Loading...
HomeMy WebLinkAbout7 Installation North Shore Donner Lake Services Agenda Item # i i uu .Y „ . � . Public UtilityDistrict Memorandum To: Board of Directors From: Neil Kaufman Date: December 10, 2004 Subject: Change Order No..3for the Installation of Services for the North Shore of Donner Lake— Contract A Project 1. Why this matter is before the board: Approval from the Board of Directors is necessary to issue a Change Order to a constrcution contract. 2. History: The Board previously awarded the Installation of Services for the North Shore of Donner Lake—Contract A project to Hard Line Excavating (HLE). On September 1, 2004, the Board approved Change Order No. 1 for this project in an amount of $4,719.25. This Change Order all of the outstanding issues encountered from the start of the project to August 5, 2004. On September 15, 2004, the Board approved Change Order No. 2 for this project in an amount of $70,925.00. This Change Order added about 680 feet of new pipeline and four services into the project. 3. New information: On November 18, District staff performed a final walkthrough on the project. All portions of the project have been completed except for one item. There are eight service laterals on Denton Avenue where one of HLE's crews forgot to install locator wire along the lateral. This problem was identified during punch list inspections and brought to HLE's attention. However, HLE was unable to rectify this problem before the Lahontan RWQCB permit for this project expired. HLE has stated its intention to correct this problem next May when the District has a valid Lahontan RWQCB permit. It was agreed that the District would withhold $10,000 from the amount owed to HLE until this problem is corrected. Peter Holzmeister, Steve Gross and I held a discussion regarding the proper way to approach the contractual issues associated with this locator wire problem. Steve Gross reviewed the appropriate codes and recommended the following procedure: Page 1 1) The Board consider a Change Order that covers all outstanding issues related to the project except for the missing locator wire described above. This issue is covered in a memorandum. 2) The Board pass a resolution that finds that the project is considered complete with the exception of the missing locator wire on eight service laterals on Denton Avenue. This resolution would approve reducing the retention amount on the contract from $79,892.87 to $10,000. 3) The Board authorize filing of a Notice of Cessation with the Nevada County Recorder's Office. A Notice of Cessation is described in Section 3092 of the California Civil Code. 3092. "Notice of cessation" means a written notice, signed and verified by the owner or his agent, containing all of the following: (a) The date on or about when the cessation of labor commenced. (b) A statement that such cessation has continued until the recording of the notice of cessation. (c) The name and address of the owner. (d) The nature of the interest or estate of the owner. (e) A description of the site sufficient for identification, containing the street address of the site, if any. If a sufficient legal description of the site is given, the validity of the notice shall not, however, be affected by the fact that the street address is erroneous or is omitted. (f) The name of the original contractor, if any, for the work of improvement as a whole. (g) For the purpose of this section, "owner" means the owner who causes a building, improvement, or structure, to be constructed, altered, or repaired (or his successor in interest at the date of a notice of cessation from labor is filed for record) whether the interest or estate of such owner be in fee, as vendee under a contract of purchase, as lessee, or other interest or estate less than the fee. Where such interest or estate is held by two or more persons