Loading...
HomeMy WebLinkAbout2006-07-11 Agenda Packet - Board Truckee Danner Public Utility District SPECIAL MEETING 7:00 PM, Thursday, July 13, 2006 TDPUD Board Room AGENDA 1. Call to order 2. Roll call 3. Public input — This is time set aside for the public to address the Board on any matter not on the agenda. Testimony related to any agendized matter should be addressed at the time that item is considered. 4. Staff presentation regarding water system infrastructure needs, water fund financial position, and proposed rate increase and billing surcharge. 5. PUBLIC HEARINGS - At 7:00 PM or as soon thereafter as possible the following public hearings will be held for the purpose of receiving written and or oral comments from members of the public regarding: a) Adoption of an ordinance increasing the District's water rates. b) Adoption of an ordinance establishing a billing surcharge applicable to Donner Lake Customers ACTION ITEMS 6. Consideration of adopting water rate ordinance a) Staff report b) Public input c) Board discussion and action 7. Consideration of adopting Donner Lake surcharge ordinance a) Staff report b) Public input c) Board discussion and action 8. Consideration of retaining bond counsel to assist in issuance of water system Certificates of Participation. a) Staff report b) Public input c) Board discussion and action 9. Consideration of a proposal from McDonald partners to perform services related to issuance of water system Certificates of Participation. a) Staff report b) Public input c) Board discussion and action Trucf, t,C�.+ 'Ir lt;t! - @;2>r +')_4 ^- t8s)n '.ka •ft __.�,, CLOSED SESSION 10. Conference with legal counsel —existing litigation: Section 54956.9. A grievance filed by IBEW Local 1245 on behalf of Dennis Sanchez ADJOURNMENT Note regarding agenda topics likely to come before the board during the next three months: Review of the District policy prohibiting seasonal shut-off of water service Consideration of implementing a new after hours call service Consideration of actions related to the District's broadband business plan Consideration of plans for construction of a new District corporation yard Annual meeting of the TDPUD Financing Corporation Adoption of a Code of Business Ethics • Adoption of a District mission statement, goal and objectives • Adoption of a capitalization policy • Adoption of an investment policy Review of the District's finance master plan Discussion of a amending the water rate applicable to small dwelling units • Discussion of developing a low income water and electric rate • Discussion of updating the District's telephone system The agenda is available for review at the TDPUD office and the Truckee branch of the Nevada County Library Posted and mailed on July 7, 2006 Barbara Cahill, Deputy District Clerk A copy of the agenda packet is available for public review at the district administrative office:11570 Donner Pass Rd. Public participation is encouraged. The meeting location is accessible to people with disabilities. Every reasonable effort will be made to accommodate participation of the disabled in all of the District's public meetings. If particular accommodations for the disabled are needed (i.e., disability-related aids,or other services),please contract the Clerk of the Board at(530)582-3909,at least 24 hours in advance of the meeting. 3' €). i3e�x 's tt "d r t•t.re,i , rlis1t3r3— €'honv .3u- %'7- 8 0 r Public Hea ings Water System Infrastructure Needs Water Fund Financial Position Proposed Rate.Lncreases Staff Report July 6, 2006 Board Meeting 1 ! What we're going to talk about tonight • Two public hearings that relate • Water System Finances and System Facilities • We have been talking about this for a long time • We have been addressing bits and pieces of this for years. • Present "Big Picture" to our audience • Answer questions 2 I ;,Out of Mission Statement, Objectives were created • Provide an adequate, reliable and high quality water supply and distribution system to meet current and future needs. • Manage the District in an open manner. • Manage the District in a responsible manner. • Manage the District in an environmentally sound manner • Manage the District in an effective, efficient and fiscally responsible manner. 