Memorandum
To: Board of Directors
From: Ed Taylor, Water Utility Manager
Date: 9/29/2004
Subject: Bid Award for Pumps and Motors for Richards Pump Station.
BACKGROUND:
The Richards Pump Station is designed and ready for construction. An important
component of the pump station is the pumps and motors. The pumps and motors have a
two to three month lead time on delivery. This project is funded by the Donner Lake
Assessment District.
NEW INFORMATION:
Staffs advertised for and accept and open bids for three new pumps and motors with a bid
opening date of September 29, 2004. One bid was received. Attached is a summary
showing the bid details.
The low bidder is Flowserve Corporation of Chico, California. We have reviewed the bid and
determined that the bid is responsive to the contract requirements. Flowserve Corporation
has supplied well and vertical booster pumps to the Districts in the past. The pumps
supplied in the past are of excellent quality and have a good operational and maintenance
history.
RECOMMENDATION:
I recommend that the Board award the contract for three booster pumps and motors in the
total amount of$66,462.00 plus tax to Flowserve Corporation of Chico, California.
Attachment: Bid Summary
•Page 1
Bid Opening Report
Bids were opened on September 29, 2004 at 1:00 p.m.
For Richards Drive Pump Station
CONTRACTOR Bid Noncollusion Bid is 1 Addendum TOTAL
Bond Affidavit signed Acknowledged
2.
3.
4.
5.
6.
7.
8.
9.
District Representative Signed: ) r ( !-a.( Dater Y 6�,,
CM 105(Revised 10/01/93)