Loading...
HomeMy WebLinkAbout11 Richards Pump Donner Lake Road Tank Agenda Item # , ,'Publi,f Utility;� t� rict Memorandum To: Board of Directors From: Ed Taylor, Water Utility Manager Date: 8-13-2004 Subject: Authorization to execute an agreement with the Town of Truckee for the Richards Pump Station and Donner Lake Road Tank sites. 1. WHY THIS MATTER IS BEFORE THE BOARD: Approval from the Board of Directors is necessary to enter into this agreement. 2. HISTORY. The Donner Lake water system rehabilitation project included the two projects of Richards Dr. Pump Station and the Donner Lake Road water storage tank. Staff considered the use of a District owned parcel on Richards. Dr. for the pump station site. After a study of this location it was determine that the construction of a pump station would difficult and expensive do to wetland area restrictions. An altemative site was identified which is in the Town of Truckee's right-of-way. The location for the Donner Lake Road tank is controlled by elevation and the area needs. The best location is on the Town's right-of-way near the 1-80 interchange. 3. NEW INFORMATION: Staff has worked with the Town and our respective legal counsels to prepare an agreement which will permit the District to construct, operate and maintain the necessary facilities in the Town's right-of-way. The benefit that the Town is requesting is a waver of the facility fee for a two inch service($24,600) at their future Corporation Yard site and the use of water for street maintenance activities. 4. RECOMMENDATION. 1 recommend that the Board authorize staff execute this agreement with the Town of Truckee for the Richards Pump Station and Donner Lake Road Tank sites. 0 Page 1 rown oP F rise • .n°• ENCROACHMENT PERMIT APPLICANT: PERMITTEE: Truckee Donner Public Utility District PO Box 309 Truckee, CA 96160 Peter Holzmeister 530-582-3901 Name Phone Name Phone PROJECT: TDPUD Richards Pump Station Site and Donner Lake Road Tank Site Project- 2004. DESCRIPTION OF WORK: This permit authorizes the installation of a water pump station, together wit related facilities and equipment, including electric and telecommunications facilities and equipment, and a water tank, together with related facilities and equipment, including electric and telecommunications facilities and equipment, partially within the Town of Truckee right-of-way as per the approved construction plans submitted by Truckee Donner Public Utility District (TDPUD) for the TDPUD Richards Pump Station Site and Donner Lake Road Tank Site Project- 2004. Work includes compliance with the conditions of this permit. ATTACHMENTS: 1.Town of Truckee Standard Drawing 54,Trench Excavation and Backfill 2. Town of Truckee Standard Drawings 68, 71, 72, 77 and 78 Erosion Control Details 3. Caltrans Std. Plan T13, Traffic Control System for Lane Closure on Two Lane Conventional Highways SPECIAL CONDITIONS: 1. This Encroachment Permit shall not apply to any other underground construction project within the Town of Truckee right-of-way, except those portions described in the description of work above. In any areas where these provisions conflict with the Town of Truckee Public Improvement and Engineering Standards adopted May 15, 2003, Town Ordinances relating to Encroachment Permits, California Streets and Highways Code, and usual and customary construction practices as defined by the Standard Specifications for Public Works Construction, Caltrans Standard Specifications or any other publication, the provisions of this permit shall govern. 2. In consideration for and as full payment for this permit, TDPUD shall waive the facilities fees for up to a two- inch (2") water meter for the Town's future corporation yard. The Town will be responsible for the connection fees in effect at the time of such connection and for all water usage charges for the connection. Additionally the Town will have access to water for the purpose of road maintenance, to be taken at sites designated by the TDPUD to include the Richards Pump Station 3. This Encroachment Permit is irrevocable by the Town for so long as the District maintains any facilities or equipment on the sites subject to this Encroachment Permit. 4. This Encroachment Permit grants to the District the right to do all things necessary for the construction, installation, upgrade, operations, repair and maintenance of water, electric and communications facilities, equipment and materials, to excavate and re-excavate, to drive vehicles and equipment over, to place markers on, to survey to inspect and repair, to remove rocks, boulders, trees and plant life on the course of excavation and re-excavation. 5. Construction activity within the Town's right-of-way shall be limited to the hours of 7:00 A.M. to 7:00 P.M. Monday through Friday for the duration of this project. Work within the Town of Truckee right-of-way outside Page 1 these work hours shall not occur except with 48 hours notice and prior written approval of the Town Engineer or designee. 