5 ;, Water System Current;Status • Water Utility Financial Status • Water System Facilities Status 6 3 - -------- a ,-Water Utility Financia�Status Restricted Fund Balances • Water Capital Fund $ 33,363 (this is from the 2%rate increase passed by the Board in Feb 2006) • Donner Lake Assessment District Fund $ 3,266,902 (this fund is NOT available for any purpose other than the DL assessment district) • Land Sales Trust Fund $ 117,373 (this fund has"lent"the Water o erations/Donner Lake Assessment District/Glenshire system $4.1 M� • Other water funds $ 984,289 (this includes the reserve for future meters, prepaid connection fees, lenshire loan repayment, the Prop 55 Loan Reserve,etc. These funds are generally not available for capital projects or day to day operations) 7 (Water Utility Cash Stziiius May 31, 2006 • General Fund $ (100,800) - (this is the "checkbook" to pay for payroll, supplies purchases, District insurance, etc. General industry and accounting standards suggest a recommended balance of approximately $3.21VI to $3.7M) • Facilities Fees Fund $ 2,676,904 8 4 Water Utility Cash Status - 12 mos. History of General Fund balances 200,000 — 1, 0 .200,000 s"a — 400,000 .SDo,o55 -- -1,000,000 --'j -1200,000 — —'-- 1 '1•466.006 1 1 P®q Jun. Jul- Aug- Sep. Oct- Nov- Dec- Jan- Feb- Mat- Apr- May. 05 05 05 05 05 05 05 06 06 06 06 06 Note: last SRF draw received in Feb 2006 Water Utility_FinanciakStatus Facilities Fees as of May 31 , 2006 • Facilities fees have been identified as a possible means to pay for the Brockway Transmission Pipeline project. Staff has suggested that this roiect be debt financed and the debt a meats made out of facilities tees. An alternative would be to pay for the projects fully with the current balance of facility fees. • Contracts approved by Board: Vulcan Construction (Brockway Transmission) $2,976,939 Available Fac Fees $2,6 66 904 • Shortfall ($ 300 035) _ • NOTE: The above shortfall can be paid through an inter-company of an from the Electric division in the short term, until a longer-term solution is crafted. The contractor payments will be made throughout the summer of 2006,with final payment anticipated in October 2006. Facilities Fees in June,July and August are anticipated to be approximately$225,000 per month. 10 5 - .......... _ ...._. ._...._._.,...._... .....__.. ,,,Water Utility F_inancial_Status General Fund (Rates) as of May 31, 2006 • General funds have been identified as a possible means to pay for the Pipeline replacement project for 2006(Tahoe Donner). Staff has suggested that this project be debt financed. An alternative would be to pay for the projects fully with the current balance of general fund cash. • Contracts approved by Board: Longo Construction (2006 pipeline replacment) $1,215,484 Available General Fund cash $ 10( 0 800) • Shortfall $(1,316,284) NOTE: The above shortfall can be paid through an inter- company loan from the Electric division in the short term, until a longer-term solution is crafted. The shortfall can be paid by using the funds budgeted for payment of the new COP. We would need to borrow from the Electric Fund temporarily and pay it back by the middle of 2007 Water System Facilities Status • Leaks: 180 per year &' i • Increasing number of leaks per year • Increased Maintenance cost to repair leaks • Increased Operational cost for pumping leaking water • Major pipeline replacement project needed in District • Leaks in areas other than Tahoe Donner • Aging system in older part of District needs scheduled replacement • Repair vs Replacement 12 6 ,> i ' �'a yi�r � }t �<� � � � �, 't" a "�o't ti N* „P <Y �` 4�aa��h��� ��k�"i , h a 3 ^.. 4 � hr Y t a 5. Y ! 94 y� � ti Y A���. � t` � t�>k � � ,� .j r� �,"\5 N hr j�iv. � ��„}��i�4 f rr � t � �� �� t � p� �� " � 4 � dJ \ xa�, f. .. .j. � B 4 �. 5 �� S $7} ,e `k � .� Y , f E'� Al � Y I y{' i �' � �, � � ) � q� y � 3 1 } �' � 4 f .w.� s � l I ',dY �' f � i � 4 { � #. s�� x, x � �, § s � ;�� x , $�� � u � rN`i�A�Yi p}a. �t �,. vy� e5't i ;Y�' Z t �Y I .1'� k��y�` l�: � t .. .. _ ................. _ _ i { Solutions • Status Quo • Pay as You Go (Board member suggestion) • Long/Short Term Financial Solution t ' 15 (,Status Quo • Allow current financial position to pay for current contracts. • Repair vs. Replace 16 8 Status Quo Pros &Cons • Pros: - No rate changes for reserves - No new debt • Cons: - Possible degradation of the water pipelines beyond where they are now - Increase in System Repairs and Maintenance - Increase in Pumping cost—Due to leaking water - No improvement in reserve funds - Additional damage to streets - Decrease in customer service levels - Possible rate increases for additional repair costs? 