Loading...
HomeMy WebLinkAbout8 District Pipeline replacement 2014 project Agenda Item # 8 Public CONSENT To: Board of Directors From: Neil Kaufman Date: November 19, 2014 Subject: Consideration of Final Completion of the District Pipeline Replacement— 2014 Project 1. WHY THIS MATTER IS BEFORE THE BOARD The District Pipeline Replacement - 2014 project is complete. A resolution accepting the project as complete requires Board approval. 2. HISTORY In April 2014, the Board awarded the construction contract for the District Pipeline Replacement - 2014 project to Civil Engineering Construction (CEC) of Loomis, California. The project involved replacement of about 4,350 feet of pipeline at various locations throughout Truckee. CEC began work in early May and completed the construction at the end of October. The original bid price was $1,112,419. At the time of award, the Board also established a 10 percent change order allowance for a total for a total authorization not to exceed $1,223,600. 3. NEW INFORMATION During the course of the project, 42 change order requests were submitted and reviewed by staff. Six of the 42 were rejected with the District and CEC agreeing on a total of $45,457.85 for the remaining issues. This amount did not exceed the $111,181 change order allowance established by the Board of Directors. The items generally fell under the following categories: • Additional work such as removal and re installation of trash enclosures and installation of traffic-rated boxes • Changes to connections between new and old piping to accommodate field conditions • Repair of water leaks • Unmarked or mis-marked utilities • Utility conflicts There was one item that resulted in a credit to the District. The contract is based on a unit price bid. Attachment 1 shows the differences between bid totals and the amounts actually constructed. This analysis results in a $68,805.30 credit to the District. The great majority of this credit is associated with overestimates in the bid quantities for service lateral piping and paving. The District also took possession of about 2,600 feet of pipe that was utilized to provide temporary water service in the Biltz tract during the construction period. This pipe is worth about $2,600 and will be needed when the remainder of the pipe in the Biltz tract is replaced in the next few years. In addition to the items noted above, the Water Department included some additional pipeline replacement work into the contract. In May 2014, a leak on the 6-inch main at 11127 Alder Drive was identified. Subsequently, a PUD crew excavated at the site of the leak in effort to perform repairs. The PUD crew determined that the leak was occurring at a point where the water main runs underneath a 24-inch CMP culvert. The water pipe at this location is about 11 feet deep. There are very few of the District's pipelines are this deep and the District does not own the shoring and trench safety equipment needed to safely perform work at this depth. The District crew was unable to stop the leak and proceeded to secure the site. After reviewing the situation, it was determined that