6. Construction activity shall be limited to May 1 through October 15, Extension of the construction dates may be granted, provided that written proof of an extension to the Lahontan Regional Water Quality Control Board and/or State Water Control Board grading deadline is provided to the Town Engineer. 7. Prior to any sawcutting of asphalt pavement, applicant shall arrange a field review with representatives of the Town, applicant and permittee to verify sawcut limits. The Town will allow minor alignment changes to avoid conflicts with other underground utilities and to facilitate a more economical installation without prior approval of the Town Engineer. Placement of utility lines shall be outside the pavement wherever feasible. Any deviations of 2' or greater from the approved project plans with regard to alignment of the utility trench shall occur only after prior written approval of the Town Engineer, or designee. The Town Engineer will not consider or approve any alignment modifications, which will violate utility setback requirements, until concurrence signatures have been obtained from all underground utilities, which would be affected by reduction in separation requirements. Failure to obtain prior approvals for alignment modifications will result in the required removal of said utility, with appropriate trench backfill, as per the conditions of this encroachment permit. 8. As-built drawings of the constructed alignment shall be maintained by the applicant during construction and a copy of the as-built project plans shall be supplied to the Town at completion of project construction. 9. This permit will authorize lane closures according to Caltrans Std. Plan T13. Road closures may be allowed with approval of a Traffic Control Plan by the Town Engineer or designee and notification of the following services: Truckee Fire Protection District, Truckee Police Department Dispatch Center, and the Truckee Tahoe Unified School District Transportation Office. A detour plan shall be submitted for any road closure requests with 48 hours notice. 10. Prior to commencing construction, the permittee shall be responsible for contacting all underground utility companies or agencies for verification of the locations of all underground utilities or structures where facilities may conflict with the proposed improvements. Call "Underground Service Alert" (USA) between 2 and 14 days prior to any excavation. The Town is not part of USA, and permittee must call the Town at 582-7706 extension 3112 to request marking of known storm drainage infrastructure. Unknown infrastructure, such as roadway underdrains, which are located during excavation by the permittee shall be brought to the attention of the Town to determine if any repair is required. Applicant and/or permittee is responsible for the repair and any cost of repair to such infrastructure as deemed necessary by the Town. 11. In the event of inclement weather, applicant and/or permittee shall be responsible for snow plowing and traffic safety within any active construction zone of the project. The applicant and/or permittee will also be responsible for surface water damage to storm drain infrastructure, including but not limited to culverts, drainage inlets and roadside ditches, resulting from the permitted work. This includes the cleaning of storm drain infrastructure and maintaining the integrity of trenches and backfill materials within the construction zone, until such time that permanent asphalt has been applied and trench materials removed. 12. Prior to installation of fire hydrants, applicant shall arrange a field review with representatives of the Town, applicant and permittee to determine acceptable fire hydrant locations. Slopes behind fire hydrants shall be stabilized to prevent sloughing onto the hydrants or any roadside ditches. Fire hydrants shall be installed a minimum of 6' behind the edge of pavement or 2' behind the back of curb. Other objects will be a minimum of 10' behind the edge of pavement. 13. At a minimum and in accordance with the SW PPP, erosion control measures shall be placed prior to the start of the permitted work. The erosion control measures shall be cleaned and maintained throughout the course of the permitted work. GENERAL CONDITIONS: CONSTRUCTION: 1. Applicant shall notify the Town Engineer or designee two(2)weeks prior to commencing work. Page 2 2. Applicant shall notify the Town Engineer or designee upon completion of the project. 3. Applicant shall perform continuing maintenance to all trenches during the course of construction on advance of f the project to insure the safe en rome 200r he ubic.Trenches t feeP to l the rear of the lope aeon l not be (unless otherwise perrm ttedpen farther than 300 feet'by he Town the pipe layingoperation Engineer or designee. by the 4. Trenches may be left open overnight if they are made safe by trench plating or other method approved no n Engineer ction o with designee. Traghtednch labargricadles eprovid providing such materials secured. Trench fare consistent a d uff c ents may also be used as a 'to ones create a true barrier and two traffic lanes are maintained. ne may ed on-site, for a 5. Trenching spoils and other materials necessary f oerosonl control olf the l: measures are takencandrbarr barricades are n period of s days, if safely delineated, appropriate place to insure public safety. All materials and eas per item #6.nt not used or 'Longer stalled storage periods wil within 14 days lllrbenallowed loading shall be stored elsewhere, excludingng approved locations with approval of the Town Engineer, or designee. 