HomeMy WebLinkAbout1982-03-22 Min - Board SPECIAL MEETING
March 22, 1982
The special meeting of the Board of Directors of the Truckee Donner Public
Utility District was called to order by President Maass at 7:32 P.M. in the
TDPUD Board room.
ROLL CALL: Directors Huber, Monson and Maass were present at the start of the
meeting. Director Corbett arrived at 7:36 P.M. ; Director Kuttel, at 7:38 P.M.
4
t
i
EMPLOYEES PRESENT: James M. Ward and Susan Craig were present.
CONSULTANTS PRESENT: Substitute Counsel James Porter of Wood, Porter, Simon
and Graham arrived at 7:36 P.M. District Engineer Cook was present.
OTHERS PRESENT: There were no others present.
CONSIDERATION OF ELECTRIC AND WATER BUDGETS FOR 1982
A copy of the proposed budget has been attached to the minutes for reference.
The Board and Assistant Manager Ward reviewed the Water Utility expenses,
and Mr. Ward answered. questions regarding supervision and engineering costs and
pumping expenses and equipment costs. The anticipated maintenance projects for
the Water Department were reviewed - Mr. Cook advised that replacement of pumps
at Innsbruck and Donner Trails has been completed, and payment will be made from
Dart restricted funds. He also noted that replacement of the 6" steel line,
Route 89 North to Reynolds Way is eligible for inclusion in Project 79-1; ap-
proximately $8,900 remains on deposit at this time with the Farmers Home Ad-
ministration.
Capital improvements for the Water Department and, in particular, expenses
anticipated for telemetry, pump controls - rewiring, and reconstruction of the
Old Town water system were discussed. With respect to pipe thawing equipment,.
Directors Kuttel and Monson objected due to related dangers and liability prob-
lems.
Vehicle maintenance and capital improvements were briefly discussed.
Water Utility function - salaries, benefits, operating and maintenance expenses,
maintenance expenses, maintenance projects proposed to be performed by Cook As-
sociates and capital improvements - were reviewed. Mr. Ward noted he would re-
vise the maintenance projects and capital improvements in accordance with Board
discussion.
With regard to the estimated Water Department revenue, no provision was
made for a rate increase during 1982. Mr. Ward suggested a two-year budget
frame, and consideration of a rate increase in 1983. Passing on the energy
cost of operating the water system was suggested and discussed as well as
future metering of the system. Director Huber noted that hydrant maintenance
revenue should be adjusted to reflect revenue for a full year.
Electric Utility functions and expenses were briefly discussed, and Mr.
Ward noted he would provide a detailed report at the April 5th meeting with
respect to proposed overhead line expense and transformer maintenance. The
Board reviewed Electric Department capital improvements. With regard to the
Prosser Lakeview line upgrade, the Assistant Manager suggested a joint project
with Pacific Telephone and related discussion ensued.
Under estimated Electric Department revenue, the Board agreed that a
figure for interdepartmental sales should be shown as Electric revenue as
well as a Water Department expense. The accuracy of the standby revenue fig-
ure was questioned.
The Board was in agreement that the Directors' salaries should be adjust-
ed to the actual amount, as it does not anticipate increasing compensation
during 1983.
General administrative, customer relations, accounting functions, Ware-
house/Meter Department functions, Engineering functions, and related expenses
were briefly discussed.
3/22/82 pg. 1
Mr. Ward indicated a revised budget and summation sheets would be pre-
pared for Board review and consideration at the April 5th meeting.
District Engineer Cook recommended several items be added into the
budget - cathodic protection as provided for in the 1979 Dart Agreement,
more effective use of Wells A and B (using the $40 per lot funds) , telemetry
training, and development agreement expenses and income.
CLOSED SESSION
President Maass adjourned the meeting to closed session at 9:45 P.M.
RETURN TO PUBLIC SESSION
The meeting was returned to public session at 10:37 P.M. The Chairman
advised that legal and personnel matters were discussed during closed ses-
sion.
MANAGEMENT SALARY ADJUSTMENT
Director Kuttel moved, and Director Monson seconded, that the Board
adopt Resolution No. 8217 rescinding Resolution No. 8215 and establishing
the salary of the Executive Secretary at $24,323.85 annually. Payment in
the amount of $50 is to be made for each regular Board meeting attended.
ROLL CALL: all Directors, aye. SO MOVED.
ADJOURNMENT
The meeting was adjourned at 10:40 P.M.
