Loading...
HomeMy WebLinkAbout5 Northside Transmission Pipeline Project Agenda Item # Public Utility District �►NNER U4, „....., 1 k.... Memorandum To: Board of Directors From: Neil Kaufman Date: October 8, 2004 Subject: Change Order No. 2 for the Northside Transmssion Pipeline Project 1. Why this matter is before the board: Approval from the Board of Directors is necessary to issue a Change Order to a constrcution contract. 2. History: The Board previously awarded the Northside Transmission Pipeline project to Longo Incorporated. On July 7, 2004, the Board of Directors approved Change Order No. 1 for this Contract. That Change Order covered the construction of about 730 feet of pipeline on High Street at a cost of $81,282. 3. New information: Construction of the project began in late June. 1 am requesting a Change Order to the Contract for issues covered two general items that will cover all of the outstanding issues encountered as of September 30, 2004. Item 1: Rock removal requiring blasting was encountered at a few locations and Longo is due $1,970 for this rock removal work. Item 2: There are two flow control stations that are part of the project. These stations consist of an underground vault that houses a control valve with piping that enters and exits the vault, connect to the valve. Due to some differences between the existing grades as shown on the drawings, and actual field conditions, it was necessary to install a total of four vault extensions on these two vaults. Longo is due $2,750 for purchase and installation of these vault extensions. 4. Recommendation: I recommend that the Board authorize Contract Change Order #2, in the amount of a $4,720 payment to Longo Incorporated. Page 1 Attachments: Change Order Form Page 2 U4, . * - Change Order ItytrIct Public Utility District Contract Name: NORTHSIDE TRANSMISSION PIPELINE Contract Change Order No: 2 Orig. Contract Amt. $ 610,658.00 Days NA Date: October 8, 2004 Prev. Apprd Changes$ 81,282.00 Days NA Contractor: Longo Incorporated This Change $ 4,720.00 Days NA Revised Contract Amt. $ 696,660 Days NA This Change Order covers changes to the subject Contract as described herein. The Contractor shall construct, furnish equipment and materials, and perform all work as necessary or required to complete the Change Order Items for a lump sum price agreed upon between the Contractor and District. Increase in (Decrease) Contract Time Contract in Contract Extension Description of Changes Amount $ Amount $ (days) 1) Control Valve Vault Extensions $2,750 NA 2) Rock Excavation $1,970.00 NA Totals $4,720.00 Net change in contract amount (increase or decrease) $4,720.00 The amount of the Contract will be increased by the sum of $4,720.00 and the Contract Time shall not be extended. The undersigned Contractor approves the foregoing Change Order as to the changes, if any, in the contract price specified for each item including any and all supervision costs and other miscellaneous costs relating to the change in work, and as to the extension of time allowed, if any, for completion of the entire work on account of said Change Order. The Contractor agrees to furnish all labor and materials and perform all other necessary work, inclusive of the directly or indirectly related to the approved time extension, required to complete the Change order items. This document will become a supplement of the contract and all provisions will apply hereto. It is understood that the Change Order shall be effective when approved by the District. r' " Contractor Date: Accepted: �' do ' (Signature) Approved /District Date: " (Signature)