17 -j - Possible Health Department implications- ■ ,,__Pay as You Go (Board member suggestion) • Cash-finance each year's pipeline replacement projects with prior year rates • Estimate approximately $3M per year in projects • Would be equivalent of 40% rate increase or $20.00 per month and last for at least 4 years. • Rates would also need to be increased for any operating cost changes 18 9 -. _. _ --- _ . ... ...... .. ....._...... .. . . ........... .........._..._.. .. ..... ... .......... _. ._..... e -Pay as You Go s & Cons) (Board member suggestion) • Pros: - addresses priority#1 pipeline replacement projects - no new debt • Cons: - Large rate increases - No reserves accumulated - Current customers pay for facilities benefiting future customers. - Does not address priority#2 &#3 pipeline replacement projects - Does not address long-term system replacement 19 \,-Long/Short Term Financial Solutio • Issue COP's and raise water rates. Use COP funds as follows: - Refinance 1996 COP Debt $8,465,000 - 24" Brockway Transmission Pipeline 4,000,000 - District pipeline projects 2006-2010 12,300,000 - Generators 180,000 - SCADA system 400,000 - DL System: repay Land Sales Trust Fund 1,479,272 - $26,824,272 Note: the refinancing is to save interest on a current debt. The life of the debt will not be extended, and will 20 be fully paid in 2021. 10 ............. _ _.... Long/Short Term Financial Solution • Proposed rates increase (6% at Jan 1, 2007 and 6% at Jan 1, 2008) used as follows: - 3% toward building reserve funds to prudent levels - 3% toward increases in operating and maintenance costs • Rate increase on average residential water bill: $3.22 per month in 2007 and $3.42 per month in 2008 • Establish Donner Lake Surcharge $6.65/month 21 ' Ili` Y I III �'rTC��"" ,.Long/Short Term Financial Solution Now the COP'S will be repaid- • A Portion will be paid with - Facilities Fees on an annual basis. - Donner Lake Surcharge - Rates - Existing Payment funding for 1996 COP's 22 it _ __ ...,.... . . . _. ...... ..........__....... _..... . . . _...... . _ _ _ ..._ .. �oncg/Short Term F_ina_n¢ial Solution Pros x • Pros: • Addresses both short and long-term cash flow issues - Short Term • 2006-2010 pipeline replacement is achieved - Long Term • Refinance 1996 COP's to a lower interest rate • Repay portion of Land Sales Trust Fund, $1,479,272,to be used for its Board-stated purpose • Replenish and build reserve funds • Manage future finances in a efficient and fiscally responsible manner • Addresses the infrastructure weaknesses in the water plant • Saves interest costs on the 1996 debt • Meets Board-stated mission and objectives 23 Long/Short Term Financial Solution Cons - • Cons: - Rate increase of approximately $3.22 per month for each residential customer in 2007 and approximately $3.42 per month for each residential customer in 2008, for a total of$6.64 per month over the two year period. 24 12 What does the Water Utility want to Accomplish? • Establish Operating Reserves • Address Water system failures • Replenish internal borrowings • Replace vs. Repair (save money and provide better service) • Complete Donner Lake System Reconstruction Plan • Take advantage of the opportunity to refinance 25 existing debt. 13 .................... ..... . ........................... ....... ....... _ . ........ ... ............... _. ...,... Agenda Item # 5 a rt- Memorandum To: Board of Directors From: Peter Holzmeister Date: July 7, 2006 Subject: Water Rate Increase public hearing Why this matter is before the Board: This matter involves continuing the public hearing prior to adopting an ordinance increasing the District's water rates by Six percent in 2007 and 2008. The board conducts this hearing. History: We have been discussing this matter at Board meetings so I will not spend time here going over the details. Staff will be making a presentation at the meeting. New Information: A public hearing has been advertised in the Sierra Sun and on the District's website. Notices were posted in the Nevada County Library and the Post Office, as well as emailed to interested parties and associations for distribution within the groups. Notice of the continued public hearing was also announced on the local