TRUCKEE DONNER PUBLIC UTILITY DISTRICT
By
J es A. Maass, President
Susan M. Craig, Deputy DistXZct Clerk
3/22/82 pg. 2
TRUCKEE DONNER PUBLIC UTILITY DISTRICT
ALL DEPARTMENTS
Revenue Electric $ 51520 5500
Revenue Water 575,000
Total Revenue $ 69095,500
Expenditures Electric 4,8209144
Expenditures Water 470,305
Expenditures Other 192145,939
Total Expenditures (655059388)
Deficit ( 4095888)
Reductions (maximum) 390s6OO
Deficit Balance ( 19,288)
Expected Ending Balance:
` Water 759000
Electric 1509000 225,000
Margin for Year (all departments) $ 2059712
Does not include Restricted Funds
ia
i
f
TRUCKEE DONNER PUBLIC UTILITY DISTRICT
INCOME - REVENUE
Electric
Revenue from all sources $ 55520,500
Dater
Revenue from all sources 5759000
Total Revenue $ 690959500
Does not include General Funds or Restricted Funds
4J-
yn
PROPOSED EXPENDITURES
SUMMATION
1 . Board of Directors $ 183,000
2. PUD salaries (including overtime) 795,108
3. PUD benefits 158,567
4. PUD legal expense/auditors 109,800
5. PUD consultants 1359500
6. PUD office equipment maintenance 131,743
7. PUD office equipment leases 236
8. PUD communications 101,495
9. PUD utilities/maintenance 221,614
10. PUD postage 165090
11 . PUD office supplies 29,680
12. PUD insurance 235450
13. PUD association dues, etc. 59,102
14. PUD computer expense 129355
15. PUD employee education 89550
16. PUD Directors' expense 75263
17. PUD encroachment use permits 19000
18. PUD long-term debts 1479192
19. PUD advertising 63,400
20. PUD office - capitol improvements 805243
21 . PUD electrical utility 792 575 z3
22. PUD water utility 3 6 ,0#� �, � -
F
23. PUD vehicular maintenance
24. PUD engineering 452700
25. PUD power purchases 259359520
26. PUD fuel costs 7105000
27. PUD Pension benefits 399605 $ 6,50,�,388
o
REDUCTIONS:
Vehicle Maintenance 325000 $ 32,000
Water Division:
Capitol 691,900
Maintenance 885000 1573,900
Electrical Division:
Capitol -0-
Prosser 70,000 70,000
Engineering:
Office 15,000
Equipment 309700 45,700
Administrative:
Capitol 505000 50,000
Board/Directors:
Consultants 35,000 355000
(Maximum) TOTAL CUTS $ 390,600
j 'l T
r
TRUCKEE DONNER PUBLIC UTILITY DISTRICT
ESTIMATED ELECTRIC REVENUE
Prop. Est. Approved
1982 1982 1981
Interest income $ 29562
Truckee electric 169403
General fund electric 239900
Gain on sale of property 159728
Sales - residential } 195869004
}
Sales - commerical under 50 kw } 456589000 5129433
}
Sales - commercial over 50 kw ) 8735862
Public street lighting 10,000 10,549
Publ is authorities 505000 579,304
Fuel cost collection 7109000 7099270
Interdepartmental sales 121 ,806
Interest - penalties, standby 500 440
Interest - penalties, accts . rec. 3,000 31102
Fees for change out & connections 103,000 14,684
Miscellaneous rents 81,000 89272
Standby funds 68,000 349195
Other revenues 39000 29882
Total $ 555205500
r �iA ,. ;.
d jd \ 3
,; k �.` tit '•�r4 '�.. .� � `�1
_.:._�'af �sY.n tt ..:srfxe�N,' :Y' +s�i"..ne$ �•a'`
E��
t
TRUCKEE DONNER PUBLIC UTILITY DISTRICT
ESTIMATED WATER REVENUE
Prop. Est.
