Loading...
HomeMy WebLinkAbout10 Donner Lake Pipelines Project Agenda Item # to Memorandum To: Board of Directors From: Peter Holzmeister Date: September 12, 2003 Subject: Donner Lake Tract Pipelines Project I. WHY THIS MATTER IS BEFORE THE BOARD The Donner Lake Tract Pipelines Project is complete. It is time for the board to consider a closeout change order and a resolution accepting the project. 2. HISTORY The purpose of this project was installation of approximately 5,000 feet of water pipelines in the area to improve water service for the first time. The installation of fire hydrants and service connections were also included in this project. 3. NEW INFORMATION Attached for your review are the change order and resolution. 4. RECOMMENDATION a) Consideration of contract change order Number 2 to the Donner Lake Tract Pipelines Project b) Consideration of a resolution accepting the Donner Lake Tract Pipelines Project as complete and authorizing the filing of the notice of completion. i F Y E 2 F Z Y TDPUD MEMORANDUM September 11, 2003 TO: Board of Directors FROM: Neil Kaufman, Water System Engineer SUBJECT: DONNER LAKE TRACT PIPELINES CHANGE ORDER #2 AGENDA # BACKGROUND: The Board of Directors previously awarded the Contract for construction of the DONNER LAKE TRACT PIPELINES project to Herbert Suter Construction. The project was completed on September 11, 2003. In August, the Board approved Change Order No. 1 for this project. I am requesting a Change Order to the Contract for issues covered under seven general items that will cover all of the outstanding issues on this project. Item 1: The contract was based on a unit price bid. The attached table shows the differences between bid totals and the amounts actually constructed. This analysis results in a $14,988 credit to the District. Item 2: The Contract contains a rock excavation clause whereby the Contractor is due additional compensation for performing rock excavation. The Contractor performed some additional rock excavation during construction of the services and is due $827.00. Item 3: Under a USA call, TSD does not locate service laterals. During installation of the service laterals, four unmarked sewer laterals and one unmarked storm drain were encountered and required repair. The Contractor is due $1,116.91 for repair of these utilities. Item 4: During installation of one of the water services, the contractor encountered a French drain system. The existence of this French drain was unknown to all parties, including the property owner. It was necessary to purchase some drain rock to repair the system. The piping materials were paid for by the s District directly. The Contractor is due $275.00 for purchase and trucking of the drain rock. Item 5: During the construction, leaks occurred on the existing water system that f required repair. The Contractor is due $629.03 for labor and materials associated with these repairs. Page 1 Item 6: Based on discussions with the Homeowner's Association, it was agreed that the District would place asphalt grindings instead of the aggregate base specified for a final surfacing of the dirt roads. The asphalt grindings cost $4.00/ton more than the aggregate base. The initial estimate was that 250 tons of aggregate base would be required. An additional 40 tons of grindings was needed to properly surface the roads. The Contractor is due$1,000 for the cost difference between the asphalt and the aggregate base and an additional $1,144 for the purchase and trucking of the additional asphalt. Item 7: The owners of 14036 Robin Lane and 14044 Robin Lane have been in an ongoing dispute regarding the use of a common driveway that served both houses. The original property corner monuments had been disturbed and removed at some point in the past. Based on initial discussions with the owners, a consensus was reached regarding the proper location of the meter boxes for both houses. After