this procedure, a minimum of four weeks (two Regular Board �^ meetings) would be required to go from the meeting from which the minutes are being prepared until final approval and binding in the minute book. Once on a current basis , the maximum time required to do this would be six weeks, or three Board meetings. Using this procedure, an approximate cost for doing a set of minutes for a Regular Board meeting would be $200 per meeting. 8. STATUS REPORT - 1977 MINUTES Review of the minutes of 1977 and 1978 through March 31st is required by the auditors prior to finalization of the 1977 audit. The minutes of February 6, 1978 are nearing completion, being three- quarters of the way finished at this time. The only remaining set of minutes necessary for the auditor' s review are those of the Special Meeting of Novem- ber 30, 1977. Both sets will be completed prior to the workshop session with Matt Gomez on July 24th. Due to the time involved in preparing last year' s minutes, the prep- aration of current minutes has fallen behind somewhat. Hopefully, the status of the 1978 minutes will be current as of September 1 , 1978, and will be able to remain so after that date. -2- t ' As soon as minutes are current, any spare time will be devoted to retyping and correcting the 1977 minutes. AMS/smc -3- EARLY THOUGHTS AND �DI PROPOSED DRAFT CA 78310 AGREL',1ENT BETWEEN TRUCKEE DONNER PUBLIC UTILITY DISTRICT AND DART INDUSTRIES RESPECTING THE CONSTRUCTION OF THE SANDERS PRODUCTION WELLS NO. II AND III This agreement entered into this day of , 1978, between the Truckee Donner Public Utility District, a- local public agency of the State of California, hereinafter referred to as the "District" , and Dart Industries Inc. , a Delaware Corporation, authorized to do business in California, hereinafter referred to as "Dart" . WITNESSETH: WHEREAS , Dart is the developer of Tahoe Donner, a recreational subdivision located within the boundaries of the District; and WHEREAS , Dart and the District are parties to two previous agree- ments respecting the rights and obligations in providing a water source and facilities to serve Tahoe Donner, the first such agree- ment dated March 19, 1970 and is most commonly referred to as the "1970 Agreement" ,and the second such agreement dated October 15, 1973, and is most commonly referred to as the "1973 Supplemental Agreement" ; and WHEREAS , in accordance with the two above agreements , and in accordance with the "Flow Diagram of Groundwater Exploration of the Truckee Region" , dated June 24, 1976 and approved by the . �p3 parties hereto, the so-called Trout Creek Well, also now known as the Sanders Site No.Ill,has been selected by Dart as the next site for exploration, installation an"development of a production well. Further, Dart has obtained tacit approval to amend the above noted"Flow Diagram 61 Groundwater Exploration of the Truckee Region to the extent that simultaneous exploration installation and development of a production well at Sanders Site No. II will be considered as being in compliance with the agreed upon exploration sequence; and WHEREAS , during the preparation of an Environmental Impact Assessment of the proposed Sanders Site Production Wells No. II and No. III together with the transmission facilities associated therewith and in accordance with the California Environmental Quality Act augmented by State and District guidelines , certain possible adverse environmental effects were noted, which with appropriate mitigation measures could prevent and/or offset any possible adverse effect; and WHEREAS , the parties wish to assure that the appropriate mitigation measures will be taken to prevent or off-set any possible adverse impacts of the proposed project, and on the basis of the proposed mitigations, the District will adopt and file a Negative Declaration and Notice of Determination on the Sanders Site Production Wells No. II and No. III, together with the transmission facilities 2 and related appurtenances . NOW THEREFORE, the parties agree as follows : ,.., 1. Consideration of the Negative Declaration and the filing of the Notice of Determination. Based on the Environmental Impact Assessment prepared by the District Engineer and upon this Agreement, the District shall consider the adoption of a Negative Declaration and a filing of a Notice of Determination to approve the project of the exploration, installation, development and operations of the Sanders Production Wells No. II and No. III together with the associated transmission mains and appurtenant facilities. 