as joint tenants or tenants in common, any one or more of the cotenants may be deemed to be the "owner" within the meaning of this section. Any notice of cessation signed by less than all of such cotenants shall recite the names and addresses of all such cotenants. The notice of cessation shall be recorded in the office of the county recorder of the county in which the site is located and shall be effective only if there has been a continuous cessation of labor for at least 30 days prior to such recording. This Notice of Cessation will provide all subcontractors and suppliers public notice that work on the project has stopped and that they should notify the District of any outstanding claims for payment, similar to a Notice of Completion. The Contract will then remain open with the District holding $10,000 until locator wire issue is corrected. Mr. David Waters, President of HLE, has expressed an intention to correct the problem in May once the District has a valid Lahontan Page 2 d { r RWQCB permit. Upon correction of this problem, I will inform the Board and recommend that a Notice of Completion be filed at that time. As described in the Code Section cited above, work must have ceased for 30 days before the Notice of Cessation can be filed. Work stopped on November 19, therefore 30 days will not have passed by the December 15 Board Meeting. At the January 5, 2005 meeting, I will present the resolution addressing the reduced retention amount and filing of the Notice of Cessation for consideration by the Board. Therefore, I am requesting a Closeout Change Order to the Contract for issues covered under thirteen general items that will cover all of the remaining issues related to this project. Item 1: The contract is based on a unit price bid. The attached table shows the differences between bid totals and the amounts actually constructed. This analysis results in amount of $795.00 owed to HLE. Item 2: A total of 97 hours of rock excavation were performed during the period of August 6 through November 12, 2004. This work involved blasting on a time and materials basis and totals $73,741.18. Item 3: There are three fire hydrant installations where it was necessary to install extensions in order to bring the hydrants to a proper elevation. HLE is owed $2,003.93 for the parts and labor associated with this work. Item 4: In most cases, tee and valve assemblies for the future installation of fire hydrants were installed with the mainline piping in 2002. The Bid Item for fire hydrants in this Contract was based upon the existence of these tee and valve assemblies. However, there were four locations where the tees were inadvertently omitted during the 2002 project. At these locations, it was necessary for HLE to purchase and install a tapping sleeve to allow installation of the fire hydrant. HLE is owed $11,237.27 for the parts and labor associated with this work. Item 5: On West Reed Avenue, a 6" valve was installed for the purpose of connecting the new 12-inch piping to the existing 6" inlet/outlet pipeline that feeds the storage tanks at the Greenpoint Springs property. About 100 feet away, another 6" valve was installed for the installation of a fire hydrant. The District's Inspector for this project mistakenly directed HLE to install the fire hydrant on the 6" valve intended for connection to the tank inlet/outlet pipeline. This error was discovered after the fire hydrant had been installed. It was then necessary to remove the hydrant and install it in the proper location. HLE is owed $6,617.51 for this work. Item 6: During the joint water/gas pipeline construction in 2002, one of the drainage ditches along West Reed Avenue was not properly restored. Two property owners on this street described the problems that had been occurring during the last two Winters. I directed HLE to clean out and regrade this