Loading...
HomeMy WebLinkAbout8 Transfer Water Capital Funds Agenda Item # R To: Board of Directors From: Peter Holzmeister Date: June 16, 2003 Subject: Transfer of water capital funds Why this matter is before the Board — This matter recommends that funds be transferred from water restricted funds to the water general fund. Transfers from restricted funds to the general fund can be transferred only by the Board. History—We have been discussing the cash position of the water utility in relation to the need to fund various capital construction projects. At a recent meeting, Ed Taylor described a list of capital projects that the District needs to consider constructing. I then described the cash available for construction of water projects. I described the fact that when we issue contracts for construction of water capital projects without specifying the source of funds, it often happens that the Water General Fund becomes the de facto payer of the bills. When the Water General Fund is short of cash, the Electric General Fund has become the default payer of those bills. We ran into a cash problem last year because the Electric General Fund was drawn down paying the costs of water capital projects. The Electric General Fund needed its cash to deal with purchase power issues. I suggest we never allow water costs to rely on a cash balance in the Electric General Fund. We recently sold land and realized revenues of 3.7 million dollars. The Board established a Surplus Land Trust Fund to temporarily finance capital projects. The idea is to use the Trust Fund as a way to build a project and then arrange permanent financing. At the last Board meeting I described four water projects whose bills were paid by the Water General Fund and defaulted to the Electric General Fund. The attached table entitled District Cash position will remind you of that presentation. It shows the Water General Fund being overdrawn by $77,570. It also shows that expenses related to Donner Lake Water System Project, Glenshire Water System Project, and The Bridge Street Tank Project totaling in the aggregate $528,249 were charged to the Water General Fund. New Information — Transfers can be made from restricted funds to solve this problem as follows: Donner Lake Water System: $296,035 can be transferred from the Surplus Land Trust Fund to the Water General Fund. When the SRF funds are approved the Surplus Land Trust Fund can be reimbursed Glenshire Water System Project: $94,856 can be transferred from the Surplus land Trust Fund to the Water General Fund. When the surplus Glenshire land is sold and a final accounting of the Glenshire costs is complete, the Surplus Land Trust Fund can be reimbursed. Bridge Street Tank Project: $137,358 can be transferred from the Water Facilities Fees Fund to the Water General Fund. These three transactions will restore a balance of $450,679 to the Water General Fund, and will repay $77,570 to the Electric General Fund. It will also place the financing of water capital into proper funds. Recommendation — I recommend that the Board: 1. Transfer $296,035 from the Surplus Land Trust Fund to the Water General Fund to pay for costs associated with the Donner Lake Water System Project. When permanent financing for the Donner Lake Water System is secured the Surplus Land Trust Fund will be reimbursed 2. Transfer $94,856 from the Surplus land Trust Fund to the Water General Fund to pay for costs associated with the Glenshire Water System Project. When the surplus Glenshire land is sold and permanent financing for the Glenshire Water System is secured, the Surplus Land Trust Fund will be reimbursed. 3. Transfer $137,358 from the Water Facilities Fees Fund to the Water General Fund to pay the costs associated with the Bridge Street Tank Project. i t DISTRICT CASH POSITION Cash Electric General Fund 2,910,361 Water General Fund (77,570) Electric Restricted Funds Facilities Fees 460,726 Building Fund 267,407 Rate Reserve Fund 429,926 Subtotal 1 ,158,059 Water Restricted Funds Facilities Fees 209,124 Surplus Land Trust Fund 3,773,707 Subtotal 3,982,831 Water General Fund (77,570) Donner Lake Project 296,035 Land Trust Fund To SRF Glenshire Water System Project 94,856 Land Trust Fund To sale of Land Bridge Street Tank 137,358 Facilities Fees Subtotal 528,249