2. Resulting Obligations of the Parties . Upon the adoption and filing of the documents referred to in Paragraph 1, and the expiration of the period for challenge of the document referred to in Paragraph 1, the parties hereto shall have the obligations set forth below. 3. Construction of the Sanders Site Production Wells No. II and No. III 'by Dart and conveyance thereof to the District. Dart, at its own expense, shall explore, develop and test the production wells and all related appurtenant facilities at the Sanders Site No. II and the Sanders Site No. III, Providing the production wells meet the requirements of the 1973 Supplemental po? Agreement} the production wells and the related appurtenant facilities including transmission mains connecting the wells with the District water distribution system shall be conveyed to and accepted by the District for ownership, operation, maintenance and repair, in accordance with the provision of the 1970 and 1973 Agreements . 4. Noise Mitigation. During the construction of the Sanders Site Production Wells No. II and No. III, unavoidable noise will be created. To mitigate construction noise at the Sanders Site No. III, that has been determined to be objectionable to the homes located to the north and west of the site, Dart shall accomplish the following: A. Conduct the drilling operations only during the hours of 6: 00 A.M. to 10: 00 P.M. 100"- B. Construct acoustical attenuators adjacent to the construction area isolating objectionable construction noise from the adjoining homes . C . Take such other reasonable action as will minimize the construction noise during the drilling hours of operation. as may be directed by the District Engineer. 5 . Trout Creek Crossing. The transmission main connecting the proposed Sanders Site_ Production Wells No. II and No. III with the distribution system of the Truckee Donner Public Utility District will cross Trout Creek and one or more locations . The protection of the water quality and the prevention of siltation within Trout Creek is paramount and therefore Dart agrees to address the sensitivity of the creek crossing in the design and planning of the transmission main connecting the Sanders Site Production Wells No. II and No. III with the distribution system. Further, Dart agrees to notify the California Department of Fish and Game and the California Water Quality Control Board, Lahonton Region, two days prior to construction activity in the areas of the creek crossings . Dart further agrees to submit the improvement plans to the above noted State Agencies and to comply with the directives issued and the condition placed upon the improvement drawings. 6. Seismic Safety. The Environmental Impact Assessment addressed to geological hazards of the area in general and the known fault activity specifically. Dart hereby agrees to provide conceptual design consideration of the Sanders Site Production Wells No. II and No. III that will be resistent to seismic activity. The District Engineer shall review the proposed design and any and all requirements of the District Engineer as a result of said review shall be incorporated into the final construction drawings for the Sanders Site Production Well No. II and No. III, together with the related transmission facilities and appurtenance thereto. 7 . Assurance of Non-Interference Between Wells . The North Side Well currently provides a major portion of the community water supply and shall be protected on a first priority basis . The North Side Well has an agreed upon potential yield of 1500 GPM. The Sanders Production Well No. I has an agreed upon yield of 300 GPM. The adjusted yield of a well shall be assumed to be an inverse function of the distance from the top of the well head to the surface of the water in the static, quiescence state. The lowering of the groundwater pumping level that the District Engineer attributes to the influence of other production wells within the area shall be cause for adjustment in the rated yield of any such well so effected by the expression: �.5 Adj us ted Yield = Y - K(Q H) Where Y is the rated capacity of the well pumping alone and without interference. When K is a constant that varies from 0. 