Loading...
HomeMy WebLinkAbout8 Red Mountain Tank Agenda Item # G jj O 1,11. t; Public Utility � U tr Memorandum To: Board of Directors From: Neil Kaufman Date: August 11, 2004 Subject: Construction of the Red Mountain Tank site piping 1. Why this matter is before the board: Approval from the Board of Directors is necessary to advertise for Bids and to issue a Change Order to a construction contract. 2. History: There is an existing water storage tank located off Mt. Judah Drive on the south side of Donner Lake. This tank is in poor condition and has been out of service since 2001. The tank was removed from service in 2001 due to fears over a catastrophic collapse of the tank. There is also a small pump at this site that serves two houses. As part of the rehabilitation of the Donner Lake Water System, construction of a replacement tank and a larger hydropneumatic pump station is planned for this site. The new tank would be slightly larger than the existing tank. The pump station would be sized to serve about 30 houses for both domestic and fire flow demands. The Board previously awarded a contract to Sauers Engineering for design of the improvements at this site. 3. New information: Sauers Engineering has completed the design. There are three major components to the project. 1) Demolition and removal of the existing steel tank and construction of a new 300,000 gallon tank. 2) Construction of a new hydropneumatic pump station. 3) Construction of a new inlet/outlet pipeline for the tank and a new discharge pipeline for the pump station. There are also minor components to the project such as paving, drainage and electrical conduits. Unfortunately, completion of the design work took longer than anticipated. Page 1 Considering that it is now the middle of August, there is not adequate time left to Bid the entire project as a single contract and have it completed this year. Therefore, I requested a price proposal from Hansen Brothers (HBE) for construction of the pipeline work along with associated minor improvements such as conduits and drainage. Hansen Brothers is currently under Contract to the District for work in the Donner Lath the work area and is working on a developer project at the west end of Donner Lake. I am happy that HBE has performed and HBE has been very conscientious about issues such as clean-up and erosion control measures that are highly important at the Red Mountain site. The price proposal for the Red Mountain Take site is $171,778.00 4. Recommendation: Authorize Change Order No. 1 to the Installation of Services for the North Shore of Donner Lake—Contract B in the amount of $171,778.00. Attachments: Change Order No. 1 to the Installation of Services for the North Shore of Donner Lake— • Contract B project • Map showing Red Mountain site location Page 2 Change Order INSTALLATION OF SERVICES FOR THE NORTH SHORE OF Contract Name: DONNER LAKE - CONTRACT B Contract Change Order No: 1 Orig. Contract Amt. $ 998,458.00 Days NA August 12 2004 Prev. Apprd Changes$ 0.00 Days NA Date: This Change$ 8.00 Days NA Contractor: Hansen Brothers Enterprises 171,77 Revised Contract Amt. $ 1,170,236.00 Days NA This Change Order covers changes to the subject Contract as described herein. The Contractor shall construct, furnish Items eqa I sum price cment and e agreed upop dorm all lthe work as necessary tor and District. rrequired to complete the Change Order increase in (Decrease) Contract Time Contract in Contract Extension Description of Changes Amount $ Amount $ a F1) Red Installation of Site Piping and Other Improvements at $171,778.00 NA Mountain ta nk site. $171,778.00 Totals Net change in contract amount (increase or decrease) $171,778.00 The amount of the Contract will be increased by the sum of $171,778.00 and the Contract Time shall in the not be Concontractextended. The specified fordeachtitemrinelud'ngsany and the gaiinsuperviso ncostsrder aand others to the hmisgcellaneo es, it s costs relating to the change in work, and as to the extension of time allowed, if any, for completion of the entire work on account of said Change Order. The Contractor agrees to furnish all time extension,bor and materials a eqnd uireed to completerform necessarynecessary work, inclusive of the directly or indirectly related to the approved the Change order items. This document will become a supplement of the contract and all provisions will apply hereto. It is understood that the Change Order shall be effective when approved by the District. /Contractor Date: Accepted: (Signature) /District Date: Approved: (Signature) if, 1 I h a 1't x Uri I c 4tfftb1'�t ' I r 1 t I I RED MOUNTAIN SITE a hJ,zxl ' �} r t z� J t\a � r � r _ _ 7 tttR ..�� 23 yt t� htt �+e ri�t�dF xLx x �Cltt ICI �x t'. i TRUCKEE DONNER Red Mountain Tank and Pump Station Public Utility District Project Location