HomeMy WebLinkAbout9 Donner Lake Tract Pipeline Project REVISED Ag n a Item # DONNER Public Utility District J Memorandum To: Board of Directors From: Neil Kaufman Date: June 17, 2003 Subject: Bid Award for the Donner Lake Tract Pipelines Project 1. Why this matter is before the board: Board Authorization is required to award a contract for construction 2. History: The Board previously authorized staff to advertise for construction of the DONNER LAKE TRACT PIPELINES project. 3. New information: On June 12, Bids were received and opened for this project. Staff has totaled and reviewed all bids. Three Addenda were issued for this project covering the following issues: • Clarification of the date and time for the Pre-Bid Conference • Clarification of bidding and payment issues related to restoration of the existing unpaved roads, installation of two water services laterals in a joint trench and tree removal. • Issuance of new Bid Forms revising the estimated quantities • Issuance of the Lahontan RWQCB Construction Permit. A summary of the Bids is given below: Bidder Location Amount Herbert Suter Construction Reno, NV $413,075.00 White Rock Construction Gardnerville, NV $417,910.00 Hard Line Excavating— Truckee, CA $442,035.05 4. Recommendation: Award the DONNER LAKE TRACT PIPELINES project, as modified by three Addenda prior to the Bid Opening, to Herbert Suter Construction in the amount of $413,075. Agenda Item # TRUCKEE DONNER� it�llic Utility District IJ Memorandum To: Board of Directors From: Neil Kaufman Date: June 12, 2003 Subject: Bid Award for the Donner Lake Tract Pipelines Project 1. Why this matter is before the board: Board Authorization is required to award a contract for construction 2. History: The Board previously authorized staff to advertise for construction of the DONNER LAKE TRACT PIPELINES project. 3. New information: On June 12, Bids were received and opened for this project. Staff has totaled and reviewed all bids. Three Addenda were issued for this project covering the following issues: • Clarification of the date and time for the Pre-Bid Conference • Clarification of bidding and payment issues related to restoration of the existing unpaved roads, installation of two water services laterals in a joint trench and tree removal. • Issuance of new Bid Forms revising the estimated quantities • Issuance of the Lahontan RWQCB Construction Permit. District staff is currently evaluating the Bids and is in discussions with District Legal Counsel. A recommendation for award of a Contract will be presented to the Board at the meeting on Wednesday. 4. Recommendation: Award the DONNER LAKE TRACT PIPELINES project, as modified by three Addenda prior to the Bid Opening, to in the amount of $ Attachments: Bid Summary Table—To be presented at the Board Meeting