1982 1981
Gain on sale of property 11 ,357
Sales - residential $ 385,000 375,631
Sales - commercial 150,000 133,449
Interdepartmental sales -0- 205
Standby revenue -Q�- 270
Hydrant maintenance 20.000 199,809
Miscellaneous rents -0- 600
Standby funds 16,000 15,700
Other revenues 45000 31,865
Total $ 5755000
Ji
}
r�^
4
ti
TOTAL BUDGET BY FUNCTION
Board of Directors $ 3005725
General administration/customer relations 648,3367
Engineering 191 ,847
Electrical utility 1 51749624
Water utility 4701,305
Vehicle maintenance 74,000
Sub-total $ 2,8592868
Purchased power 259353520
Fuel cost 710,000
Sub-total 316455520
TOTAL
- •1 .Yr Yy k�'sHtt'1
J fl
IA
l�
TRUCKEE DONNER PUBLIC UTILITY DISTRICT
BOARD OF DIRECTORS
Item Proposed Approved 1981
1982 1982
Salaries - based upon maximum
permitted ($300) $ 189000 $ 121,000
Legal services:
Wood, Porter, Simon & Graham 429000 321,700
McDonough (rate suit) 409000 41236
Executive Secretary 24,323 239672
Benefits 49639
11,200
Auditors/Accounting Services 273800
Engineering Consultants:
Electrical - Peters 479500
(Boca-Prosser, maps)
Telemetry (Cook) 6,000
Civil Engineering (Cook) 70,000
R.W. Beck & Assoc. 125000
District Business:
Washington Matters }
Seminars - power } 7,263
Education - meetings }
TOTAL $ 300,725
f
' 4d
x
4 F
.f�
M
TRUCKEE DONNER PUBLIC UTILITY DISTRICT
GENERAL ADMINISTRATIVE EXPENSES
Item Proposed Approved
1982 1982
Salaries & Benefits $ 2315612
Office equipment maintenance 13,743
Office equipment lease 236
Communication 101,495
Utilities bldg. maintenance 225614
Postage 165090
Office supplies - expenses 29,680
Insurance 235450
Association dues/memberships 59102
Computer expenses 129355
Employee education/seminars 81550
Encroachment & use permits 15000
Long-term debt 1473,192
Advertising 6,400
Pension benefits 399605
Capitol imporvements 805243
TOTAL $ 6485367
1
TRUCKEE DONNER PUBLIC UTILITY DISTRICT
GENERAL ADMINISTRATION, CUSTOMER RELATIONS, ACCOUNTING FUNCTIONS
Proposed Approved
1982 1982
Personnel - Salaries & Benefits Salary Benefits Total
General Manager $ 19,542 $ 49296 $ 232838
Office Manager 265756 59295 329051
Bookkeeper 21 ,716 41,798 26 51..4
Senior Clerk 193,697 39221 22,918
Senior Clerk 195697 39148 229,845
Senior Clerk 199698 4,676 24,374
Senior Clerk 19,542 49,502 249044
Senior Clerk 175,757 4,198 213,955
General Clerk - new 89625 25365 10,990
Part time clerk - new 33,879 291 4,170
General Clerk - temp (No longer here) 15093 82 13,175
Overtime 155570 15168 16,738
Total $193,572 $ 38,040 $ 231 ,612
N' • � i f� '"4�f`
t:
t
/O
TRUCKEE DONNER PUBLIC UTILITY DISTRICT
WAREHOUSE/METER DEPARTMENT FUNCTION
Proposed
Proposed Proposed Salary &
Personnel - Salaries & Benefits Salaries Benefits Benefits
Foreman, Technical Serv. - Grow $ 289975 $ 65979 $ 355954
Warehouseman - Connell 24,482 55,929 309411
Meter Reader - Johnson 20,425 4,152 241,577
Meter Reader - Mertens zur Borg 209425 55170 25,595
Meter Reader - Pimental 185764 21,662 215426
Parttime Utility Workers 75086 554 7,640
Standby 41319 -0- 41319
Overtime 45574 475 53,049
Total $ 1293,050 $ 259921 $ 154,9971
Electric Department share 85/ $ 1093,692 $ 225033 $ 131 ,725
Water Department share 15/ 19,358 39888 23,246
A
Y
y �•� � �e F��r $t'
�r `;• to €',• '� : y�rt"."'.
