1. WHY THIS MATTER IS BEFORE THE BOARD
Board authorization is required for all contracts.
2. HISTORY
As a part of the Donner Lake Rehabilitation Phase 3 project, the District is required to
construct facilities crossing environmentally sensitive areas. Staff has evaluated all
possible routing of facilities and has developed a plan to minimize the impact in these
areas. To mitigate the environmental impacts will require a small wetlands restoration
project at Greenpoint Springs.
3. NEW INFORMATION
The District has submitted the Clean Water Act Section 401 and the U.S. Army Core of
Engineers CWA Section 404 applications. Those applications identify the mitigation for
environmental impacts as the Wetland Restoration at Greenpoint Springs. Inland
Ecosystems submitted a proposal and cost estimate to conduct BMP and erosion control
monitoring and wetland restoration, including transplanting wetland plants, for the 2004
Donner Lake projects.
4. RECOMMENDATION
a) Staff recommends that the Board authorized the contract with Inland Ecosystems
in the amount of$21,116.00 for construction monitoring and proposed three (3)
year wetland restoration monitoring at Greenpoint Springs.
INLAND ECOSYSTEMS
1135 Terminal Way, Suite 204A
INLAND Reno, NV. 89502
Phone: (775) 786-3223 Fax: (775) 786-3229
ECOSYSTEMSEmail: gmecron ii tint rndcco t tcros.com
June 11, 2004
Mr. Edward Taylor
Truckee Donner Public Utility District
]1570 Donner Pass Road
Truckee, CA 96160
Subject: Scope of Work and Cost Estimate: 2004 Construction Monitoring and Proposed
three(3)year wetland restoration monitoring at Greenpoint Springs
Dear Mr. Taylor:
Inland Ecosystems is pleased to submit this proposal and cost estimate to conduct BMP
and erosion control monitoring and wetland restoration, including transplanting wetland
plants, for the 2004 Donner Lake projects. This proposal also includes a 3-year annual
wetland restoration monitoring program at Greenpoint Springs that will be a required
component of both the Clean Water Act (CWA) Section 404 permit issued by the U.S.
Army Corps of Engineers (USACOE) and CWA Section 401 Water Quality Certification
issued by the Lahontan Regional Water Quality Control Board(LRWQCB).
The following tasks are proposed:
Task 1 — Conduct BMP and erosion control monitoring and wetland restoration
according to regulatory guidelines for the 2004 construction season, with particular
emphasis on the Red Mountain and Greenpoint Springs wetland sites. The level of effort
associated with this task shall not exceed 175 work hours commencing June 15, 2004 and
ending October 15, 2004. Inland Ecosystems environmental staff associated with the
construction monitoring and restoration will include Carolyn Chainey-Davis, Cliff
Wilson, and Glenn Merron.
Task 2 - This proposal also includes a 3-year annual wetland restoration monitoring
program at Greenpoint Springs that will be a required component of both the CWA
Section 404 and 401 permit processes. Monitoring will occur each May from 2005
through to 2007. Annual reports on the success of the restoration would be submitted to
the District, USACOE, and LRWQCB on July 1 of each respective year. If success is not
being achieved according to the success criteria outlined in the permitting applications,
additional mitigation measures would be outlined. The level of effort associated with this
task over the 3-year restoration monitoring period shall not exceed 120 man hours
commencing May 1, 2005 and ending May 1, 2007. Inland Ecosystems environmental
staff associated with the construction monitoring and restoration will include Carolyn
Chainey-Davis, Cliff Wilson, and Glenn Merron.
Our goal is to ensure that the District is provided with an exceptionally high quality of
environmental documentation and coordination with the resource agencies for this
project.
Our cost estimate for the environmental services described above is $21,116. Table 1
provides a complete breakdown of all costs associated with Tasks 1 and 2. I have kept all
rates according to the 2004 IE rate schedule. The average cost per man hour is $69. There
will be no increase in cost across the 3-year period.
It has been a pleasure preparing this proposal for you. If you have any questions or
comments please feel free to call me at (775) 786-3223.
Sincerely,
<:A
Glenn S. Merron, Ph.D.