installation of the boxes, the owners of 14036 Robin Lane hired Sage Land Surveying to re-establish the corner monuments. The survey revealed that the actual corner was about 10 feet west of the location agreed at by consensus. It was then necessary to relocate the meter boxes due to the unwillingness to the two parties to let the boxes remain at the installed location. I was able to convince them that the underground water piping did not need to be relocated. The Contractor is due$1,889.67 for the relocating these two boxes. RECOMMENDATION: I recommend that the Board authorize Contract Change Order #2, in the amount of a $8,106.39 credit to the District from Herbert Suter Construction. Attachment-Contract Change Order #2 1 } 5 2 f Page 2 L i . 'K' ' ; ; Change Order istrict Contract Name: DONNER LAKE TRACT PIPELINES Contract Change Order No: 2 Ong. Contract Amt. $ 413,075.00 Days NA Date: September 11 2003 Prev. Apprd Changes$ 42,908.23 Days NA Contractor: Herbert Suter Construction This Change$ - 8,106.39 Days NA Revised Contract Amt. $ 447,876.84 Days NA This Change Order covers changes to the subject Contract as described herein. The Contractor shall construct, furnish equipment and materials, and perform all work as necessary or required to complete the Change Order Items for a lump sum price agreed upon between the Contractor and District. Increase in (Decrease) Contract Time Description of Changes Contract in Contract Extension Amount $ Amount $ da s 1) Bid vs.Actual Quantities $14,988.00 NA 2) Rock Excavation $827.00 NA 3) Repair of Unmarked Utilities $1,116.91 NA. 4) Drain Rock for French Drain $275 00 NA 5) Repair of Water Leaks $629.03 NA 6) Asphalt Grindings $2,144.00 NA 7) Relocate Meter Boxes at 14036 and 14044 Robin Lane $1,889.67 NA E ls $6,881.61 $14,988A0 hange in contract amount(increase or decrease) $8,106.39 The amount of the Contract will be decreased by the sum of $8,106.39 and the Contract Time shall not be extended. The undersigned Contractor approves the foregoing Change Order as to the changes, if any, in the contract price specified for each item including any and all supervision costs and other miscellaneous costs relating to the change in work, and as to the extension of time allowed, if any, for completion of the entire work on account of said Change Order. The Contractor agrees to furnish all labor and materials and perform all other necessary work, inclusive of the directly or indirectly related to the approved time extension, required to complete the Change order items. This document will become a supplement of the contract and all provisions will apply hereto. It is understood that the Change Order shall be effective when approved by the District. Accepted: � 'y /Contractor Date: �J (Signature) Approved: /District Date: (Signature) j i Analysis of Bid Quantities vs. Actual Quantities Constructed Donner Lake Tract Pipelines Contractor: Herb Suter Construction Bid Item Description Bid Amounts Actual Amounts 1 Mobilization Quantit Units Unit Price Subtotal Quantit Units Unit Price 1 LS $ 20,000.00 Subtotal 2 12"Water Main with 2"Gas Pipe $ 20,OD0.00 1 LS $ 20,000.00 $ 20,000.00 3 12"Water Main without Gas Pipe 1,090 FT $ 90.00 $ 98,100.00 1,171 FT $ 90.00 $ 105,390.00 4 8"Water Main with 2"Gas Pipe 90 FT $ 90.00 $ 8,100.00 66 FT $ 90.00 $ 5,940.00 5 4"Water Main with 2"Gas Pipe 280 FT $ 83.00 $ 23,240.00 311 FT $ 83.00 $ 25,813.00 6 2"PE Water Service Lateral with 1"Gas Pipe 290 FT $ 52.00 $ 43,160.00 789 FT $ 52.00 $ 41,028.00 7 1.5"PE Water Service Lateral with 1"Gas Pipe 200 $ 45.00 $ 13,050.00 162 FT $ 45.00 $ 7,290.00 8 1.5"PE Water Service Lateral without Gas Pipe 75 �, $ 44.00 $ 81800.00 754 FT $ 44.00 $ 33,176.00 9 1"PE Water Service Lateral with 1"Gas Pipe 1,300 FT $ 43.00 $ 3,225.00 257 FT $ 43.00 $ 11,051.00 9A Two 1"PE Water Service Laterals with 1"Gas Pie $ 42.00 $ 54,600.00 657 FT $ 42.00 $ 27,594.00 10 1"PE Water Service Lateral