6. Any storage of equipment and materials or screening of materials on private property shall have written permission and conditions of restoration from the property owner prior to use. 7. Appropriate dust control measures shall be applied during construction. 8. The work contemplated by this permit shall in no way interfere with the designed drainage or established drainage. 9. All pipelines, laterals, and other appurtenances shall be a minimum of in depth as measured from the existing grade within 18" of the edge of pavement Valves, es,ide p ensureication. re gullatators and similar structures may be set to grade with proper marking and mapping for future 10. The option to use open cut or bore techniques to install service laterals or mains is expressly that of applicant. BACKFILL AND COMPACTION: 1. Bedding material shall be to the specifications of applicant in regard to material, installation methods, and compaction. of )inches in 2 Intermediate bs kfillll shall e dsc et of on o debris and appld organic matter and e use native shall bmateerial or importedks over hmateree rial such as Class II aggregate base. nd the limits of er to remove 3 b h rerit oecomesnterfessa y to escav t ee remaining ng after heie n ll e beyo excavation of the boulders shall be backfilled it with suitable material and densified to the same standard as the primary trench. 4 Where rpavement is that removed removed, base than material ght(8) inchesreplaced with Class II aggregate base to the same ced 5. If the trench is less than two(2)feet from the edge hall also bent, aggre ed whereveeit-gate bs curlrently be repl exists. as shown in attached Standard Drawing 54. Aggregate 6. Compaction shall be as follows: Under Roadway upper three feet 90/o relative density in 95% relative density in road base section Shoulder,0o it avement EP) relative density in upper three feet 9 of Page 3 95% relative density in shoulder base section Natural Ground-Shoulder beyond two(2)feet of edge of pavement(EP) 90% relative density total trench an method that applicant desires, which will 7. Compaction tests shall be taken by a licensed engineer or testing laboratory and submitted weekly to theined by own Engineer or designee. Compaction shall be determ Y he soil. accurately and consistently determine the density and moisture content of t applicant, or permittee, as a ears that any trench installed by app Applicant will obtain g. Applicant will guarantee for a period of three (3) y part of this permit will not subside or fail due to defects in materials or workmanship. random compaction tests at varying intervals and depths to ensure pegineer work meets the prescribed criteria neer, The Town En to the discretion may make random tests at his . If'Il provide the samplect kenults onto the Town the same day b'ackfill and compact,i q was completed fails trench u de prescribed criteria, applicant will, at its expense, recompact the section in question. If any such trench under pavement does fail, applicant will repair that subsistence through the following method: The failed section will be excavated and recompacted tothe he paved roadway shalln this permit The fa ed be repaired ection by grinding, conformiil ing the existing paved to 1W below finish paving. pavement two feet(21 beyond the repair and 11/2" in depth. The repair shall be repaved to a smooth surface so thata101 wiry ightreddg elaid a cross it,repairs inotheesamege f cut to manner. Te of cut, will not have more The three-year guarantee cockawillzbegfn again Applicant upon completion of the repair. PAVING: 1 At lute sec the d of eachnd seven-day Itperiod,is the permittee discreton will p lace sph It inthe typesofh asphalt at are ous d Ihowever, if permanent AC paving is used, it shall be placed as described in Sections 2 and 3, listed below. m to restoration 2 outlinedrin Standard Draw g 54'witht C2-AR-4000s asphalt hconcrete rMix, Longitudinal specifications 'f'he pavementection andtransverse . Trasvese excavation perrmed aving requirements hin the roadexcavationyperformed within the pavement hall be base paved from t'he bottom of existing asphalt on will have the following pto an elevation 2' below'tthe top rcadway: of existing asphalt. The entire asphalt surface from the centerline of the street(or the centerline of the lane, as aro methods. A new 2" asphalt overlay determined by the Town)to the edge of pavement on the side of the road, where the trench is located, shall e removed to a depth of 2" through cold milling or other appropriate consisting of C2-AR-4000 asphalt concrete mix with founds of bers shall Petroflex placed Fibe s (orlequivalent) per