the best course of action would be to install a new section of pipe over the top of the 24-inch culvert and to abandon the old pipe. It was estimated that this work would take most of the Water Department field crew about a week to complete. However, due to other competing priorities and projects, it was not possible to identify a time period where sufficient staff and time could be dedicated to the work. A price proposal was then requested from CEC to perform this additional pipeline replacement work. The District and CEC were able to agree upon unit prices to cover this work and it was included into the District Pipeline Replacement- 2014 contract. This work totaled $52,090.50. Therefore, the total contract price was $1,141,162.05, which does not exceed original authorization of$1,223,600. In mid-October, District staff performed a final walk through on the project. The work performed is considered complete and should be accepted by the District. A draft resolution accepting the project and directing that a Notice of Completion be filed is included as Attachment 2. 4. FISCAL IMPACT The original bid price was $1,112,419. Once adjustments are made for the items described above, the final contract price is $1,141,162.05. As discussed at the time of award, the anticipated funding sources for the project were: Funding Source Amount SAD 5 Restricted Fund $70,763.37 Town of Truckee $52,962.50 Water Department Capital Replacement $988,693.13 Fund Total $1,112,419 The current balance of the SAD 5 Restricted Fund is $70,881.93. After adjustments for change orders and the reconciliation of bid vs. actual quantities, the Town of Truckee's share of the work on State Route 89 was $52,769.89. Therefore, the final funding for the project is: Funding Source Amount SAD 5 Restricted Fund $70,881.93 Town of Truckee $52,769.89 Water Department Capital Replacement Fund $1,017,510.23 Total $1,141,162.05 5. RECOMMENDATION Adopt a Resolution 2014-23 accepting the District Pipeline Replacement - 2014 project as complete and authorize the filing of the Notice of Completion. Michael D. Holley General Manager/Water Utility Manager Analysis of Bid Quantities vs. Actual Quantities Constructed District Pipeline Replacement-2014 Contractor: Civil Engineering Construction Bid Amounts Actual Amounts Bid Item Description Quan' Units Unit Price Subtotal Quantity Units Unit Price Subtotal 1 Mobilization 1 LS $ 30,000.00 $ 30,000.00 1 LS $ 30,000.00 $ 30,000.00 1A 8"Water Main-Sierra Drive 882 FT $ 95.00 $ 83,790.00 880 FT $ 95.00 $ 83,600.00 1B 4"Water Main-Boca Street 493 FT $ 92.00 $ 45,356.00 484 FT $ 92.00 $ 44,528.00 1C 2" PE Water Service Lateral 750 FT $ 50.00 $ 37,500.00 318 FT $ 50.00 $ 15,900.00 1D Double Water Service (DS) 10 EA $ 2,900.00 $ 29,000.00 12 EA $ 2,900.00 $ 34,800.00 1 E Single Water Service (SS) 4 EA $ 2,500.00 $ 10,000.00 2 EA $ 2,500.00 $ 5,000.00 1 F Single Water Service(SS)Traffic Rated 1 EA $ 3,000.00 $ 3,000.00 0 EA $ 3,000.00 $1 G Double Water Service with One Lot Vacant(DSV) 1 EA $ 2,900.00 $ 2,900.00 0 EA $ 2,900.00 $1 H Double Water Service with Both Lots Vacant(D2V) 1 EA $ 