WORK AUTHORIZATION ORDER: Truckee Donner Public Utility District
June 11, 2004
Inland Ecosystems Job Number: 017
This Work Authorization Order confirms the agreement between Truckee Donner Public
Utility District ("Company") and Inland Ecosystems ("Contractor"), that Company is
engaging Contractor to provide certain services (the "Work," as further defined below),
and that Contractor will perform the Work, on the terms and conditions set forth below.
(i) Description of the Work, including Location
Inland Ecosystems (TE)will perform the following tasks:
Task I — Conduct BMP and erosion control monitoring and wetland restoration for the
2004 construction season, with particular emphasis on the Red Mountain and Greenpoint
Springs wetland sites. Inland staff will be on hand at the discretion of the District to
conduct periodic site visits throughout the course of the 2004 construction season. IE
staff will conduct specific BMP and erosion control monitoring prior to and immediately
after storm events. IE has assumed for the purpose of this proposal that 6 storm events
would be monitored. The level of effort associated with this task shall not exceed 175
work hours commencing June 15, 2004 and ending October 15, 2004. IE environmental
staff associated with the construction monitoring and restoration will include Carolyn
Cbainey-Davis, Cliff Wilson, and Glenn Merron.
Task 2- Conduct a 3-year annual wetland restoration monitoring program at Greenpoint
Springs that will be a required component of both the CWA Section 404 and 401 permit
processes. Monitoring will occur each May from 2005 through to 2007- Annual reports
on the success of the restoration would be submitted to the District, USACOE, and
LRWQCB on July 1 of each respective year. If success is not being achieved according
to the success criteria outlined in the permitting packages, additional mitigation measures
would be outlined. The level of effort associated with this task over the 3-year restoration
monitoring period shall not exceed 120 work hours commencing May 1, 2005 and ending
May 1, 2007_ Inland Ecosystems environmental staff associated with the construction
monitoring and restoration will include Carolyn Chainey-Davis, Cliff Wilson, and Glenn
Merron.
(ii) Schedule, Completion Date
Inland Ecosystems has prepared numerous technical reports and is committed to
maintaining our high quality reporting. For 2004, Inland Ecosystems will prepare a
"Wetlands Restoration Report" for the District to submit to the LRWQCB and the
USACOE. The report will be submitted to the District on December 1, 2004. For the
years 2005 through to 2007 Inland Ecosystems will submit annual reports on the success
of the restoration to the District, USACOE, and LRWQCB on July I of each respective
year.
(iii) Compensation, Invoicing and Payment:
a. Fee. The fee for Work performed by Contractor pursuant to this Work
Authorization Order shall be on a "Time and Materials" basis, Not-to-Exceed
$21,116.
b. Invoicing and Payment. Consultant shall submit to Company an invoice
within one month of completing the above described tasks. Payment is due as
per contractual agreement with the District.
(iv) Other:
Tasks, costs and schedules described herein are subject to unforeseen changes in scope
and schedule.
ACCEPTED:
Truckee Donner Public Utility District Inland EcasySt s f
By: By.
Title: Title: Principal
Date: Date: 6/11/04
TABLE 1:Estimated Costs:Truckee Donner Public Utility District,Donner Lake Project.
Estimate of hoop by task TOTAL
TASK TA.SIC2
Personnel:
G.Meson 24 38 62
C.Cheney-Davis 75 40 115
C.Wilson 75 40 115
Administration 1 2 3
TOTAL HOURS 175 120 295
295
RATE
G.M=on $88 $2,112 $3,344 $5,456
G Chaney-Davis $69 $5,175 $2,760 $7.935
C.Wilson $59 $4,425 $2,360 $6,785
Administration $40 S40 $80 $120
TOTAL COST $11,752 $815" $20,296
OTHER DIRECT COSTS TASK1 TASK2 TOTAL.
MILEAGE $0,35 $250 $300 $550
GIS/GRAPHICS $7.00 $25 $25 $50
COPIES $0.10 $25 $25 $50
FAX in $0.10 $10 $10 $20
FAX out $0,50 $5 $5 $10
Phone $15 $25 $40
Field Supplies $50 $50 $100
TOTAL $3 00 $440 $820
TOTAL COSTS $12132 $8984 $21,116
TASK 1 2004 RMP monitoring