Loading...
HomeMy WebLinkAbout5 Corporation Yard Survey Agenda Item # � ct , iE a DONNER iiN� ' � ' y ..trict Memorandum To: Board of Directors From: Peter Holzmeister Date: October 14, 2005 Subject: Andregg proposal for survey work at Corporation Yard Why this matter is before the Board: This matter concerns authorizing a consultant to perform surrey work at the Site of the proposed new District Corporation Yard. This matter requires Board action. History: We have talked several times about development of a new Corporation yard and the acquisition of property from the Steele Family Trust. I will not spent time on it again here. It has been our plan to reconfigure the original three parcels into two parcels so we can build the Corporation Yard on one parcel and sell the other parcel to generate funds for construction of the Yard. Two meetings ago we presented for Board consideration and possible action a proposal from Andregg Geomatics to perform five survey tasks. Various questions were raised that needed further information before full action could be taken. The Board approved two of the five proposed tasks and asked that we have a workshop to discuss in greater detail the proposed reconfiguration of the three parcels. That workshop discussion occurred at the last Board meeting. New information: There really I no new information, as such. Attached is the original Andregg proposal, tasks one and two having already been approved by the Board. Tasks three, four and five are also needed to move forward with changing lines Recommendation: I recommend that the Board approve tasks three, four and five of the Andregg proposal dated August 30, 2005. tl l% A c E C>M^-FMCS Ms. Kathy Neus August 30, 2005 Truckee Donner Public Utility District P.O. Box 309 Phone: 530-582-3922 Truckee, CA 96160 Fax: 530-587-5056 Re: APN 19-400-13, 19-420-37 & -38 TDPUD Euer Valley Road Project Sec. 10, TI7N, R16E, MDM Town of Truckee, Nevada County, CA Dear Kathy; This letter is our proposal and contract to provide survey and mapping services for your Euer Valley Road project. Our proposed scope of work and fees are as follows: Task 1 —Aerial Mapping and Boundary Survey Set and survey aerial targets, obtain suitable stereo aerial photography, prepare photogrammetric mapping at a scale of I"=100* with 5 foot contours on Town of Truckee datum. Field and office work to locate the record parcel boundaries and overlay onto the mapping. Field and office work to locate sufficient record monuments to establish record parcel boundaries. Overlay boundary and plot easements as given in the Preliminary Title Report furnished by client. Fee: $16,320.00 Task 2 — Ortho Photography Provide fully ortho-rectified color digital aerial photography overlaid with full planimetrics, contours and boundary obtained in Task I above. Fee: $850.00 Deliverables shall be in hardcopy and digital format in AutoCAD standard drawing files in model space rather than paper space, with no XREF. Digital Terrain Model, (DTM) or Triangulated Irregular Network(TIN) surfaces, fault, break and boundary lines shall NOT be provided or generated. Unless otherwise provided for in tabular and digital format (as an AutoCAD template file), layering, blocks, point codes, line types, text fonts and other drawing standards shall follow the ANDREGG GEOMATICS standard AutoCAD format which includes separate layers for points, text, contours, boundaries and other improvements as project appropriate. Task 3 —Minor Boundary Line Adjustment Based on the parcel boundary obtained in Task 1 above, calculate new parcel Page 1 of alignments, prepare applications, plats and descriptions for boundary line adjustment and submit to the Town of Truckee for approval.Note: No property corners will be set as a result of this scope of work. Fee: $2450.00 Task 4—Record of Survey Set corners as determined by Task 2 above. Prepare Record of Survey plat and submit to the Nevada County Surveyor for review and recording. Fee: $4500.00 The above scope of work does not include County, Town or title company fees. Task 5 - Easements Prepare plats and descriptions for two access easements to the newly configured parcels. Easement alignment to be provided by others. Fee: $1600.00 The above fees shall not be exceeded without prior authorization from client and shall remain valid for 60 days. Our current schedule would enable us to begin work at your direction and complete our initial mapping within twenty-five working days, weather permitting, of your notice to proceed. If you would like us to proceed, please sign and return one copy of this letter agreeing to the scope of work, the fee, and the "Standard Provisions of Agreement Between Client and Consultant" attached hereto. Thank you for this opportunity. If you have any questions or need additional information, please don't hesitate to call. Sincerely, ANDREGG GrEOMATICS , t , Christine`16hnson.PLS Auburn, CA Authorization to Proceed Date W .Mark-oingproposals 2005iP05-0695 CMJ 1 DPOD Euer 6'allo inurpping propasal.doc Page 2 of 2