1,500.00 $ 1,500.00 2 EA $ 1,500.00 $ 3,000.00 11 Connect New 2"Lateral to Existing Meter Box 1 EA $ 550.00 $ 550.00 1 EA $ 550.00 $ 550.00 1J Fire Hydrant Assembly 1 EA $ 6,500,00 $ 6,500.00 1 EA $ 6,500.00 $ 6,500.00 1 K Connection to Existing 6"Tee at Station 0+00-Sierra Drive 1 EA $ 3,700.00 $ 3,700.00 1 EA $ 3,700.00 $ 3,700.00 1L Tee/valve Assembly at Station 3+58-Sierra Drive 1 EA $ 1,900.00 $ 1,900.00 1 EA $ 1,900.00 $ 1,900.00 1 M Connection to Existing 6" Pipe at Station 8+81.05-Sierra Drive 1 EA $ 5,800.00 $ 5,800.00 1 EA $ 5,800.00 $ 5,800.00 1 N Connection to Existing 6"Pipe at Station 4+92.42-Boca Street 1 EA $ 4,500.00 $ 4,500-00 1 EA $ 4,500.00 $ 4,500.00 10 Implement Temporary Piping System 1 LS $ 34,000.00 $ 34,000.00 1 LS $ 34,000.00 $ ,000.00 1 P Dismantle Temporary Piping System 1 LS $ 91000.00 $ 9,000.00 1 LS $ 9,000.00 $ 34 10 Rock Excavation ,000.0020 HRS $ 850.00 $ 17,000.00 22 HRS $ 850.00 $ 18,700.00 1 R AC Pavement and Base(trench restoration) 11,400 SF $ 3.50 $ 39,900.00 8,006 SF $ 3.50 $ 28,021.00 1S Additional'le Thickness of AC Pavement(trench restoration) 11,400 SF $ 0.30 $ 3,420.00 8,006 SF $ 0.30 $ 2,401.80 1T All Other Work Required by the Contract Documents 1 LS $ 15,000.00 $ 15,000.00 1 LS $ 15,000.00 $ 15,000.00 2A 12"Water Main 506 FT $ 135.00 $ 68,310.00 515 FT $ 135.00 $28 Fire Hydrant Assembly at Station 4+65 69,525.001 EA $ 6,700.00 $ 6,700.00 1 EA $ 6,700.00 $ 6,700.00 2C Connection to Existing 12"DI Pipe at Station 0+00 1 LS $ 4,500.00 $ 4,500.00 1 LS $ 4,500.00 $ 4,500.00 2D Connection to Existing 12"AC Pipe at Station 5+05.13 1 LS $ 4,500.00 $ 4,500.00 1 LS $ 4,500.00 $ 0.00 2E Rock Excavation 4 HRS $ 900.00 $ 3,600.00 1 HRS $ 900.00 $ 4,50 50 2F AC Pavement and Base (trench restoration) 0.003,900 SF $ 4.00 $ 15,600.00 2,885 SF $ 4.00 $ 11,540.00 2G Additional'/2"Thickness of AC Pavement(trench restoration) 3,900 SF $ 0.35 $ 1,365.00 11,540 SF $ 0.35 $ 4,039.00 2H All Other Work Required by the Contract Documents 1 LS $ 1,350.00 $ 1,350.00 1 LS $ 1,350.00 $ 1,350.00 3A 12"Water Main 446 FT $ 105.00 $ 46,830.00 445 FT $ 105.00 $ 46,725.00 3B Connection to Existing 24' DI Pipe at Station 0+00 1 LS $ 5,000.00 $ 5,000.00 1 LS $ 5,000.00 $ 5,000.00 3C Tee/Valve Assembly and Connection to Existing Pipe at Station 0+27 1 LS $ 7,500.00 $ 7,500.00 1 LS $ 7,500.00 $ 7,500.00 3D Tee/Valve Assembly, Metering Vault and Connection to Existing Pipe at Station 3+63 1 LS $ 10,000.00 $ 10,000.00 1 LS $ 10,000.00 $ 10,000.00 3E Air Valve Assembly 1 EA $ 4,250.00 $ 4,250.00 1 EA $ 4,250.00 $ 4,250.00 3F Connection to Existing 12"Valve at Station 4+45.10 1 LS $ 3,500.00 $ 3,500.00 1 LS $ 3,500.00 $ ,500.00 3G Large Tree Removal 2 EA $ 1,500.00 $ 3,000.00 3 EA $ 1,500.00 $ 3 3 3H 2"Conduit at Station 0+93 ,500.0075 FT $ 50.00 $ 3,750.00 50 FT $ 50.00 $ 2,500.00 3I 2"Conduit Installation East of Comstock Place 1 LS $ 1,250.00 $ 1,250.00 1 LS $ 1,250.00 $ 1,250.00 3J Valve Abandonment on Comstock Drive 1 LS $ 2,400.00 $ 2,400.00 1 LS $ 2,400.00 $ 2,400.00 3K Rock Excavation 4 HRS $ 700.00 $ 2,800.00 5 HRS $ 700.00 3L A.C. Pavement and Base (trench restoration) $ 