drainage ditch and HLE is owed $1,311.02 for this work. Item 7: As discussed in a presentation to the Board on November 17, 2004, it is intended to use a portion of the old 6-inch pipe that feeds Cedar Point Drive in order to convey water from the Greenpoint Springs collection system to Donner Lake for an interim period. In order to perform this conveyance, it was necessary to install a tap and 2" Page 3 Y i pipe to carry water from the old 6-inch pipe to a drainage ditch. HLE was directed to perform this work and is owed $3,263.80. Item 8: In 2003, about 160 feet of pipeline was installed by HaII's Excavating on Reed Avenue. This work was performed as part of construction of a single family residence at 14888 Donner Pass Road. A temporary service lateral was installed to # serve this house until the new pipeline was placed into service. This Summer the new pipe was placed into service and HLE connected the temporary service lateral # to the new pipe. HLE is due $1,340.98 for this work. Item 9: Change Order No. 2 covered the installation about 180 feet of additional pipeline on Reed Avenue. Part of this work included pressure testing of pipelines installed by Southwest Gas in 2002 and Hail's Excavating in 2003. Initially, the pipe would not pass the mandated pressure test. HLE spent some time investigating the pipe and it was eventually determined that a valve for a future fire hydrant was not fully closed and was leaking. This valve was located at the connection between the work by Southwest Gas and Hail's Excavating and had been paved over. HLE excavated this valve, ensured that it was properly sealed and then installed a proper valve riser. Considering that the leak was not the fault of HLE, HLE is due $2,947.91 for rectifying this problem. Item 10: As described above, Change Order No. 2 covered the installation about 180 feet of additional pipeline on Reed Avenue. There was one large tree along this pipeline alignment that was in close proximity to the existing overhead pole line. I agreed with HLE that a professional tree service should be used to remove this tree. The cutting and removal of the tree, along with removal and disposal of the stump total $3,521.01. Item 11: Change Order No. 2 also covered the installation about 500 feet of additional pipeline on along an easement between Denton Avenue and Robin Lane. A photograph of this alignment was shown to the Board in the presentation on November 17, 2004. After completion of the pipeline installation, it was necessary to place a layer of wood chips across the entire area as an erosion control measure. HLE is due $3,714.54 for this work. Item 12: There were a number of locations were customer service laterals were constructed of very usual materials such as copper refrigeration piping. HLE could not use standard fittings to connect these laterals. It was necessary for HLE to send employees to procure special fittings to perform these connections. In addition, while performing the installation of new service laterals and meter boxes, occasionally a customer will complain about low pressure after installation of the new piping. Almost always, this low pressure is the result of some dirt or debris that made its way into the customer's lateral and then partially clogged a valve downstream. Normally, flushing out the customer line will solve the problem. The presence of dirt or debris in the lateral is considered the fault of the contractor and it is his responsibility to solve the problem. Similar to a situation on the contract with Hansen Brothers, in a couple of circumstances, HLE identified problems with the Page 4 z t x customer's piping that were not the fault of HLE. At one house, a HLE employee ! worked with the property owner until about 10:00 pm until the problem was identified. g I believe that HLE should be reimbursed for the costs incurred by