ton Truckee an specifications. The fiber mix shall contain five (5) p additional 0.25% of asphalt content per ton of asphalt concrete mix. t line with ring around areas t or in 3 Prior tcwhere epcavation was�equire'ng d optside of the navement lorbmalu trench�ne for therremoval of boulders or other objects hall receive a tack coat of SS1 H bituminous binder or AR1000 paving asphalt on all surfaces to be joined. Application of binder shall be by a spray method to and returning to a straight Tine. The edges of the pavement s insure complete coverage of all surfaces. TRAFFIC CONTROL: 1 roadways tTraffic conrot p rso t ell will be r one ane for two dire woronskers or equipment temporarily block travel lanes on major res ing l to 2. Traffic control personnel will not be required: a) On a closed street that has been approved by the Town Engineer, or designee, to be closed and the proper notifications have been made. b} On any road where cones and/or barricades can be used to guide traffic around construction areas maintaining two-way traffic. c) On any road where only workers or equipment (no trenches or spoil materials} intermittently block a travel lane, ones are used toonly alert restroncom oncoming traffic, provided at least one crew member is available to control travel and c Page 4 d) temporarily mrporaelytiblock blocking one travtel lanne,roadways) at least one crew ew mem installation ber is available t crossing cont of travel and hole cones are used to alert oncoming traffic. 3. Traffic shall be allowed to pass in the shortest reasonable time possible, approximately 0-3 minutes. Traffic shall never, under any circumstance, be held longer than 10 minutes. 4. Any traffic control conditions not ad sentat will be subject to negotiations between the Town Engineer or designee and the designated applicant epre OTHER: 1. All work and material not addressed in the above provisions shall conform to applicable Town of Truckee Public Improvement and Engineering Standards. 2. Applicant shall obtain prior to entering on Town's property and maintain, at the applicant's sole cost and ce and property damage insurance, each in the amount of expense, public liability and property damage insuran at least two million dollars {$2,000,000)single occurrence and five million dollars ($5,000,000) in the aggregate, insuring Town, its officers, employees, agents, and volunteers against all liability, claims, demands, or losses icant's use or arising out of or in connection with applicant's activities pursuant to th The is insurance rmit /omayptlerminate upon construction of the permitted work, and/or use of the Town property. applicant's filing of Notice of Completion for the permitted work, as long as the insurance continues to cover date when the Not any occurrences d policy shall and, up to and by endorsement s'ngi ementesatisfactorry to Town', name as additionalce of Completion ainsueeds'Town, County. The applicant'sapplicant's policy is primary and Town's its officers, employees, agents and volunteers, and specify that the app policy is excess and not contributing. The applicant's policy shall also specify, by e dorsement, thatnot ce to Town. shall not be cancelled, suspended, modified, or terminated without thirty(30) days prior The insurance provided by applicant shall be issued by a company licensed to transact such insurance in California and shall have an A.M. Best rating satisfactory to the Town. 3. Applicant shall, to the maximum extent allowed by law, indemnify, defend, and hold harmless Town, its officers, employees, agents, and volunteers, from any and all claims, actions, losses, damages, or liabilities stemming from or otherwise relating to this permit, the Town property, and/or the permitted work, except for such claims, actions, losses, damages or liabilities caused by the sole negligence or gross misconduct of Town. minimum 4. Notification shall ti provided to property residence frontages of said residences.g the project aReasonablefaccess hours shallprior be maintained initiation of the initial construction along property residences along the project. 5ose than that of constructing the project stated above. . This permit shall not be effective for any other purp The applicant and permittee acknowledge the attachments with this permit as listed above. Peter L. Holzmeister,TDPUD General Manager Date Stephen L.Wright,Town Manager Date The permit is approved subject to applicant's and permittee's acceptance of Conditions of Approval. The start of any specified work shall constitute acceptance of all provisions. Peter L. Holzmeister, TDPUD General Manager Date Stephen L.Wright,Town Manager Date Page 5 � Y d r r i rr sr C h G r e a t�771ti 7r it - r�r j-" \r i r ry r.r • DONNER LAKE ROAD ___' rji� L tr r7it7ai it � i C j ,. ya ii .f i�wr r TANK,SITE N Y � ��kr S "� t T s�r2 1`s7r7r 3 {I � - Y.i`r1 Ea 17 1`}sy } K .;1.Jt' t ✓rJ 1 yr pq � � r ° � r1 ss I v 442 5 _._.« __" t ICHARDS BOULEVARD R PUMP STATION SITE TRUCKEE DONNER Richards Boulevard Pump Station and Public Utility District Donner Lake Road Tank Site Locations