3,150.00 0400 SF $ 7.00 $ 2,800.00 446 SF $ 7.00 $ 3,122.00 3M All Other Work Required by the Contract Documents 1 LS $ 2,400.00 $ 2,400.00 1 LS $ 2,400.00 $ 2,400.00 4A 8"Water Main-Whitetail Lane 510 FT $ 98.00 $ 49,980.00 530 FT $ 98.00 $ 51,940.00 4B 8"Water Main-Rainbow Drive 4C 2"PE Water Service Lateral 636 FT $ 94.00 $ 59,784.00 699 FT $ 94.00 $ 65,706.00 r-r 300 FT $ 50.00 $ 15,000.00 270 FT $ 50.00 $ 13,500.00 4D Double Water Service (DS) 4 EA $ 2,400.00 $ 9,600.00 3 EA $ 2,400.00 $ 7,200.00 ' Bid Amounts Actual Amounts Bid Item Description Quan Units Unit Price Subtotal QuantityUnits Unit Price Subtotal 4E Single Water Service(SS) 1 EA $ 1,900.00 $ 1,900.00 2 EA $ 1,900.00 $ 3,800.00 4F Double Water Service with One Lot Vacant(DSV) 3 EA $ 2,700.00 $ 8,100.00 2 EA $ 2,700.00 $ 5,400.00 4G Double Water Service with Both Lots Vacant(D2V) 1 EA $ 1,300.00 $ 1,300.00 2 EA $ 11300.00 $ 2,600.00 4H Fire Hydrant Assembly 2 EA $ 6,800.00 $ 13,600.00 2 EA $ 6,800.00 $ 13,600.00 41 Air Valve Assembly 1 EA $ 4,250.00 $ 4,250.00 1 EA $ 4,250.00 $ 4,250,00 4J Connection to Existing 8" Piping at Station 0+00-Whitetail Lane 1 LS $ 3,100.00 $ 3,100.00 1 LS $ 3,100.00 $ 3,100.00 4K Cross/Valve Assembly at Station 4+66-Whitetail Lane 1 LS $ 8,500.00 $ 8,500.00 1 LS $ 8,500.00 $ 8,500.00 4L Connection to Existing 6" Piping at Station 5+09.69-Whitetail Lane 1 LS $ 5,400.00 $ 5,400.00 1 LS $ 5,400.00 $ 5,400.00 4M Connection to Existing 8"Piping at Station 0+00-Rainbow Drive 1 LS $ 3,100.00 $ 3,100.00 1 LS $ 3,100.00 $ 3,100.00 4N Connection to Existing 6" Piping at Station 6+35.70-Rainbow Drive 1 LS $ 3,100.00 $ 3,100.00 1 LS $ 3,100.00 $ 3,100.00 40 Rock Excavation 8 HRS $ 700.00 $ 5,600.00 0 HRS $ 700.00 $ 4P AC Pavement and Base(trench restoration) 9,400 SF $ 3.70 $ 34,780.00 4,861 SF $ 3.70 $ 17,985.70 4Q Additional%2"Thickness of AC Pavement(trench restoration) 9,400 SF $ 0.30 $ 2,820.00 4,861 SF $ 0.30 $ 1,458.30 4R A.C.Lane Restoration 8,300 SF $ 3.70 $ 30,710.00 8,050 SF $ 3.70 $ 29,785.00 4S All Other Work Required by the Contract Documents 1 LS $ 2,400.00 $ 2,400.00 1 LS $ 2,400.00 $ 2,400.00 SA 8"W ater Main 592 FT $ 93.00 $ 55,056.00 610 FT $ 93.00 $ 56,730.00 5B 2"PE Water Service Lateral 200 FT $ 54.00 $ 10,800.00 124 FT $ 54.00 $ 6,696.00 50 Double Water Service (DS) 2 EA $ 2,400.00 $ 4,800.00 3 EA $ 2,400.00 $ 7,200.00 5D Single Water Service (SS) 1 EA $ 1,900.00 $ 1,900.00 1 EA $ 1,900.00 $ 1,900.00 5E Double Water Service with One Lot Vacant(DSV) 1 EA $ 2,600.00 $ 2,600.00 1 EA $ 2,600.00 $ 2,600.00 5F Double Water Service with Both Lots Vacant(D2V) 1 EA $ 1,250.00 $ 1,250.00 1 Fes. $ 1,250.00 $ 1,250.00 5G Connect New 2"Lateral to Existing Meter Box 1 EA $ 950.00 $ 950.00 1 EA $ 950.00 $ 950.00 5H Fire Hydrant Assembly 1 EA $ 6,250.00 $ 6,250.00 1 EA $ 6,250.00 $ 6,250.00 51 Connection to Existing 6"Piping at Station 0+00 1 LS $ 3,B00.00 $ 3,800.00 1 LS $ 31800.00 $ 3,800.00 5J Connection to Existing 6" Piping at Station 5+91.09 1 LS $ 4,500.00 $ 4,500.00 1 LS $ 4,500.00 $ 4,500.00 5K Rock Excavation 8 HRS $ 750.00 $ 6,000.00 14 HAS $ 750.00 $ 10,500.00 5L AC Pavement