Memorandum
To: Board of Directors
From: Neil Kaufman
Date: August 12, 2005
Subject: Bid Award for the Donner Lake Tank Earthwork& Piping Contract
1. Why this matter is before the board:
Board Authorization is required to award a contract for construction
2. History:
The Board previously authorized staff to advertise for construction of the Donner Lake Tank
Earthwork & Piping contract. The purpose of this project is to continue the District's ongoing
efforts of rehabilitation and reconstruction of the Donner Lake Water System.
For bidding and construction purposes, the Donner Lake Road Tank project was separated into
two separate construction contracts. The first contract is entitled Donner Lake Tank
Earthwork and Piping and covers performing the excavation and grading associated with the
storage tank and access road. This contract also includes construction of the tank site piping
along with inlet/outlet pipeline and conduits that will provide service to the site. The second
contract is entitled Donner Lake 6323 Tank and covers construction of the tank itself.
3. New information:
On August 11, Bids were received and opened for this contract. Staff has totaled and reviewed all
bids. One Addendum was issued for this contract covering correction of a typographic error in the
Bid Forms.
A summary of the Bids is given below:
Bidder Location Amount
Suter Construction Reno, NV $339,930.00
Longo Construction AI ine Meadows, CA $387,718.50
The planned funding source for this project is the Donner Lake Assessment District.
4. Recommendation:
1) The Board of Directors award the Donner Lake Tank Earthwork& Piping project to
Suter Construction, in the amount of$339,930.00,
2) The Board of Directors authorize the transfer of $339,930.00 from the Surplus Land
Sales Trust Fund to the Water General Fund with the intention that the Surplus Land
Sales Trust Fund will be repaid upon the resolution of funding issues associated with
the Donner Lake Assessment District.
Attachments:
Bid Summary Table
DONNER LAKE TANK EARTHWORK & PIPING
BID TABULATION
BIDS OPENED AT 2:00 PM ON THURSDAY, AUGUST 11, 2005
Suter Construction Longo Construction
Bid Item Description Quantity Units Unit Price Subtotal Unit Price Subtotal
1 Mobilization 1 LS $ 15,000.00 $ 15,000.00 $ 35,500.00 $ 35,500.00
2 Access Road Grading 1 LS $ 87,000.00 $ 87,000.00 $ 73,250.00 $ 73,250.00
3 Tank Site Grading 1 LS $ 30,000.00 $ 30,000.00 $ 81,700.00 $ 81,700.00
4 Tank Site Water Piping 1 LS $ 24,000.00 $ 24,000.00 $ 72,600.00 $ 72,600.00
5 Tank Site Conduit and Electrical Pads 1 LS $ 25,000.00 $ 25,000.00 $ 17,850.00 $ 17,850.00
6 Tank Site Drainage Piping and Rock Lined Ditch 1 LS $ 48,000.00 $ 48,000.00 $ 21,650.00 $ 21,650.00
7 Offsite 12"DI Water Pipe,4"Conduit&2"Conduit, Station 0+00 to 0+98 98 LF $ 150.00 $ 14,700.00 $ 132.00 $ 12,936.00
8 Offsite 12"DI Water Pipe, Station 0+98 to 4+18.41 321 LF $ 150.00 $ 48,150.00 $ 92.00 $ 29,532.00
9 Joint Conduit Trench at Station 0+98 Offset Right 21 LF $ 500.00 $ 10,500.00 $ 85,00 $ 1,785.00
10 Communication Pull Box and Pole Riser at Station 0+98 Offset Right 1 LS $ 3,000.00 $ 3,000.00 $ 5,575.00 $ 5,575.00
11 Connection to Existing 12"Gate Valve at Station 4+18.41 1 LS $ 4,000.00 $ 4,000.00 $ 6,225.00 $ 6,225.00
12 Access Road Paving 1,930 SQ. FT. $ 6.00 $ 11,580.00 $ 8.35 $ 16,115.50
13 Donner Lake Road Pavement Restoration 200 SQ. FT. $ 20.00 $ 4,000.00 $ 12.50 $ 2,500.00
14 All Other Work Required by the Contract Documents 1 LS 1 $ 15,000.001 $ 15,000.001 $ 10,500.001 $ 10,500.00
Total $ 339,930.00 $ 387,718.50
License Detail Page 1 of 2
California Horne t"aersday.August i1. _,005
Sri£' tO
License Detail CALIFORNIA CONTRACTORS STATE LICENSE BOARD
Contractor License # 625598
DISCLAIMER
A license status check provides information taken from the CSLB license data base. Before relying
on this information, you should be aware of the following limitations:
. CSLB complaint disclosure is restricted by law (B&P 7124.6). If this entity is subject to public
complaint disclosure, a link for complaint disclosure will appear below. Click on the link or
button to obtain complaint and/or legal action information.