KTKE Truckee Radio Station over the three days prior to the special meeting on July 13, 2006. Staff prepared an initial FAQ sheet addressing this water rate increase. It was posted on the website and available to the public upon request. An additional FAQ sheet has been generated by staff from questions raised by the public at the July 5 public hearing. This FAQ sheet will be available on July 10 at the District Office or on the TDPUD web site (TDPUD.org). Recommendation: At the conclusion of the public hearing, I recommend that the Board adopt a water monthly retail rate ordinance Water Rate Increase Frequently Asked Questions Q: How much will the water rate increase? A: The proposal is to increase water rates by six percent each year for two years. Q: When will the increase occur? A: The first six percent increase would occur on January 1, 2007 and the second six percent increase would occur on January 1, 2008 Q: How much will the monthly water bill go up? A: The average TDPUD water customer would see a monthly increase of$3.22 on January 1, 2007 and an increase of$3.42 on January 1, 2008. Some customers would see an increase of a little less and some would see an increase of a little more. Q: Why is the rate increasing? A: TDPUD needs to replace older leaking water lines in various neighborhoods of Truckee. To pay for that work we are proposing to borrow money and repay the loan over thirty years. In order to borrow the money the investors need to see that the TDPUD water fund is in a sound financial position. Bankers need to see that our water rates are sufficient to sustain a reasonable cash reserve and cover increasing operating costs. The purpose of the rate increase is to do exactly that: establish a reasonable cash reserve and cover projected increases in operating costs. Q: How much cash does the TDPUD water fund have in unrestricted funds right now? A: We have no cash in unrestricted reserves right now. Q: Why is the TDPUD spending so much money on pipeline replacement? A: We are experiencing leaks in the pipeline system in various areas of the District. We are spending too much time and money performing temporary repairs on pipelines that need to be replaced. Repetitively performing temporary repairs to small sections of pipeline is more expensive than replacing the pipeline. Also, leaking water lines waste water that costs money to pump. Leaking water lines can cause road damage and can result in icy conditions on roads during cold weather. For all of these reasons we need to replace the leaking water lines. Q: Why is the TDPUD building a cash reserve? A: Prudent business practice requires that TDPUD maintain unrestricted cash reserves equal to approximately 170 days of operating expenses. The cash reserves are intended to provide a financial safety net. The cash reserve allows us to deal with unforeseen matters without impacting our ability to pay normal water system expenses. This is similar to a "rainy day"savings account you may have for your unforeseen household expenses. Q: How much cash does the District plan to accumulate in the reserve? A: Our goal is to accumulate $3,000,000 over the next six years. Q: Why is the TDPUD incurring long-term debt to replace water pipelines? A: Pipeline construction is expensive. The cost is currently approximately$1.1 million per mile. We plan to spend$12.3 million during the next four years. This debt that we propose to secure will raise that$12.3 million. By using debt that is repaid over the next thirty years, the people who live in Truckee during that future thirty years and who are served water from that new pipeline will be the people who pay for it. We believe that it is important to make sure our water system is sound both now and in the future. Q: Is the new debt solely for the purpose of replacing leaking water lines? A: No. A portion of the new debt will refund existing debt if we can get a lower interest rate than we are currently paying. Another portion of the new debt pays for the new pipeline being constructed along Brockway Road(and repaid with developer fees rather than rates) and a portion pays for Donner Lake water system reconstruction (paid for by Donner Lake customers through a separate billing surcharge) Agenda Item # 5 b NOUN Memorandum To: Board of Directors From: Peter Holzmeister Date: July 7, 2006 Subject: Donner Lake Surcharge public hearing Why