and Base (trench restoration) 6,000 SF $ 3.60 $ 21,600.00 4,216 SF $ 3.60 $ 15,177.60 5M Additional Yz"Thickness of AC Pavement(trench restoration) 6,000 SF $ 0.30 $ 1,800.00 4,216 SF $ 0.30 $ 1,264.80 5N All Other Work Required by the Contract Documents 1 LS $ 2,400.00 $ 2,400.00 1 LS $ 2,400.00 $ 2,400.00 6A 3"HDPE Water Main 120 FT $ 41.00 $ 4,920.00 123 FT $ 41.00 $ 5,043.00 66 2" PE Water Service Lateral 135 FT $ 53.00 $ 7,155.00 122 Fr $ 53.00 $ 6,466.00 6C Double Water Service(DS) 1 EA $ 2,400.00 $ 2,400.00 1 EA $ 2,400.00 $ 2,400.00 6D Double Water Service with One Lot Vacant(DSV) 1 EA $ 2,600.00 $ 2,600.00 1 EA $ 2,600.00 $ 2,600.00 6E Tee/Valve Assembly at Station 0+00 1 LS $ 7,200.00 $ 7,200.00 1 LS $ 7,200.00 $ 7,200.00 6F Implement Temporary Piping System 1 LS $ 6,250.00 $ 6,250.00 1 LS $ 6250.00 $ 6,250.00 6G Dismantle Temporary Piping System 1 LS $ 2,750.00 $ 2,750.00 1 LS $ 2,750.00 $ 2,750.00 6H Rock Excavation 1 HRS $ 1,000.00 $ 1,000.00 1 HRS $ 1,000.00 $ 1,250.00 61 AC Pavement and Base (trench restoration) 700 SF $ 4.80 $ 3,360.00 619 SF $ 4.80 $ 2,971.20 6J Additional W'Thickness of AC Pavement(trench restoration) 700 SF $ 1.00 $ 700.00 619 SF $ 1.00 $ 619.00 6K All Other Work Required by the Contract Documents 1 LS $ 2,400.00 $ 2,400.00 1 LS $ 2,400.00 $ 2,400.00 7A 2" PE Water Service Lateral 300 FT $ 52.00 $ 15,600.00 221 FT $ 52.00 $ 11,492.00 713 Double Water Service (DS) 4 EA $ 2,600.00 $ 10,400.00 3 EA $ 2,600.00 $ 7,800.00 70 Single Water Service (SS) 4 EA $ 2,100.00 $ 8,400.00 6 EA $ 2,100.00 $ 12,600.00 D 7D Double Water Service with One Lot Vacant(DSV) 2 EA $ 2,900.00 $ 5,800.00 2 EA $ 2,900.00 $ 5,800.00 rhf- 7E Rock Excavation 2 HRS $ 750.00 $ 1,500.00 0 HRS $ 750.00 $ 7F AC Pavement and Base (trench restoration) 600 SF $ 4.00 $ 2,400.00 461 SF $ 4.00 $ 1,844.00 n 7G Additional%2"Thickness of AC Pavement (trench restoration) 600 SF $ 0.30 $ 180.00 461 SF $ 0.30 $ 138.30 =7, 7H All Other Work Required by the Contract Documents 1 LS $ 2,400.00 $ 2,400.00 1 LS $ 2,400.00 $ 2,400.00 E3 8A 8"Water Main 156 FT $ 89.00 $ 13,884.00 150 FT $ 89.00 $ 13,350.00 :3 8B 2"PE Water Service Lateral 40 FT $ 85.00 $ 3,400.00 35 FT $ 85.00 $ 2,975.00 r* 8C Two 1"PE Water Service Lateral in Common Trench 70 FT $ 41.00 $ 2,870.00 25 FT $ 41.00 $ 1, 5.00 8D 1"PE Water Service Lateral 140 FT $ 41.00 $ 5,740.00 235 FT $ 41.00 $ 9,63 635.00 Bid Amounts Actual Amounts Bid Item Description Quantity Units Unit Price Subtotal Quantity Units Unit Price Subtotal 8E Double Water Service (DS)Traffic Rated 1 EA $ 3,500.00 $ 3,500.00 2 EA $ 3,500.00 $ 7,000.00 BF Single Water Service (SS)Traffic Rated 2 EA $ 5,000.00 $ 10,000.00 1 EA $ 5,000.00 $ 5,000.00 813 Fire Hydrant Assembly 1 EA $ 6,350.00 $ 6,350.00 1 EA $ 6,350.00 $ 6,350.00 8H Connection to Existing 8"Piping at Station 1+55.13 1 LS $ 3,500.00 $ 3,500.00 1 LS $ 3,500.00 $ 3,500.00 81 Rock Excavation 2 HRS $ 900.00 $ 1,800.00 0 HRS $ 900.00 $ 8J AC Pavement and Base(trench restoration) 30 SF $ 10.00 $ 300.00 171 SF $ 10.00 $ 1,710.00 8K Additional%z"Thickness of AC Pavement(trench restoration) 30 SF $ 0.30 $ 9.00 0 SF $ 