without Gas Pipe p 750 FT $ 43.00 $ - 127 FT $ 43.00 $ 5,461.00 10A Two 1"PE Water Service Lateral without Gas Pipe 0 FT $ 40.00 $ 30,000.00 100 FT $ 40.00 $ 4,000.00 11 1"Gas Pipe(No Water) $ 41.00 $ - 16 FT $ 41.00 $ 656,00 12 Double Water Service Assembly for Traffic Areas 500 FT $ 40.00 $ 20,000.00 0 FT $ 40.00 $ 13 Double Water Service Assembly for Non-Traffic Areas 2 EA $ 2,400.00 $ 16,800.00 0 EA $ 2,400.00 $ _ 14 Single Water Service Assembly for Traffic Areas EA $ 2,000m $ 4,000.00 5 EA $ 2,000,00 $ 10,000.00 15 Single Water Service Assembly for Non-Traffic Areas 6 EA $ 1,600.00 $ 29,600.00 2 EA $ 1,600.00 $ 3,600.00 16 12"Butterfly Valve Assembly 6 EA $ 3,000.00 $ 6,000.00 23 EA $ 3,000.00 $ 36,000.00 17 8"Gate Valve Assembly 2 EA $ 3,850.00 $ 1,700.00 2 EA $ 3,850.00 $ 1,700.00 18 4"Gate Valve Assembly 2 EA $ 500.00 $ 1,000.00 2 EA $ 500.00 $ 1,000.00 19 2"Gate Valve Assembly 2 EA $ 500.00 $ 1,000.00 2 EA $ 500.00 $ 1,000.00 20 Fire Hydrant Assembly i EA $ 500.00 $ 500.00 1 EA $ 500.00 $ 500.00 21 Connection to Existing 6"Pipe at Donner Pass Road 4 EA $ 4,000.00 $ 14,000.00 4 EA $ 3,500.00 $ 14,000.00 22 AC Pavement 1 LS $ 4,000.00 $ 4,000.00 1 LS $ 4,000.00 $ 4,000.00 23 Revegetation 600 SO FT $ 8.00 $ 4,800.00 3,574 SO FT $ 8.00 $ 28,588.00 24 All Other Work Re wired bli the Contract Documents 1,000 SO FT $ 1.00 $ 1,000.00 500 SO FT $ 1.00 $ 500.00 1 LS $ 4,000.00 $ 4,000.00 1 LS $ 4,000.00 $ 4,000.00 $ 4/3,075.00 $ 398,087.00 Amount Owed to District: $ 14,988,00 FINIA& W Resolution No . 2003 - XX AUTHORIZING THE ACCEPTANCE OF THE DONNER LAKE TRACT PIPELINES AND DIRECTING FILING OF THE NOTICE OF COMPLETION WHEREAS, the Board of Directors of the Truckee Donner Public Utility District made the determination to undertake the Donner Lake Tract Pipelines Project; and WHEREAS, Herbert Suter Construction, was selected by the District to perform the work; and WHEREAS,the District's Water Systems Engineer, Neil Kaufman, has recommended that the work be accepted by the District; NOW THEREFORE BE IT RESOLVED by the Board of Directors of the District as follows: 1. That the District hereby accepts the Donner Lake Tract Pipelines Project as complete. 2. That the Clerk of the District be directed to file with the County of Nevada the Notice of Completion, a copy of which is attached hereto. 3. That 35 days following the filing of the Notice of Completion, the 10% retained from the contractor payments be released to the contractor if no claims have been made to the District by material suppliers or laborers. PASSED AND ADOPTED by the Board of Directors at a meeting duly called and held within the District on the 17`" day of September 2003 by the following roll call vote: AYES: NOES: ABSENT: TRUCKEE DONNER PUBLIC UTILITY DISTRICT By J. Ron Hemig, President of the Board ATTEST: Peter L. Holzmeister, Clerk of the Board bhc F : t RECORDING REQUESTED BY: Truckee Donner Public Utility District WHEN RECORDED, RETURN TO: TRVCKEEDONNER PUBLIC UTILITY DISTRICT � Post Office Box 309 � Truckee, CA9O10O ' NOTICE OFCOMPLETION NOTICE |S HEREBY GIVEN: 1. That the name and address uf the public entkvfor vvhon� the inoprovnmoeo1pro�y1w�Sdo tAevnO|, ieiheTruckeeC/onwerPob&c 1itiiitn [��'t��c� PoSt0��Ce8n 30� T �'-- 8�' as owner ~ District, x , ruckee. CA06180. 2. That on September 17. 2003. the hereinafter described improvements were aCueo1ed 8o t |�g pursuant[uareno|uUnnnf the Truckee Donner Public Uh|ityDistrict, the 8vvardingauthority, »rnp * 3. That the subject improvements of the Notice are generally described and identified as foll Donner Lake Tract Pipelines Project, Truckea, Ca. »wo: 4. That the name and address nf the contractor for such pKVoC[woSHer�eriSute� ��ons�ructimm 7116 nvi nmstarQMVe` Reno, m`� D9523. � � ' | certify under penalty of perjury under the laws of the State o( Dated: California that the h/reOoingiokuo and voxe'X � TRU(�KEED0NNERPUBL|(� UTILITY DISTRICT By / �