this matter is before the Board: This matter involves continuing the public hearing prior to adopting an ordinance establishing a billing surcharge applicable to Donner Lake Customers. The board conducts this hearing. History: This matter has been discussed at recent Board meetings. Staff will do a presentation on Thursday evening. I will not take time here to go over the entire history again. New Information: A public hearing has been advertised in the Sierra Sun and on the District's website. Notices were posted in the Nevada County Library and the Post Office, as well as emailed to interested parties and associations for distribution within the groups. Notice of this public hearing was also announced on the local KTKE Truckee Radio Station over the three days prior to the July 13 special meeting. Staff has prepared a FAQ sheet addressing the Donner Lake Surcharge, a copy of which is attached. It was posted on the website and is available to the public upon request. An additional FAQ sheet has been generated by staff from questions raised by the public at the July 5 public hearing. This FAQ sheet will be available on July 10 at the District Office or on the TDPUD web site (TDPUD.org). Recommendation: At the conclusion of the public hearing, I recommend that the Board adopt an ordinance establishing a monthly billing surcharge applicable to the Donner Lake area. Donner Lake Billing Surcharge Frequently Asked Questions Q: How much will the billing surcharge be? A: The proposal is to establish a monthly billing surcharge of$6.65 for TDPUD customers at Donner Lake. Q: When will the increase occur? A: The surcharge would take effect approximately October 1, 2006, Q: How long will the surcharge last? A: The surcharge will last for thirty years Q: Why is the surcharge necessary? A: Acquisition and reconstruction of the Donner Lake water system exceeded our original estimate by$1,500,000. The original estimated cost was$12,000,000. The actual cost was $13,500,000, an increase of 12.5% over five years. The bulk of the cost increase is related to acquiring the system from Del Oro Water Company through condemnation. Q: Why is the surcharge being imposed on just Donner Lake customers? A: The Donner Lake customers are expected to pay the cost of acquiring and reconstructing the Donner Lake system without there being a financial contribution from the other TDPUD customers. Q: We are already paying an annual assessment. Why do we need to pay a surcharge also? A: The assessment that appears on your annual property tax bill is not sufficient to pay the entire cost of acquisition and reconstruction of the Donner Lake water system. The surcharge makes up the difference. Agenda Item # 6 l Memorandum To: Board of Directors From: Peter Holzmeister Date: July 7, 2006 Subject: Adoption of an ordinance increasing water rates Why this matter is before the board: This matter involves adoption of an ordinance increasing water monthly rates. Only the board can adopt an ordinance. History: The Board has been discussing this matter at meetings by way of public hearings and staff presentations. New information: Attached is a draft ordinance that increases the District's water rates by Six percent in 2007 and 2008. Recommendation: I recommend that the board adopt the ordinance increasing water rates. WA Ordinance No. 2006 - XX AMENDING THE WATER MONTHLY RETAIL RATES WHEREAS the District is engaged in construction of various water system capital projects during the next five years; and WHEREAS to provide funds for this water capital program the District intends to secure long- term financing through issuance of Certificates of Participation; and WHEREAS a analyses of the District's financial status demonstrates that it does not have an adequate cash reserve; and WHEREAS the financial markets look for financial strength in a water utility as a condition for lending money; and WHEREAS the Board has been advised that a six percent water rate increase implemented on January 1, 2007 and again on January 1, 2008 would provide a revenue stream to establish a cash reserve and cover increasing operating costs: and WHEREAS, on July 5, 2006 and July 13, 2006 public hearings were held to receive comments from the public concerning a proposal to adopt such rate increases; and NOW, THEREFORE, BE IT ENACTED by the Board of Directors of the Truckee Donner Public Utility District