these customer r service issues. This total is $4,180.27. r Item 13: This item officially extends the Contract Completion Date from October 15, 2 004 to May 30, 2005. This will provide the entire month of jmay 2005 for HLE to correct the Y locator wire problem. ti f 4. Recommendation: a) I recommend that the Board authorize Contract Change Order No. 3, in the amount of a $114,674.42 payment to Hard Line Excavating from the District. Attachments: Change Order Form Bid vs. Actual Table Page 5 Change Order INSTALLATION OF SERVICES FOR THE NORTH SHORE OF Contract Name: DONNER LAKE - CONTRACT A 3 Orig. Contract Amt.$ 608,610.00 Days NA Contract Change Order No: a Date: November 18, 2004 Prev. Apprd Changes$ 75,644.25 Days NA This Change$ 114,674.42 Days NA s Contractor: Hard Line Excavating s Revised Contract Amt. $ 798,928.67 Days NA This Change Order covers changes to the subject Contract as described herein. The Contractor shall construct, 3 furnish Items for equipment lmp sum pr cetagaeed upols, and n betweenerform fl work as the Contractors and necessary stric or required to complete the Change Order Increase in (Decrease) Contract Time Contract in Contract Extension Description of Changes Amount $ Amount $ da .00 NA 1} Bid vs. Actual Quantities 795 741.18 NA 2) Rock Excavation 73, 93 003. NA 3) Fire Hydrant Extensions 21 NA 4) Fire Hydrant Tapping Sleeves &Valves 11,23727 51 NA617. 5) Fire Hydrant on West Reed Avenue 6, 02 311. NA 6) West Reed Avenue Drainage Ditch 1, NA 7) Z Tap on West Reed Avenue 3,263.80 98 NA340. 8) Service at 14888 Donner Pass Road 1, 91 947. NA 9} Testing on Reed Avenue 2, NA 10) Tree Removal on Reed Avenue $3,521.01 54 NA714. 11) Erosion Control at Denton Avenue $3, NA $4,180.27 12) Customer Service Issues 227 13) Adjustment of Contract Time $114,674.42 Totals Net change in contract amount (increase or decrease) $114,674.42 and the Contrt Time be ened The amount of the Contract will be increased by the sum of$114,674g Change Orlder asttoahe r by 227 days until May 30, 2005. The undersigned Contractor approves the foregoin changes, if any, in the contract price specified for each item including any and all supervision costs and other miscellaneous costs relating to the change in work, and as to the extension of time allowed, if any, for completion of the entire work on account of said Change Order, The Contractor agrees to furnish all labor and materials and perform all other necessary work, inclusive of the directly or indirectly related to he approved the time ct and all required to complete the Change order items. This document will become a supplementroved b the provisions will apply hereto. It is understood that the Change Order shall be effective when approved Y District. N: /Contractor Date: Accepted: (Signature) Approved: /District Date: (Signature) t x Analysis of Bid Quantities vs.Actual Quantities Constructed Installation of Services for the North Shore of Donner lake-Contract A Contractor: Hard line Exacavating Bid Amounts Actual Amounts Bid Item Description Quantit Units Unit Pdce Subtotal Quanti Units Unit Price Subtotal 1 Mobilization -00 1 LS $ 20,000.00 $ 20,000.00 1 LS $ 20,065 00 $ 10,400 00 160 FT $ 65,00 $ 10,400.00 160 FT $ 30.00 $ 95,520.00 2 8"Water Main 4,000 FT $ 30.00 $ 120,000.00 3,184 FT $ 3 1.5"PE Service Lateral 20 FT $ 3300 $ 660.00 20 FT $ 33.00 $ 000.00 4 2"PE Service Lateral 30 EA $ 1,250.00 $ 37,500.00 32 EA $ 1,250.00 $ 49,000.00 5 Single Water Meter Assembly for Non-traffic Areas t7 EA $ i 750 00 $ 29,750.00 28 EA $ 1,750.00 $ 49,000.00 6 Single Water Meter Assembly for Traffic Areas EA $ 2,200.00 $ 83,600.00 7 Double Water Meter Assembly for Non-traffic Areas 60 EA $ 2,200.00 $ 172,800.00 38 8 Double Water Meter Assembly for Traffic Areas 26 EA $ 2,800.00 $ 72,800.00 43 EA $ 2,500.00 $ 122,500.00 9 i"Commercial Water Service for Non-traffic