5 for wells completed in soil stratas of high transibility to 1. 5 for wells completed in soil stratas of low transibility. Where AH is the change in static water surface attributable to other production well interference as determined by the District Engineer. . The sum of the adjusted yield of the production wells provided by Dart shall be credited toward the basic requirement that Dart provide 4000 GPM total production capability to the Tahoe r� Donner Development. IN WITNESS WHEREOF, the parties hereto have executed this Agreement on the day and year first above written. TRUCKEE DONNER PUBLIC UTILITY DISTRICT (Seal) ATTEST: By President Secretary, Truckee Donner Public Utility District DART INDUSTRIES, INC. By 7 7�3�� O I - �k M. r�—�� Tox Areo Code 77- 003 1 / � w.31o' 14 ) w 1lJ r 4.1.n7� A 7;•�0. I _ . - 70 . 21 zrtyl' _ 1 3.67Ac. 40 i _�t•` lye�,F.[rr"!c !'' 0 1 n 31.810Ac. ��5�5g "�`< -0 N41. 6.711 Ac. l,•►• q��S E I J l 19 16 19.86 Ac- / /8.0$ i 400' M o 41 t / 4.O3,40 4/7 �V 1 7! ^ter 71! 36 ( , ° `Y 49.41fAc. At ,Ac. d �1 PO je de-5 jai N.8 2• T-1i /pUO/ { rr-4. , ca�'c«uis N , -6 2.3Ac. 60 = e "o t ( " P i ��Ln (58 \ o 31 t � 1 1 (53 Oc s.4 \AQ r I Nevada 14.312 Ar- Placer Co. Assessor's Map Bk. 19 - Pg.30 County of Nevada, Calif. 3-%-7(0 1969 15 14 , 3• i-13 .�-t 7/ 22 23 3-)-*1t 1-69 UTED STATES DEPARTMENT OF AGRICULTURE E RURAL ELECTRIFICATION ADMINISTRATION ' WASHINGTOt R15'Td'Yb: District Fngr. - -- l (j 1978 ./FC a� �1; D,: NNXA P.U.D. �;"ljistrict Counsel si� PVala- ori.na 444 — CPA Annual Audit Repo Si--as-of December- ;i�977 [] Sit. / ForemanVr To: Mr. James Maass, President Truckee-Donner Public �� --- r Utility District P. 0. Box 309 Truckee, Califorina 95734 We have not received your annual financial statements and auditor's report for the period ended December 31, 1977. Please advise when we will receive two copies of the report and supplemental letter and two copies of the adjusting and reclassifying journal entries. REA Bulletin 185-1: 465-1, Audit of REA Borrowers' Accounting Records requires borrowers to forward this material within four months of the "as of" date of the audit. A copy of this letter is being sent to your manager, Mr. Milton n Seymour. snags ' CHAR.LES W. FITCH Director Western Area - Electric E F I F ' f f t es Nys Syy d '�• :y.•.; {�; r,.�: i'=•"• Y:TryS;' #%.^ =� ti ;.� •':ii. y. .r•-y:•'-,7+�:k:7 ..• � tk � : y =.e .- .•„t. wmtv"14 � w. w. TRUCKEE-DONNER PUBLIC UTILITY DISTRICT POST OFFICE BOX 309 TRUCKEE, CALIFORNIA 95734 TELEPHONE 587-3896 July 13, 1978 Charles W. Fitch Director , Western Area - Electric RURAL ELECTRIFICATION ADMINISTRATION Washington, D. C . 20250 Re: 1977 Financial Statements and Auditor's Report Dear fir. Fitch: Because of some technical problems with the financial audit, the. District has not yet received copies of the 1977 Audit from the audi.tors. The District anticipates receipt of the Audit in final form early in August. Copies will be forwarded to you as soon as possible thereafter. A preliminary draft copy, which may or may not parallel the final copy, is enclosed for y ur 'information. Best/regards , / A. Milton Se mote Y General Manager AMS/smc 0 RESOLUTION NO. 78 38 r"+ OF TRUCKEE-DONNER PUBLIC UTILITY DISTRICT AUTHORIZING ALL DIRECTORS TO SIGN ON ALL DISTRICT ACCOUNTS BE IT RESOLVED, by the Board of Directors of the Truckee-Donner Public Utility District as follows: That all of the Directors are hereby authorized to sign checks on all of the District Accounts. BE IT FURTHER RESOLVED, that the Manager is hereby directed to obtain new signature cards to reflect the intention of this Resolution. PASSED AND ADOPTED by the Board of Directors of the Truckee- Donner Public Utility District, at a meeting held within said District on the 17th day of July 1978, by the following roll call vote; AYES: Hatch , Huber Kuttel ABSTAIN: Sutton NOES: None , ABSENT: Maass TRUCKEE-DONNER PUBLIC UTILITY DISTRICT By -•-, G` (OAMES A. MAASS, President ATT A. MIL ON SE M R, Clerk Thereof l