as follows: Section 1. Effective January 1, 2007 following monthly water rates shall be effective. Residential Water Rates - The Domestic Water Rates for single family homes, individual condominium units and townhouse units shall relate to the pressure zone in which said service is located. The Domestic Flat Rate Base for all zones shall be the fixed monthly rate of $48.57. The appropriate zonal pumping costs shall be added to the base monthly rate yielding the appropriate flat zonal rates as follows: Zone Charge Zone 1 51.38 Zone 2 53.85 Zone 3 54.99 Zone 4 56.23 Zone 5 56.96 Zone 6 57.43 Zone 7 60.28 Zone 8 62.09 Zone 9 62.80 Zone 10 66.69 Zone 11 70.42 Ordinance 2006-XX 1 Commercial Water Rates - The following Commercial Rates shall apply to all duplex and other multiple dwelling units, trailer parks, and other commercial establishments: Size Gallons Per Service Month Water Rate Allowance 3/4" 6,000 42.43 1" 11,000 50.61 11/4" 17,000 60.91 1 1/2" 24,000 71.14 2" 43,000 97.79 3" 96,000 163.71 4" 171,000 234.24 Water used in any month above the allowance will be charged as follows: Gallons Charge 0 to 16,000 gallons 1.89/1,000 16,000 - 56,000 gallons 1.49/1,000 56,000 - 96,000 gallons 1.19/1,000 96,000 and above .97/1,000 The following Zone Charge per 1,000 gallons shall be added for all water used: Zone Charge Zone 1 $ .33 Zone 2 .61 Zone 3 .76 Zone 4 .91 Zone 5 .98 Zone 6 1.06 Zone 7 1.40 Zone 8 1.59 Zone 9 1.67 Zone 10 2.13 Zone 11 2.58 Until meters are installed, the Commercial Flat Rate shall be based on the foregoing allowance, and the Zone Charge shall be levied against the maximum number of gallons in said allowance. Ordinance 2006-XX 2 Small Residential Unit Rate - Domestic water rates for single family homes, individual condominium units and townhouses units under 300 square feet with no provisions for washer/dryer, dishwasher or outside hose bib, no improved landscaping needing water other than that provided by nature, no leaking plumbing fixtures as determined by District staff. The Domestic Flat Rate Base for all zones shall be the fixed amount of $34.57. The appropriate zonal pumping costs shall be added to the base monthly rate yielding the appropriate flat zonal rates as follows: Zone Rate Zone 1 $37.37 Zone 2 39.85 Zone 3 40.99 Zone 4 42.24 Zone 5 42.96 Zone 6 43.43 Zone 7 46.28 Zone 8 46.92 Zone 9 48.79 Zone 10 52.69 Zone 11 58.76 Section 2. Effective January 1, 2008 following monthly water rates shall be effective. Residential Water Rates - The Domestic Water Rates for single family homes, individual condominium units and townhouse units shall relate to the pressure zone in which said service is located. The Domestic Flat Rate Base for all zones shall be the fixed monthly rate of $51.48. The appropriate zonal pumping costs shall be added to the base monthly rate yielding the appropriate flat zonal rates as follows: Zone Charge Zone 1 54.46 Zone 2 57.08 Zone 3 58.29 Zone 4 59.60 Zone 5 60.38 Zone 6 60.88 Zone 7 63.90 Zone 8 65.82 Zone 9 66.56 Zone 10 70.69 Zone 11 74.64 Ordinance 2006-XX 3 - - ------ Commercial Water Rates - The following Commercial Rates shall apply to all duplex and other multiple dwelling units, trailer parks, and other commercial establishments: Size Gallons Per Service Month Water Rate Allowance 3/4" 6,000 44.97 ill 11,000 53.64 11/4" 17,000 64.57 11/2" 24,000 75.41 2" 43,000 103.66 3" 96,000 173.53 4" 171,000 248.30 Water used in any month above the allowance will be charged as follows: Gallons Charge 0 to 16,000 gallons 2.0111,000 16,000 - 56,000 gallons 1.58/1,000 56,000 - 96,000 gallons 1.26/1,000 96,000 and above 1.03/1,000 The following Zone Charge per 1,000 gallons shall be added for all water used: Zone Charge Zone 1 $ .35 Zone 2 .64 Zone 3 .80 Zone 4 .97 Zone 5 1.04 Zone 6 1.13 Zone 7 1.49 Zone 8 1.69 Zone 9 1.77 Zone 10 2.26 Zone 11 2.73 Until meters are installed, the Commercial Flat Rate shall be based on the foregoing allowance, and the Zone Charge shall be levied against the maximum number of gallons in said allowance. Ordinance 2006-XX 4 Small Residential Unit Rate - Domestic water rates for single family homes, individual condominium units and townhouses units under 300 square feet with no provisions for washer/dryer, dishwasher or outside hose bib, no improved landscaping needing water other than that provided by nature, no leaking plumbing fixtures as determined by