. Per B&P 7071.17, only construction related civil judgments reported to the CSLB are
disclosed.
. Arbitrations are not listed unless the contractor fails to comply with the terms of the arbitration.
. Due to workload, there may be relevant information that has not yet been entered onto the
Board's license data base.
Extract Date: 08/11/2005
* * * Business Information
HERBERT SUTER CONST
7116 WINDSTAR DRIVE
RENO, NV 89523
Business Phone Number: (775) 746-1166
Entity: Sole Ownership
Issue Date: 08/19/1991 Expire Date: 02/28/2007
* * * License Status * * *
This license is current and active. All information below should be reviewed.
* * * Classifications
Class Description
GENERAL ENGINEERING CONTRACTOR
* * * Bonding Information * * *
CONTRACTOR'S BOND: This license filed Contractor's Bond number 163738 in the amount of
$10,000 with the bonding company
AMERICAN CONTRACTORS INDEMNITY COMPANY.
Effective Date: 01/01/2004
Contractor's Bonding History
http://www2.cslb.ca.gov/CSLB_LIBRARY/License+Detail.asp 8/11/2005
Page 2 of 2
License Detail
* * * Workers Compensation Information
This license is exempt from having workers compensation insurance; they certified that they have no
employees at this time.
Effective Date: 02/07/1992 Expire Date: None
Personnel List
License Number Request Contractor Name Request Personnel Name Request
Salesperson.Request Salesperson Name Request
0 2005 State of California.Conditions of Use Privacy Poly
http://www2.cslb.ca.gov/CSLB_LIBRARY/License+Detail.asp 8/11/2005
Agenda Item # ,'
F
Memorandum
To: Board of Directors
From: Neil Kaufman
Date: August 12, 2005
Subject: Bid Award for the Donner Lake 6323 Tank Contract
1. Why this matter is before the board:
Board Authorization is required to award a contract for construction
2. History:
The Board previously authorized staff to advertise for construction of the Donner Lake 6323
Tank contract. The purpose of this project is to continue the District's ongoing efforts of
rehabilitation and reconstruction of the Donner Lake Water System.
For bidding and construction purposes, the Donner Lake Road Tank project was separated into
two separate construction contracts. The first contract is entitled Donner Lake Tank
Earthwork and Piping and covers performing the excavation and grading associated with the
storage tank and access road. This contract also includes construction of the tank site piping
along with inlet/outlet pipeline and conduits that will provide service to the site. The second
contract is entitled Donner Lake 6323 Tank and covers construction of the tank itself.
3. New information:
On August 11, Bids were received and opened for the Donner Lake 6323 Tank contract. Staff has
totaled and reviewed all bids. No addenda were issued for this contract.
A summary of the Bids is given below:
Bidder Location Amount
Crosno Construction San Luis Obis o, CA $287,200.00
Resource Development S arks, NV $329,900.00
The planned funding source for this project is the Donner Lake Assessment District.
4. Recommendation:
1) The Board of Directors award the Donner Lake 6323 Tank project to Crosno
Construction, in the amount of$287,200.00.
2) The Board of Directors authorize the transfer of $287,200.00 from the Surplus Land
Sales Trust Fund to the Water General Fund with the intention that the Surplus Land
Sales Trust Fund will be repaid upon the resolution of funding issues associated with
the Donner Lake Assessment District.
