Loading...
HomeMy WebLinkAbout7 Adoption 2004 Budget Agenda Item # 7 �}I„1, .; _ DONNER Utility Memorandum To: Board of Directors From: Peter Holzmeister Date: December 12, 2003 Subject: Adoption of the budget for 2004 Why this matter is before the board: This item involves adoption of the budget for 2004, along with the budget overheads. Only the board of directors is authorized to adopt the budget. History : We began preparation of the budget in September with the Strategic Planning Workshop facilitated by Bob and Martin Rauch. Based on the results of that workshop, and with assistance from the management staff of the District, a draft budget for 2004 was prepared and submitted to the board for review. In a board workshop on November 25, 2003, 1 prepared a comparison of actual expenses versus 2004 budget; strategic plan projects; analysis of electric and water reserve goals; recap of both electric and water facilities fees and 2004 budget projects; recap of both electric and water current and proposed rates; recap of electric and water current and proposed connection charges; and electric current and proposed facilities fees. New information: We will hold a public hearing on December 17, 2003. At the conclusion of the hearing, you will be in a position to adopt the 2004 budget. Recommendation: I recommend that the board adopt the resolution adopting the budget for 2004. °� w NullCKE DO Public Utility istrict Resolution No . 2003- XX ADOPTING THE BUDGET AND OVERHEAD RATES FOR 2004 WHEREAS the Board of Directors and staff of the District participated in a strategic plan workshop in September of 2003 to identify priority issues to be addressed by the District during 2004 and to initiate budget preparation; and WHEREAS District staff has prepared a draft budget for District operations and capital spending forthe year 2004 taking into account the strategic plan issues; and WHEREAS the Board of Directors of the District has participated in a budget workshop and has conducted a public hearing on the draft budget; and NOW THEREFORE BE IT RESOLVED by the Board of Directors of Truckee Donner Public Utility District as follows: 1. The draft budget for 2004 is hereby adopted 2. The following budget overhead rates are adopted Overhead Item Overhead Rate Labor Overhead 96.67% Transportation Overhead 26.25% Inventory Overhead 22.32% Administrative Overhead 1.67% Construction Overhead 56.47% Non-inventory Material Overhead 25.00% PASSED AND ADOPTED by the Board of Directors at a meeting duly called and held within the District on the seventeenth of December 2003 by the following roll call vote: AYES: ABSTAIN: NOES: ABSENT: TRUCKEE DONNER PUBLIC UTILITY DISTRICT By James A. Maass, President ATTEST: Peter L. Hoizmeister, Clerk of the Board