Loading...
HomeMy WebLinkAbout9 Featherstone Tank Well Review Agenda Item # Iv � r Memorandum To: Board of Directors From: Ed Taylor, Water Utility Manager Date: 8-12-2004 Subject: ENGINEERING SERVICES FOR FEATHERSTONE TANK WELL ENVIRONMENTAL REVIEW (CEQA) 1. WHY THIS MATTER IS BEFORE THE BOARD Board approval is required for services contracts. 2. HISTORY In 2003 exploratory test holes were drill to locate future well sites for the District's water supply. Four sites were identified and a new production well was drilled on one of them, the Prosser Village Well Site, The Prosser Village Well was identified as a new system supply to offset the additional water demands of Donner Lake area being added to the main system. The additional demands for water imposed by development require that an additional water source be developed. Staff is proposing to drill a new well at a site identified in our test well project to be a good location. This site is referred to as Featherstone Tank Site. 3. NEW INFORMATION Staff is requesting the approval of a contract for services with Sauers Engineering for the Environmental Review and to make recommendations for compliance with California Environmental Quality Act (CEQA)for the Featherstone Tanks Well Project. SCOPE OF ENGINEERING SERVICES Environmental Review $8,000 4. FUNDING Funding for this project is from Facility Fees. 0 Page 1 3 z 5. RECOMMENDATION That the Board approves the Engineering Services agreement with Sauers Engineering, Inc. for service Environmental Review for the Featherstone Tank Well Project as defined in the attached proposal dated August 6, 2004. ATTACHMENT.' Sauers Engineering Proposal for professional services 0 Page 2 SAUERS ENGINEERING Sao 266 68S4 08/09/04 02:29pm P. 001 Sauers Engineering, Inc. Civil &Environmental Engineers August 6, 2004 Mr. Ed Taylor, District Water Operations Manager Truckee Donner Public Utility District P.O. Box 309 Truckee, CA 96160-0309 SUBJECT: FEATHERSTONE TANK WELL -CEQA ENVIRONMENTAL REVIEW Dear Ed: This letter is our proposal for professional services to provide environmental review in compliance with the California Environmental Quality Act(CEQA)for the District's proposed Featherstone Tank Well. The project would involve the construction of a new production well at the site of the existing Featherstone Tank. The project will also include the construction of a well pump station and pipeline to connect the well to the distribution system. Based on our experience with similar District projects, we anticipate that a negative declaration will be the appropriate level of review for the project. Scope of Services For the construction of the new well, we will prepare an environmental initial study and proposed negative declaration following CEQA Guidelines. We will distribute preliminary documents to the State Clearinghouse and responsible agencies. We will coordinate a public hearing, receive oral and written comments and prepare responses. We will prepare a final negative declaration and notice of determination and file appropriate final documents with the Nevada County Clerk and the State Clearinghouse. Schedule of Services We anticipate needing approximately thirty to forty-five days following the District's authorization to proceed to prepare the,initial study and the proposed negative declaration. Depending on the number and nature of comments,preparation of final documents for approval by the District should take an additional thirty to sixty days including the public review period and public hearing. We expect the schedule to be generally as shown below. 440 lower Crass Valley Road, Suits A. Nevada City,CA 95959 (530) 265-8021 Fax (530) 265-6834 SAUERS ENGINEERING 630 285 8834 08l09104 @2:23pm P. 002 t 3 't Task Sept Oct Nov Dec Initial Study Public/Agency Review/Hearing Comments/Responses Final Adoption Engineer's Fee We propose to provide the above described services for a fixed fee of$8,000. These fees do not include filing fees with the Department of Fish and Game. Closure Thank you for the opportunity to provide this proposal for environmental review services for the new well project I am available to discuss this proposal with you at your convenience and with the Board of Directors at the August 18, 2004 board meeting. Yours/Ifily, Keith Knibb