Areas 1 EA $ 2,500.00 $ 2,50' 1 EA $ 2,500.00 $ 2,500 00 10 Additional Cost for Internal Pressure Reducing Valve 120 PER BOX $ 175.00 $ 21,000.00 119 PER BOX $ 175.00 $ 20,825.00 1 i Fire Hydrant Assembly and Lateral(4-foot bury) i6 EA $ 3,800.00 $ 60,80000 0 EA $ 4,000.00 $ 12 Fire Hydrant Assembly and Lateral(4.5-foot bury) 4 EA $ 4,000.00 $ 16,000.00 0 EA $ 4,100.00 $ 13 Fire Hydrant Assembly and Lateral(5-foot bury) 4 EA $ 4,100.00 $ 16,400.00 24 EA $ 4,100.00 $ 94,800.00 14 Abandon Existing Fire Hydrant 4 EA $ 1,200.00 $ 41800.00 4 EA $ 1,200.00 $ 6,000,00 15 Connection to Existing 12"Pipe at Donner Avenue and Patty Lane 1 LS $ 6,000.00 $ 6,000.00 1 LS $ 4,000.00 $ 4,000.00 16 Connection to Existing 8"Pipe at East Reed Avenue and Patty Lane i LS $ 4,000.00 $ 4,000.00 , LS $ 4,003.25 $ 9,000.00 17 AC Pavement 12,000 SO FT $ 3.25 $ 39,000.00 12,000 SO FT $ 3.00 $ 15,000.00 ,000.00 18 All Other Work fl wired b the Contract Documents 1 LS $ 15,000.00 $ 15,000.00 1 LS $ 15,000.00 $ 610,1105,00 $ 608,610.00 Amount Owed to HLE: $ 1,495,00 Bid Amounts Actual Amounts Bid Item Description Quanti Units Unit Price Subtotal Quantit Units Unit Price Subtotal 500 �- $ gg.00 $ 44,500.00 500 FT $ 89.00 $ 44,500.00 1 12-inch Pipe-Denton 1 EA $ 1, 1,250.00 $ 1,250.00 600.00 $ 1,600.00 1 EA $ 2 Single Water Meter Assembly for Non-traffic Areas 0 PER BOX $ 175.00 $ - 1 PER BOX $ 175.00 $ 175.00 2A Additional Cost for Internal Pressure Reducing Valve 20 FT $ 30.00 $ 600.00 20 FT $ 30.00 $ 600.00 3 1.5"PE Service Lateral EA $ 1,400,00 $ 2,800.00 4 Connections to Existing Piping 2 EA $ 1,400.00 $ 2,800 00 2 $ 65.00 $ 11,700.00 180 FT $ 65.00 $ 11,700,00 180 FT $ EA $ 1,250.00 $ 3,750.00 5 4-inch pipe 3 EA $ 1,600.00 $ 4,800.00 3 525.00 6 Single Water Meter Assembly for Non-traffic Areas 0 PER BOX $ 175.00 $ - 3 PER BOX $ 175.00 $ 6A Additional Cost for Internal Pressure Reducing Valve 60 FT $ 30.00 $ 1,800.00 60 FT $ 30.00 $ 1,800.00 7 1.5"PE Service Lateral EA $ 1,400.00 $ 2,800.00 8 Connections to Existing Piping 2 EA $ 1,403.25 $ 2 325.00 100 SO FT $ 3.25 $ 325.00 100 SO FT $ $ 70,225.00 0 AC Pavin $ 70,925.00 Amount Owed to District: $ (700.00) P. 's R Change Order Uk Public INSTALLATION OF SERVICES FOR THE NORTH SHORE OF Contract Name: DONNER LAKE - CONTRACT A Contract Change Order No: 3 Orig. Contract Amt. $ 608,610.00 Days NA Date: November 18, 2004 Prev. Apprd Changes $ 75,644.25 Days _NA Contractor: Hard Line Excavatinq This Change$ 114,674.42 Days NA Revised Contract Amt. $ 798,928.67 Days NA This Change Order covers changes to the subject Contract as described herein. The Contractor shall construct, furnish equipment and materials, and perform all work as necessary or required to complete the Change Order Items for a lump sum price agreed upon between the Contractor and District. Increase in (Decrease) Contract Time Contract in Contract Extension Description of Changes Amount $ Amount $ (days) 1) Bid vs. Actual Quantities 795.00 NA 2) Rock Excavation 73,741.18 NA 3) Fire Hydrant Extensions 2,003.93 NA 4) Fire Hydrant Tapping Sleeves &Valves 11,237.27 NA 5) Fire Hydrant on West Reed Avenue 6,617.51 NA 6) West Reed Avenue Drainage Ditch 1,311.02 NA 7) 2"Tap on West Reed Avenue 3,263.80 NA 8) Service at 14888 Donner Pass Road 1,340.98 NA 9) Testing on Reed Avenue 2,947.91 NA 10) Tree Removal on Reed Avenue $3,521.01 NA 11) Erosion Control at Denton Avenue $3,714.54 NA 12) Customer Service Issues $4,180.27 NA 13) Adjustment of Contract Time 227 Totals $114,674.42 Net change in contract amount (increase or decrease) $114,674.42 P. q S The amount of the Contract will be increased by the sum of $114,674.42 and the Contract Time shall be extended by 227 days until May 30, 2005. The undersigned Contractor approves the foregoing Change Order as to the changes, if any, in the contract price specified for each item including