�f
g
TRUCKEE DONNER PUBLIC UTILITY DISTRICT
ENGINEERING FUNCTION
Proposed
Proposed Proposed Salary &
Personnel - Salaries & Benefits Salaries Benefits Benefits
Engineer/Assistant Manager $ 32,500 $ 49817 379317
General Foreman 315871 5,080 369951
Engineering Tech 1 I I 21 ,667 3,910 25,577
Senior Clerk 19,698 49353 249,051
Draftsman 19,760 21491 22,251
TOTALS $ 1259496 $ 20,651 1469147
} L
jS E 40
�z
v
TRUCKEE DONNER PUBLIC UTILITY DISTRICT
ENGINEERING FUNCTION
Proposed
1982
Salaries & benefits $ 1469147
Office addition 155000
Office equipment 159350
Drafting aids/material 1 ,500
Survey equipment 55,000
Filing cabinets 500
Hanging files 850
Blue print machine 11,500
Survey materials 1 ,000
Aerial mapping 55000
TOTAL $ 1919847
y C 4
i 1
6
ai
n
TRUCKEE DONNER PUBLIC UTILITY DISTRICT
ELECTRIC UTILITY FUNCTION
Proposed
-- 1982 1981
Salaries & benefits $ 3823049
Operating expense 71 ,100 $ 179969
Maintenance expense 335050 173,630
Capitol improvement projects 6885425
Total $ 1 ,174,624
$1
:e
f
y
TRUCKEE DONNER PUBLIC UTILITY DISTRICT
ELECTRIC UTILITY FUNCTIONS
Proposed Proposed Proposed
Salaries Benefits Salaries &
Personnel - Salaries & Benefits Benefits
Line Foreman 13.93/hr $ 281,974 $ 7,366 $ 36,340
Lead Lineman 13.31/hr 275685 69797 349482
Lineman 12.67/hr 265354 6,578 325932
Lineman 12.67/hr 269,353 6,448 32,801
Lineman 12.67/hr 26,354 6,4ll 32,765
Lineman 12.67/hr 269353 5,608 31 ,961
Troubleman - New 5/82 13.31/hr 18,457 31446 21 ,903
Standby 145198 -0- 14,1198
Overtime l l ,842 1 9,101 12,943
2065570 43,755 2509325
Plus 85% warehouse/meter dept. 1095692 229033 131 ,725
Total $ 3165262 $ 653,788 $ 382,050
t. k
„ f
4:5-
TRUCKEE DONNER PUBLIC UTILITY DISTRICT
ELECTRIC UTILITY EXPENSES
Proposed Approved
Operations/Maintenance 1982 1982 1981
Station expense $ 100
Overhead line expense 615000 119467
(incl . 15,000 in poles)
Underground line expense 500 392
Street lighting 500 27
Meter expense 4,500 31314
Customer installations 500 -0-
Mi sc. distribution expense 2,500 1 ,1530
Right-of-way rents 19500 11240
Total $ 719100
Supervision & engineering 200 102
Station expense 200 -0-
Overhead lines 259000 139972
Underground lines 35500 2,165
Transformers 29,000 605
Street lighting 1 ,500 702
Meters 500 -0-
Mi sc. distribution plant 150 83
.a
Total $ 33,O5O
Y "4
r
�4
TRUCKEE DONNER PUBLIC UTILITY DISTRICT
ti
ELECTRIC CAPIT L IMPROVEMENTS
Proposed Approved
Marti s Valley Substation 1982 1982
Engineering $ 10,000
Construction 5203,125
Inspection 5,000
Administration 55000
Testing 1 ,500
Martis Valley Sub-Feeders
Engineering - Beck ?
Construction - TDPUD 51,000
Materials - Contract 705000
Inspection - TDPUD 500
Testing 500
Site Survey 800
Prosser Lakeview - Line Upgrade
Construction - TDPUD 5,000
Materials - TDPUD 655000
Total $ 6883425
Al
sic t
S
,.Wft.
TRUCKEE DONNER PUBLIC UTILITY DISTRICT
a
WATER UTILITY FUNCTION
Proposed
1982 1981
Salaries & benefits $ 1635705
Operating expenses 1429100 133,554
Maintenance expenses 69600
Maintenance projects (Cook) 88,000
Capitol improvements 693,900
TOTAL $ 4705305
1
.S
/V
t k
. V
TRUCKEE DONNER PUBLIC UTILITY DISTRICT
WATER UTILITY DEPARTMENT FUNCTION
Proposed Proposed Proposed
Salaries Benefits Salaries &
-- 1982 Benefits
Foreman $ 285454 $ 69650 $ 359104
Water Serviceman 17,781 41,964 22,745
Water Serviceman 23,712 6,645 30,357
Water Helper 18,064 49720 229,784
Two Helpers 5/1 to 10/31 151,787 2,9020 77,1807
Standby 65704 -0- 69704
Overtime 49,396 562 49958
Total 114,898 25,561 140,459
Plus 15/ Warehouse/Meter Dept. 195358 31888 235246
Total Water Department $ 134,256 $ 29,449 $ 1631,705
2q.
