1. WHY THIS MATTER IS BEFORE THE BOARD
When District staff applied for Senate Bill SBSX funding, a high efficiency lighting retrofit
of the building was included. The California Energy Commission set aside grant money
to cover the entire cost of the project at no expense to the District rate payers.
2. HISTORY
On November 20, 2002 the Board awarded the contract of the Lighting Retrftit of the
District Headquarters building to PENCON (Pacific Environmental Control, Inc) in the
amount of $35,800.
3. NEW INFORMATION
The project is now finished and District Staff would like the Board to accept the project
as complete and to pay the remaining balance of the contract less the 10% retention and
to file a Notice of Completion with the county.
4. RECOMMENDATION
Consideration of a close out contract change order relating to the Lighting Retrofit of the
District Headquarters building in the amount of$3,390,07
1 recommend that the Board accept a resolution accepting the project as complete, pay
the balance less the 10% retention and to file a Notice of Completion.
II
Change Order
Contract Name: Truckee Donner PUD Lighting Retrofit Project
Contract Change Order No: 1 Ong. Contract Amt. $ 35,800 Days NA
Date: July 16, 2003 Prev. Apprd Changes$ 0 Days NA
Contractor: Pacific Environmental Control This Change $ 3,390.07 Days NA
Revised Contract Amt. $ 39,190.07 Days NA
This Change Order covers changes to the subject Contract as described herein: (1) Add two new exit signs,
$433.50; (2) Change to 8 foot lamps and ballast, $3454.40; (3) Remove one fixture instead of retrofit, $21.50; (4)
Change from dimming ballast to non-dimming ballast, ($957.63); (5) Board room troffers, $134,63; (6) Remove
from scope, ($462.00); (7) Add two lamps and one ballast beyond scope,$420.12; 35 k lamps (warm white lamps
for sun meter shop), $60.72; (8) Change from two lamp and one ballast to three lamps two ballast, $95.82; (9)Add
five fixtures not in scope, $232.50; (10) Delete one fixture from scope, ($43.50).
The amount of the Contract will be increased by the sum of$3,390.07 and the Contract Time shall not be
extended. The undersigned Contractor approves the foregoing Change Order as to the changes, if any, in the
contract price specified for each item including any and all supervision costs and other miscellaneous costs
relating to the change in work, and as to the extension of time allowed, if any, for completion of the entire work on
account of said Change Order. The Contractor agrees to furnish all labor and materials and perform all other
necessary work, inclusive of the directly or indirectly related to the approved time extension, required to complete
the Change order items. This document will become a supplement of the contract and all provisions will apply
hereto. It is understood that the Change Order shall be effective when approved by the District.
Pacific Environmental Control Truckee Donner Public Utility District
Dan Pendleton Peter L. Holzmeister
Application and Certificate For Payment Page I
To Owner: TRUCKEE DONNER PUBLIC UTILITY Project: TRUCKEE DONNER PUD RETRO Application No: 3 Date: O6/24/03
11570 DONNER PASS
�m P 0 BOX 309 TRUCKEE,CA 96I60 Period To: 06124103
Architect's
From PACIFIC ENVIRONMENTAL CONTROL Contractor)ob Project No:
d (Contractor): 3420 Fostoria Way,Suite G Number: 3096
San Ref Contact pate:
Reform,CA 94583
Via(Architect):
Phone: 925 866-9035 Contract For:
Contractor's Application For Payment
Change order summary Additions Deductions Original contract SUM 35,800.00
Change orders approved In
previous months by owner
Net change by change orders 3,390,07
Date Contract sum to date Number Approved 39,190.07
Change 001 06/24/03 3,390.07
orders Total completed and stored to date 39,190.07
approved
this month RetalnageF1' r•
6:6$!oof"campfeted work rr9 00
rrNais
Ld 3,390.07 !):gWo-of.sterreci.fitaterial
EL Net change by change O'00
orders 3,390.07
The undersigned Contractor testifies that to the best of the Contractors knowledge, e Total earned less retains
information,and belief the work covered by this Application for Payment has been completed g -�y}�l•9Q:e ^^-S"f1" , .;P/£),tr
in accordance with the Contract Documents,that all amounts have been paid by the Contractor y
for work for which presdous Certificates for Payment were issued and payments received from Less previous certificates of payment 32,220.00
the Owner ue
,and that current payment shown herein is now d .
