Loading...
HomeMy WebLinkAbout5 North Shore Donner Lake Services _ _ Agenda Item # RUCKEE DONNER P4161lic Utility District Memorandum To: Board of Directors From: Neil Kaufman Date: August 10, 2004 Subject: Change Order No. 1 for the Installation of Services for the North Shore of Donner Lake— Contract A Project 1. Why this matter is before the board: Approval from the Board of Directors is necessary to issue a Change Order to a constrcution contract. 2. History: The Board previously awarded the Installation of Services for the North Shore of Donner Lake— Contract A project to Hard Line Excavating (HLE). 3. New information: I am requesting a Change Order to the Contract for issues covered under two general items that will cover all of the outstanding issues encountered from the start of the project to August 5, 2004. Item 1: Rock was encountered at three locations requiring either blasting or jack hammering. Removal of this rock from the trench and off-haul of the rock for disposal is considered extra work. HLE is due $3,843.50 for rock excavation. Item 2: The work of this Contract involves the installation of fire hydrants and services on the narrow private roadways at Donner Lake. The main line pipe in these areas was installed in 2002 in a joint project with Southwest Gas. As part of the 2002 project, tees for the future installation of fire hydrants were installed. At one fire hydrant tee, it was determined that the initial tee installation created a conflict with the sewer line and it was necessary to rotate the tee 180 degrees so that the fire hydrant would be situated on the other side of the road. HLE is due $876.25 for this work. 4. Recommendation: I recommend that the Board authorize Contract Change Order #1, in the amount of a $4,719.25 payment to Hard Line Excavating from the District. Attachments: Change Order Form Page 1 _ . . Change Order } INSTALLATION OF SERVICES FOR THE NORTH SHORE OF s Contract Name: DONNER LAKE — CONTRACT A Contract Change Order No: 1 Ong. Contract Amt. $ 608,610.00 Days NA Date: August 10 2004 Prev. Apprd Changes $ 0.00 Days NA Contractor: Hard Line Excavating This Change $ 4,719.25 Days NA Revised Contract Amt. $ 613,329.25 Days NA This Change Order covers changes to the subject Contract as described herein. The Contractor shall construct, furnish equipment and materials, and perform all work as necessary or required to complete the Change Order Items for a Lump sum price agreed upon between the Contractor and District. Increase in (Decrease) Contract Time Contract in Contract Extension Description of Changes Amount $ Amount $ da s [2) ) Rock Excavation $3,843.50 NA Modification of Hydrant Tee $876.25 NA Totals $4,719.75 Net change in contract amount (increase or decrease) $4,719.25 The amount of the Contract will be increased by the sum of $4,719.25 and the Contract Time shall not be extended. The undersigned Contractor approves the foregoing Change Order as to the changes, if any, in the contract price specified for each item including any and all supervision costs and other miscellaneous costs relating to the change in work, and as to the extension of time allowed, if any, for completion of the entire work on account of said Change Order. The Contractor agrees to furnish all labor and materials and perform all other necessary work, inclusive of the directly or indirectly related to the approved time extension, required to complete the Change order items. This document will become a supplement of the contract and all provisions will apply hereto. It is understood that the Change Order shall be effective when approved by the District. Accepted: Q-�' %�`� \ /Contractor Date: ture) Approved: (District Date: (Signature)