any and all supervision costs and other miscellaneous costs relating to the change in work, and as to the extension of time allowed, if any, for completion and materials and of the entire work on account of said Change Order. The Contractor agrees to furnish all labor perform all other necessary work, inclusive of the directly or indirectly related to C of the oved time contract and all required to complete the Change order items. This document will become a supplement b the provisions will apply hereto. It is understood that the Change Order shall be effective when approvedY District. Accepted; /Contractor Date: /2- (Signature) 9 ) Approved: /District Date: (Signature) Analysis of Bid Quantities vs.Actual Quantities Constructed Installation of Services for the North Shore of Donner Lake•Contract A m Contractor: Hard Line Exacavating a Bid Amounts Actual Amounts it Price Bid Item Description Quanti Units Unit Price Subtotal Qu21 ULSs $U20,000 00 $ Subtotal 20 000.00 1 LS $ 20,000-00 $ 20,000.00 1 1 Mobilization 160 F7 $ 65.00 $ 10,400.00 160 FT $ 65.00 $ 10,400.00 2 8"Water Main 30.00 $ 120,000.00 3,184 FT $ 30.00 $ 95,520.00 4000 FT $ 3 1.5"PE Service Lateral 20 FT $ 33.00 $ 660.00 20 FT $ 50.00 $ 000.00 4 2"PE Service lateral 30 EA $ 1,250.00 $ 37,500.00 32 EA $ 1,250.00 $ 40,000.00 5 Single Water Meter Assembly for Non-traffic Areas Y7 EA $ 1,750.00 $ 29,750.00 28 EA $ 2 200.00 $ 63,600.00 6 Single Water Meier Assembly for Traffic Areas 60 EA $ 2,200.00 $ 132,000.00 38 EA $ 2,200.00 $ 83,600.00 7 Double Water Meter Assembly for Non-traffic Areas 26 EA g 2,800,00 $ 72,800.00 43 EA $ 2,800.00 $ 120,400.00 8 Double Water Meter Assembly for Traffic Areas i EA $ 2,500.00 $ 2,500.00 1 EA $ 2,500.00 $ 0,825.00 9 1"Commercial Water Service for Non-traffic Areas 120 PER 80X $ 175.00 $ 21,000.00 119 PER BOX $ 17500 $ 20,825 00 10 Additional Cost for Internal Pressure Reducing Valve t6 EA $ 3,800.00 $ 60,800.00 0 EA $ 3,800.00 $ 11 Fire Hydrant Assembly and Lateral(4-foot bury) 4 EA $ 400000 $ 16,000.00 0 EA $ 4,100,00 $ 12 Fire Hydrant Assembly and Lateral(4.5-foot bury) 4 EA g 4,100.00 $ 16,400.00 24 EA $ 4,100.00 $ 98,400.00 13 Fire Hydrant Assembly and lateral(5-foot bury) 4 EA $ 1,200,00 $ 4,800,00 4 L5 $ 6 000.00 $ 6000.00 14 Abandon Existing Fire Hydrant i LS $ 6.000.00 $ 6,000.00 1 6,000.00 $ 6,000.00 15 Connection to Existing 12"Pipe at Donner Avenue and Patty Lane 1 LS $ 6.000.00 $ 4,000.00 i LS $ 16 Connection to Existing 8"Pipe a1 East Reed Avenue and Patty Lane 12 000 SO FT $ 3.25 $ 39,000.00 12,000 SO FT $ 3.25 $ 39,000.00 17 AC Pavement 1 LS $ 15,000.00 $ 15,000.00 1 LS $ 15,000.00 $ 615,0700.00 .00 18 All Other Work Required b the Contract Documents $ 608,610.00 Amount Owed to HLE: $ 1,495.00 Bid Amounts Actual Amounts Bid Item Description htrilal Quantit Units Unit Price Subtotal Quantil Units Unit P889.00 $ S 44 500.00 i De inch Pipe-Denton 500 FT $ 89.00 $ 44,500.00 500 FT $ 2 Single Water Meter Assembly for Non-traffic Areas 1 EA $ 1,600.00 $ 1,600.00 1 EA $ t,250.00 $ 1,250.00 0 PER BOX $ 175.00 $ 1 PER BOX $ 175.00 $ 175,00 2A Additional Cost for Internal Pressure Reducing Valve 20 FT $ 30.00 $ 600.00 20 FT $ 30.00 $ 600,00 3 1.5"PE Service Lateral 2 EA $ 1,400.00 $ 2,800-00 2 EA S 1,400.00 $ 2,800.00 4 Connections to Existing Piping $ - 65-00 $ 11,700.00 180 FT $ 65.00 $ 11,70000 180 FT $ 5 4-inch pipe 3 EA $ 1,600.00 $ 4,800.00 3 EA $ 1,250.00 $ 3,750.00 6 Single Water Meter Assembly for Non-traffic Areas 0 PER BOX $ 175.00 $ - 3 PER BOX $ 175.00 $ 525.00 6A Additional Cost for internal Pressure Reducing Valve 60 FT $ 30.00 $ 1,800.00 60 FT $ 30.00 $ 1,800.00 7 1.5"PE Service Lateral 2 EA $ 1,40000 $ 2,800,00 2 EA $ i 40000 $ 2,800.00 325.00 8 Connections to Existing Piping 100 SO FT $ 3.25 $ 325.00 100 SO FT $ 3.25 $ 70,225,00 0 AC Paving $ 70,925.00 Amount Owed to District: $ (700-00)