HomeMy WebLinkAbout6 Donner Lake Tank 6323 Completion Agenda Item # 6 + i W i . i I * blic Utility D jri ctJ I � Memorandum To: Board of Directors From: Neil Kaufman Date: December 21, 2005 Subject: Final Completion for the Donner Lake 6323 Tank Project 1. Why this matter is before the board: The Donner Lake 6323 Tank project is complete. A resolution accepting the project requires Board approval. 2. History: The Board previously awarded the Donner Lake 6323 Tank project to Crosno Construction. No contract change orders have been brought to the Board for approval. A separate contract entitled Donner Lake Tank Earthwork and Piping for the tank site grading and piping was awarded to Suter Construction. That project was accepted for final completion by the Board on November 2, 2005. 3. New information: The contractor was required to construct the tank and coat the interior by December 30 2005, and was required to coat the exterior by June 20, 2006. Due to the light snow load this winter, the contractor was able to complete the interior and exterior coating ahead of schedule. On December 8, 2005, District staff performed a final walkthrough of the project and found no punch list issues needing to be addressed. We expect to put the tank into service in January after the Electric Department installs power and communications to the site. There are no change order issues associated with this project 4. Recommendation: I recommend that the Board pass a Resolution accepting the Donner Lake 6323 Tank project as complete and authorizing the filing of the Notice of Completion. s Page 1 7g r DONNER p_ 4 Public b District Resolution No. 2005 - XX AUTHORIZING THE ACCEPTANCE OF DONNER LAKE 6323 TANK PROJECT AND DIRECTING FILING OF THE NOTICE OF COMPLETION WHEREAS, the Board of Directors of the Truckee Donner Public Utility District made the determination to undertake the Donner Lake 6323 Tank Project; and WHEREAS, Crosno Construction Inc. was selected by the District to perform the work; and WHEREAS, Crosno Construction Inc. has completed all of the Work included in the Project; and WHEREAS, The District's Engineer, Neil Kaufman, now certifies the completion of the project; and WHEREAS,the District's Water Utility Manager, Ed Taylor, has recommended that the work be accepted by the District; NOW THEREFORE BE IT RESOLVED by the Board of Directors of the District as follows: 1. That the District hereby accepts the Donner Lake 6323 Tank Project as complete. 2. That the Clerk of the District be directed to file with the County of Nevada the Notice of Completion, a copy of which is attached hereto. 1 That 35 days following the filing of the Notice of Completion, the monies retained from the contractor payments be released to the contractor if no claims have been made to the District by material suppliers or laborers. PASSED AND ADOPTED by the Board of Directors at a meeting duly called and held within the District on the 21st day of December 2005 by the following roll call vote: AYES: NOES: ABSTAIN: ABSENT: TRUCKEE DONNER PUBLIC UTILITY DISTRICT By J. Ron Hemig, President of the Board ATTEST: Peter L. Holzmeister, Clerk of the Board RECORDING REQUESTED BY: Truckee Donner Public Utility District WHEN RECORDED, RETURN TO: TRUCKEE DONNER PUBLIC UTILITY DISTRICT Post Office Box 309 Truckee, CA 96160 THE UNDERSIGNED DECLARES DOCUMENTARY TRANSFER TAX-NONE NOTICE OF COMPLETION NOTICE IS HEREBY GIVEN: 1. That the name and address of the public entity for whom the improvement project was done, as owner thereof, is the Truckee Donner Public Utility District, Post Office Box 309, Truckee, CA 96160. 2. Nature of interest or estate of owner: beneficial interest of a public utility easement for installation of water facilities. 3. That on December 215', 2005 the hereinafter described improvements were accepted as complete pursuant to Resolution 2005-XX of the Truckee Donner Public Utility District, the awarding authority. 4. That the subject improvements of the Notice are generally described and identified as follows: One 300,000 gallon water storage tank and appurtenances, tank foundation, tank under drain system, and ancillary items such as pipe, fittings, locator wire, marking tape and other appurtenances. 5. That the name and address of the contractor for such project was: Crosno Construction Inc., 980 Ambrosia Lane, San Luis Obispo, CA 93401, 1 certify under penalty of perjury under the laws of the State of California that the foregoing is true and correct. Dated: TRUCKEE DONNER PUBLIC UTILITY DISTRICT By Peter L. Holzmeister, General Manager MAIL TAX STATEMENTS TO: SAME AS ABOVE Legal References: CC-3093,CCP-2003 (oath), 2015.5 (unsworn statement)