Loading...
HomeMy WebLinkAbout9 Pavement Restoration Donner Lake ................. ....... Agenda Item # Memorandum To: Board of Directors From: Neil Kaufman Date: August 30, 2005 Subject: Pavement Restoration at Donner Lake 1. Why this matter is before the board: Board authorization is required for expenditures in excess of$15,000. 2. History: In 2001, the District conducted a joint project with Southwest Gas that installed water and natural gas pipelines along Southshore Drive, Red Mountain Road, Mt. Judah Drive and Devil's Peak Road on the south side of Donner Lake. These roads had been resurfaced in 1999. Based upon an arrangement with between Southwest Gas and the Town, the encroachment permit issued by the Town did not require that the roadways be repaved. However, the encroachment permit issued by Placer County did require a pavement overlay for Devil's Peak Road, Mt. Judah Drive and the Placer County portion of Red Mountain Road. This pavement restoration work was not included in the contract with Manuel Brothers and has not been performed. In 2004, the Town of Truckee issued an encroachment permit for the Donner Lake Pipelines—2004 project. This encroachment permit required the District to mill, and replace the pavement in the eastbound lane of Cedar Point Drive where the water pipeline was installed. This pavement restoration work was not included in the contract with Jurin Construction and has not been performed. These areas to be paved are shown on Figure 1. 3. New information: Earlier this Summer, the Town opened Bids for a paving project that included milling and repaving of Southshore Drive. Three bids were received (Advanced Asphalt, Granite Construction and SNC) and the Town awarded the contract to Advanced Asphalt. This paving work will start after Labor Day. I have had a number of conversations with both the Town and Advanced Asphalt regarding the District need to perform some paving work at Donner Lake. Both parties are willing to include the District's paving work into the Town's contract with Advanced Asphalt as a change order. The price being paid by the Town works out to around $0.81 per ton of placed AC. The total estimated cost to the District would be around $100,000. This arrangement would result in savings to the District in two forms, as opposed to bidding the work separately: • The District would not have to pay for mobilization since Advanced Asphalt is already going to be in the area. a • The Town's paving project is larger than the District's needs and the District can take advantage of this economy of scale in the Town's Bid Prices. 4. Recommendation: The Board of Directors authorize staff to arrange for this paving work to the performed through the existing contract between the Town of Truckee and Advanced Asphalt. Attachments: Figure 1 i CEDAR POINT DRIVE (DISTRICT) SOUTHSHORE DRIVE (TOWN OF TRUCKEE) - RED MOUNTAIN ROAD(DISTRICT), DEVILS PEAK ROAD MT.JUDAH DRIVE (DISTRICT) (DISTRICT) TRUCKEE DONNER �Lake Public Utility Distr ct Donaving