Current sales tax
Can r. e�
av: n ....-s fl:O06%"t�fta�cable-arnount $'QO
Date:
N
LD State of: County of:
ca
WSubsonbed and swom to before me this_day of CtiFrent.sales t (}.(s(3
(year)_ Notary public: Current payment due �_
CV
m ray commission cnpires Balance to finish, Including retainage
® Architect's Certificate For Payment
In accordance with the Contract Documents, based on on-site observations and the data Archiied;
m comprising the above application the Architect certifies to the Owner that to the best of the
Architect's knowledge,information and belief the Work has progressed as indicated,the quality By,00 of the Work is in accordance with the Contract Documents, and the Contractor is entitled to die.
m payment of the Amount Certified.
m This Certification is not megoilable. TheAtnount Certified is payable only to the Conlrapor named herein. Issuance,
NAmount Certified: S contr . art aceepGame of payment are without prejudice to any rights of the Owner or Contractor under this
rn
m
Application and Certificate For Payment -- page 2
To Owner: TRUCKEE DONNER PUBLIC UTILITY Application No: 3 Date: 06/24/03 Period To: 06/24/03
From(Contractor): PACIFIC ENVIRONMENTAL CONTROL Contractor's Job Number: 3096
Project: TRUCKEE DONNER PUD RETRO Architect's Project No:
Work Completed
Materials Completed and
Item Scheduled Previous Presently Stored Stored to Date Balance to Finish
Number Description Value Application This Period % Retention Memo
001 LIGHTING RETROFIT 35,800.00 32,220.00 3,580.00 0.00 35,800.00 100.00 0.00 0.00
002 CHANGE ORDER ONE 3,390.07 0.00 3,390.07 0.00 3,390.07 100.00 0.00 0.00
Application Total 39,190.07 32,220.00 6,970.07 0.00 39,190.07 100.00 0.00 0.00
I I III� DONNER
�u
'2pu
ll
District
r
Resolution No . 2003- XXX
AUTHORIZING THE ACCEPTANCE OF THE LIGHTING RETROFIT OF THE DISTRICT
HEADQUARTERS BUILDING AND DIRECTING FILING OF THE NOTICE OF COMPLETION
WHEREAS, the Board of Directors of the Truckee Donner Public Utility District made the
determination to undertake the lighting retrofit of the District Headquarters building; and
WHEREAS, PENCON (Pacific Environmental control, Inc.),was selected bythe District to perform
the work; and
WHEREAS, the District's Planning Director, Scott Terrell, has recommended that the work be
accepted by the District;
NOW THEREFORE BE IT RESOLVED by the Board of Directors of the District as follows:
1. That the District hereby accepts the Installation of Lighting Retrofit of the District Headquarters
building Project as complete.
2. That the Clerk of the District be directed to file with the County of Nevada the Notice of
Completion, a copy of which is attached hereto.
3. That 35 days following the filing of the Notice of Completion, the 10% retained from the
contractor payments be released to the contractor if no claims have been made to the District
by material suppliers or laborers.
PASSED AND ADOPTED by the Board of Directors at a meeting duly called and held within the
District on the 16" day of July 2003 by the following roll call vote:
AYES:
NOES:N
ABSTAIN:
ABSENT:
TRUCKEE DONNER PUBLIC UTILITY DISTRICT
By
J. Ron Hemig, President of the Board
ATTEST:
Peter L. Holzmeister, Clerk of the Board
bhc
RECORDING REQUESTED BY:
Truckee Donner Public Utility District
WHEN RECORDED, RETURN TO:
TRUCKEE DONNER PUBLIC UTILITY DISTRICT
Post Office Box 309
Truckee, CA 96160
NOTICE OF COMPLETION
NOTICE IS HEREBY GIVEN:
1. That the name and address of the public entity for whom the improvement project was done, as owner
thereof, is the Truckee Donner Public Utility District, Post Office Box 309, Truckee, CA 96160.
2. That on July 16, 2003 the hereinafter described improvements were accepted as complete pursuant to a
resolution of the Truckee Donner Public Utility District, the awarding authority.
3. That the subject improvements of the Notice are generally described and identified as follows:
Lighting Retrofit of the District Headquarters building Project located at 11570 Donner Pass Road,
Truckee, Ca.
4. That the name and address of the contractor for such project was: PENCON (Pacific Environmental
Control, 3420 Fostoria Way, Suite G, San Ramon, Ca. 94583
I certify under penalty of perjury under the laws of the State of
California that the foregoing is true and correct.
Dated: TRUCKEE DONNER PUBLIC UTILITY DISTRICT
By
Peter L. Holzmeister, General Manager