0.30 $ 8L All Other Work Required by the Contract Documents 1 LS Is 1,200.00 1 $ 1,200.00 1 LS $ 1,200.00 $ 1,200.00 Total Amount of Base Bid $ 1,013,186.00 $ 949,794.40 Total Amount of Alternate A $ 99,233.00 $ 93,819.30 Total Amount of Base Bid+Alternate A $ 1,112,419.00 $ 1,043,613.70 Credit to the District $ 68,805.30 D v rn Attachment 2 . C EE DONNER Public Utility r Resolution No. 2014 - 23 AUTHORIZING THE ACCEPTANCE OF THE DISTRICT PIPELINE REPLACEMENT — ?.t14 PROJECT AND DIRECTING FILING OF THE NOTIC&MV COMPLETION WHEREAS, the Board of Directors of the Truckee Donner Public_ icy Dis rmMftmade the determination to undertake the District Pipeline Replacement-2014 Project an = c WHEREAS, Civil Engineering Construction was selected 4gWistrict to perform the wand WHEREAS, Civil Engineering Construction has compldMII of the worKluded in the Pro�nd WHEREAS,The District's Water System Engineer, Neil Kau r�=ngm - ifies the completion of the project;and WHEREAS,the District's Water Utility Manawchael D. Holleyrecommended that the work be accepted by the District; NOW THEREFORE BE IT RESOLVED by the 1^%d of D of the D t as follows: 1. That the District here4- ' eDistric 2014 Project as complete. 2. That the Clerk o istrict be dir�ed to file w IM he County of Nevada the Notice of Completion,a copy of which is att9 hereto. 3. That 35 days folio the of pletion, the monies retained from the contractor paym-es=be-release ^ �ntractorif?r- =tiave been made to the District by material suppliers, lab �--Waaw rac PASS - D ADOPTE�he B f Directors at a meeting duly called and held within the District on the ninety--, - day of NovemIAW4 by f lowing roll call vote: AYES: NOES: -- ABSTAIN: ABSENT: TRUCKEE DONNERTMIMMTILITY DISTRICT By - Tony Laliotis, President of the Board ATTEST: Michael D. Holley, Clerk of the Board RECORDING REQUESTED BY: Truckee Donner Public Utility District WHEN RECORDED, RETURN TO: TRUCKEE DONNER PUBLIC UTILITY DISTRICT 11570 Donner Pass Road Truckee, CA 96161 THE UNDERSIGNED DECLARES DOCUMENTARY TRANSFER TAX- NONE NOTICE OF COMPLETM NOTICE IS HEREBY GIVEN: - 1. That the name and address of the public entity for wher e 1 ement project was done, as owner thereof, is the Truckee Donner Public Utility Distridt Donner Pass Road, Truckee, CA 96161. - 2. Nature of interest or estate of owner: bWeficia- Est of a pl tility easement for installation of water facilities. 3. That on November 19; ' here inaft�lesd invents were accepted as complete pursuant to Resolutio -1=4-23—�---R e Trucke der Public t ility District,the awarding authority. 4. That the subjectovements of tNotice areerally described and identified as follows: District Pipeline RepfaceiAM6 2094 Pry 5. That the nee and addre contra- i�project was: Civil Engineering Construction Inc., P.O —rmis, CJ �50. I certify under penalty of perjury under the laws of the State of California that the foregoing is true and correct. Dated: Nofter 19, 2014 TRUCKEE DONNER PUBLIC UTILITY DISTRICT By Michael D. Holley, General Manager MAIL TAX STATEMENTS TO: SAME AS ABOVE Legal References: CC-3093,CCP-2003 (oath), 2015.5 (unsworn statement)