Loading...
HomeMy WebLinkAbout12 Electric Panel Upgrades Agenda Item # I Memorandum To: Board of Directors From: Stephen Hollabaugh Date: September 26, 2003 Date of Board Meeting: October 1, 2003 Subject: Policy on electric panel upgrades 1. WHY THIS MATTER IS BEFORE THE BOARD A policy for handling electric panel upgrades is attached. Only the Board can authorize a new policy. 2. HISTORY At the September 171h Board meeting, Richard Wrenn came before the Board to discuss the facilities fee calculation for upgrading his electric panel. The Board reviewed our current method of calculating facilities fee for electric panel upgrades and recommended another method. 3. NEW INFORMATION By way of clarification, when a customer increases his panel size the customer pays the facilities fees for the upgrade. A policy for calculating electric facilities for electric panel upgrades is attached. The policy attached is in section 7.12.025 Application for Service — New Construction and Upgrades. I propose to add section 7.12.025.5 to address this issue, which is attached. RECOMMENDATION Consider adding the policy 7.12.025.5 concerning electric panel upgrades and the calculation of facilities fees for electric panel upgrades. Existing District Code Title 7 Electric Service 7.12.025 Application for Service - New Construction and Upgrades 7.12.025.1 Applications for electrical service shall be defined as an electrical project as used in this rule. 7.12.025.2 Electrical project applications shall be processed in accordance with the Electrical Project Review Guidelines contained in Appendix A. 7.12.025.3 The applicant shall be responsible for the costs of trenching, backfilling, conduit and other costs as may be outlined in individual development agreements in order to provide electric service for an electrical project. 7.12.025.4 The General Manager shall develop operational methods for staff use to implement the intent of this policy which shall be effective as of the date of adoption. (Electric Rule 9, Res. 8617, Res 9503) Proposed additional policy: 7.12.025.5 The facilities fees for electrical panel upgrades (residential or commercial) will be calculated by taking the difference between the new and existing panel size in amps and multiplying it by the current dollar per amp rate for facilities fees. The residential panel upgrades will be calculated at the full panel rating. Below is an example of the possible residential electric panel upgrades available for calculating the electric facilities fee. Assume a fee of $6/amp for the existing facilities fee. Below are the possible residential single-phase 120/240-volt electric panel upgrades available for residential panel upgrades up to 200 amps. New Panel Size Amps Existing Panel Size Amps Elec. Facilities fee 200 1 100 $600,00 200 60 $840.00 EEE100 60 $240.00 400 200 $1200.00