:7
TRUCKEE DONNER PUBLIC UTILITY DISTRICT
WATER UTILITY EXPENSES
Proposed Approved Actual
Operations/Maintenance 1982 1982 1981
Supervision & engineering $ 500 $ 18
Station expense 11,500 955
Pumping expense 120,000 1171,299
Other expense 19728
Pumping equipment 31,000 548
Storage facilities expense 500 20
Fire hydrant parts 11,500 73
Meter expense 5,000 39314
Customer installation expense
Misc. water distribution expense 93,500 8,354
Right-of-way rents 600 530
Total $ 1429100
Pumping expense 500 217
Transmission & distribution 500
Pumping equipment 1 ,500
Telemetry equipment 31000
Hydrants 500
Meters 600 494
Total $ 69600
(Materials & outside labor only) r '
T
7.�
a
TRUCKEE DONNER PUBLIC UTILITY DISTRICT
WATER UTILITY
MAINTENANCE PROJECTS
(Materials and outside labor)
Item Proposed Approved 1981
1982 1982
1. Leak repair @ SR89/I-80 $ 2,000
2. Trout Creek Road 51000
Old Town - replace 1"
Service line with 6" main
Provide fire protection
3. Route 89 - Old Town 5,000
The 2" H2O main that runs
east fr. 267 to Church St.
Replace w/6" line
4. 'Route 89N Southside Complex 51000
to Reynolds Way - the 6"
steel line is becoming a
maintenance problem
5. Fire hydrant - replacement of 23,500
30 - 40 hydrants - each
unit runs 750±
6. Insbruck - Donner Trails Pumps -
Cook est. repl. costs as
follows:
3rd pump - Insbruck 17,000
40 hp pump - Donner 231,000
7. Water storage tanks -
Donner Trails, Northside, 2,500
Tahoe Donner & Insbruck will
be steamcleaned & repainted
as necessary
8. Water service lines -
Begin reconst. of H 20 service 5,000
lines installed past years that
do not meet standards time per-
mitting
-40 4 }3
TOTAL $ 88,000 ri
.r •3
V
JMW/smc
3/12/82
a
TRUCKEE DONNER PUBLIC UTILITY DISTRICT
WATER DIVISION
CAPITAL IMPROVEMENTS
Item Proposed Approved 1981
1982 1982
1. Storage building for:
Inventory control $ 12,900
Flammable storage
Equipment storage
2. Telemetry testing
equipment 3,000
3. System expansion - Prosser
Heights - Southside Well 12,000
telemetry systems
4. Pump controls -rewiring 6,000
5. Reconstruction "Old Town"
Water Systems
Project report 51000
6. Pipe thaw equipment 2,000
7. Tapping machine 14,000
8. Fire hydrant test flow equip. 500
9. Water meter test benche:�/equip. 7,500
10. Radio base station 7,000
TOTAL $ 69,900 , ,may r' r,• ,� ::.
JMW/smc
3/12/82
r
TRUCKEE DONNER PUBLIC UTILITY DISTRICT
VEHICLE MAINTENANCE
(Gas - metering & outside labor)
Code Item Proposed Approved 1981
No. 1982 1982
951 Gas & oil $ 16,000 $ 14,423
952 Vehicles 21,000
O1 Chev. Luv 530
02 Dump truck 166
03 1 Ton Dodge 1,437
04 Chev. Pickup 146
05 322
06 Subaru 566
07 Line Truck 846
10 Line Truck 4,157
11 Chev. I T 4x4 40
15 Compressor 90
18 Line Truck 6,304
19 Chev. 3/4 T 4x4 11246
20 Toyota Pickup 280
21 Toyota Pickup 629
22 Toyota Pickup 1,296
23 Snow Mobile -0-
24 Back Hoe 941
Misc. Transportation expenses 5,000 41366
TOTAL $ 42,000 $ 37,844
"Al
f.
_ <'
�
{ >`zY
JMW/smc
3/12/82
'" >
k
TRUCKEE DONNER PUBLIC UTILITY DISTRICT
VEHICLE MAINTENANCE
CAPITAL
2 ea. sm. 4 x 4 Pickups - long bed $ 13,000
1 ea. equipment trailer/backhoe (used) 6,000
i
1 ea. compressor - 80 ctm 13,000
TOTAL $ 32,000
a
J.ti f1
e r Yl:
JMW/
smc L
3/12/82
4