Attachments: Bid Summary Table
DONNER LAKE 6323 TANK
BID TABULATION
BIDS OPENED AT 2:30 PM ON THURSDAY, AUGUST 11, 2005
Crosno Construction Resource Development
Bid Item Description Quantity Units Unit Price Subtotal 70,nnnnon
ce Subtotal
1 Mobilization 1 LS $ 13,000.00 $ 13,000.00 .00 $ 14,000.00
2 Earthwork, Drains,and Tank Foundation 1 LS $ 49,400.00 $ 49,400.00 .00 $ 70,900.00
3 Fabrication and Installation of 300,000 gallon Tank and Appurtenances 1 LS $148,000.00 $ 148,000,000.00 $ 165,100.00
4 Application of Interior Protective Coatings and Disinfection of Tank and Piping 1 LS $ 33,400.00 $ 33,400,000.00 $ 44,000.00
5 Application of Exterior Protective Coatings 1 LS $ 16,400.00 $ 16,400,000.00 $ 20,900.00
6 All Other Work Required by the Contract Documents 1 LS $ 5,000.00 $ 5,000,000.00 $ 5,000.00
7 Additive Alternate-Environmental Controls 1 LS $ 22,000.00 $ 22,000.00 , 0.00 $ 10,000.00
Total $ 287,200.00 $ 329,900.00
License Detail Page 1 of 2
California H omL ?t,,rs,;s<. .he=•usi i, 2005
COe tO
m
'2s�... WNW
' a
License Detail CALIFORNIA CONTRACTORS STATE LICENSE BOARD
Contractor License # 835288
DISCLAIMER
t9nd/or
check provides information taken from the CSLB license data base. Before relying
on, you should be aware of the following limitations:
plaint disclosure is restricted by law (B&P 7124.6). If this entity is subject to public
disclosure, a link for complaint disclosure will appear below. Click on the link or
btain complaint and/or legal action information.
. Per B&P 7071.17, only construction related civil judgments reported to the CSLB are
disclosed.
. Arbitrations are not listed unless the contractor fails to comply with the terms of the arbitration.
. Due to workload, there may be relevant information that has not yet been entered onto the
Board's license data base.
Extract Date: 08/11/2005
* * * Business Information
CROSNO CONSTRUCTION INC
980 AMBROSIA
SAN LUIS OBISPO, CA 93401
Business Phone Number: (805) 541-3958
Entity: Corporation
Issue Date: 04/02/2004 Reissue Date: 06/28/2004 Expire Date: 06/30/2006
* * * License Status * * *
This license is current and active. All information below should be reviewed.
* * * Classifications
Class Description
��GENERAL ENGINEERING CONTRACTOR
* * * Bonding Information
CONTRACTOR'S BOND: This license filed Contractor's Bond number 6335258 in the amount of
$10,000 with the bonding company
SURETY COMPANY OF THE PACIFIC.
Effective Date: 06/2812004
Contractor's Bonding History
http:/lwww2.cslb.ca.gov/CSLB_LIBRARY/License+Detailasp 8/11/2005
Page 2 of 2
License Detail
BOND OF QUALIFYING INDIVIDUAL(1): The Responsible Managing Officer (RMO) WADE DANIEL
CROSNO certified that he/she owns 10 percent or more of the voting stock/equity of the corporation.
A bond of qualifying individual is not required.
Effective Date: 06/28/2004 t
* * * Workers Compensation Information
This license has workers compensation insurance with the
STATE COMPENSATION INSURANCE FUND
Policy Number: 1807065 Effective Date: 10/02/2004 Expire Date: 10/01/2005
Workers Compensation History
Personnel List
License Number Request Contractor Name Request Personnel Name Request
Salesperson.Request Salesperson..Name Request
2005 State of California Conditions of Use Privacy Polite
http://www2.cslb.ca.gov/CSLB_LIBRARY/License+DetaiLasp 8/11/2005