HomeMy WebLinkAbout4 Sierra meadows pump station CEQA Agenda Item #
Memorandum
To: Board of Directors
From: Peter Holzmeister
Date: April 29, 2005
Subject: Public hearing — Sierra Meadows Pump station CEQA
Why this matter is before the board: This matter is a public hearing scheduled by the
board of directors to receive public input regarding an Initial Environmental Study and
proposed Negative Declaration for construction of a new Sierra Meadows Pump Station.
History: This matter was discussed at the last board meeting. Construction of a new
water pump station in the Hilltop area to serve growth was identified in the water master
plan. The new pump station appeared in the Five-Year Plan of Capital Expenditures
adopted by the board in January, 2005 and funding was contained in the budget for
2005.
There is currently a pump station on Ponderosa Drive that is now inadequate to serve
the growth that has occurred in that area. The existing building is small and in poor
physical condition. The existing site is too small to permit construction of a new pump
station at that location. This proposed pump station replaces the existing Sierra
Meadows station and provides capacity to meet the demand for water resulting from
growth.
Ed Taylor has been working with Dale Creighton, representing JAR Hilltop, developers
of the Hilltop Master Plan project, and has secured a commitment of an irrevocable
easement for construction of this new pump station, provided the environmental review
of the site demonstrates that the site is appropriate.
The board authorized Inland Ecosystems to conduct the environmental review of the
site. An Initial Environmental Study and proposed Negative Declaration has been
prepared and circulated to the appropriate agencies. This public hearing was advertised
in compliance with law.
New information: At this point, the thirty day comment period is in progress. This
public hearing is part of the public comment process. There is no need to take action on
the documents at this time since the thirty- day comment period will not have been
completed.