District staff. The Domestic Flat Rate Base for all zones shall be the fixed amount of $36.64. The appropriate zonal pumping costs shall be added to the base monthly rate yielding the appropriate flat zonal rates as follows: Zone Rate Zone 1 $39.62 Zone 2 42.24 Zone 3 43.45 Zone 4 44.77 Zone 5 45.54 Zone 6 46.04 Zone 7 49.06 Zone 8 46.74 Zone 9 51.72 Zone 10 55.85 Zone 11 62.28 Section 3. If no protest is made pursuant to Public Utilities Code Section 16078, then the terms of this ordinance shall be effective thirty days after adoption by the board of directors of the District. Section 4. The Clerk of the District shall immediately cause a copy of this ordinance to be published in a newspaper of general circulation and posted in three places within the District. Section 5. The provisions of other Ordinances shall remain in effect to the extent that they do not conflict with this ordinance. PASSED AND ADOPTED by the Board of Directors of the Truckee Donner Public Utility District at a meeting duly called and held within the District on the _ day of 2006 by the following roll call vote: AYES: NOES: ABSENT: TRUCKEE DONNER PUBLIC UTILITY DISTRICT By J. Ron Hemig, President of the Board ATTEST: Peter L. Holzmeister, Clerk of the Board Ordinance 2006-XX 5 Agenda item # 7 � s Memorandum To: Board of Directors From: Peter Holzmeister Date: July 7, 2006 RE: Adopting a Donner Lake surcharge ordinance Why this matter is before the board: This matter involves adoption of an ordinance establishing a monthly billing surcharge applicable to the Donner Lake area, relating to reconstruction of the Donner Lake water system. Only the board can adopt such an ordinance. History: On February 4, 2004, the board adopted a resolution expressing the intent of the Board of Directors of Truckee Donner Public Utility District to enact a monthly billing surcharge for the purpose of raising sufficient money to repay any loans associated with reconstruction of the Donner Lake water system. The Board has been discussing this matter at meetings by way of public hearings and staff presentations. New information: Attached is a draft ordinance that establishes the monthly billing surcharge to the Donner Lake area in the amount of $6.65, effective October 1, 2006. Recommendation: I recommend that the board adopt the ordinance establishing a monthly billing surcharge applicable to the Donner Lake area ------- _ ...._....................... _............ z ft .i{«I i ill Ordinance No. 2006 - ZZ ESTABLISHING A MONTHLY BILLING SURCHARGE APPLICABLE TO THE DONNER LAKE AREA WHEREAS the District acquired and reconstructed the Donner Lake water system; and WHEREAS the customers at Donner Lake who use the new water system and therefore directly benefit by is reconstruction are required to pay the cost of such reconstruction; and WHEREAS the Donner Lake Assessment District was formed to provide funding to pay the cost of reconstruction, but the assessment district revenues are not sufficient to pay the full cost; and WHEREAS the District intends to establish a monthly billing surcharge in the amount of $6.65 applicable to customers in the Donner Lake area to provide revenues to pay for the remainder of the cost of reconstruction; and WHEREAS, on July 5, 2006 and July 13, 2006, public hearings were held to receive comments from the public concerning the proposal to adopt such billing surcharge; NOW, THEREFORE, BE IT ENACTED by the Board of Directors of the Truckee Donner Public Utility District as follows: Section 1. Effective October 1, 2006 a surcharge in the amount of six dollars and sixty-five cents ($6.65) shall be added to the water bills of customers in the Donner Lake water system area. Section 2. If no protest is made pursuant to Public Utilities Code Section 16078, then the terms of this ordinance shall be effective thirty days after adoption by the board of directors of the District. Section 3. The Clerk of the District shall immediately cause a copy of this ordinance to be published in a newspaper of general circulation and posted in three places within the District. Section 4. The provisions of other Ordinances shall remain in effect to the extent that they do not conflict with this ordinance. PASSED AND ADOPTED by the Board of Directors of the Truckee Donner Public Utility District at a meeting duly called and held within the District on the day of 2006 by the following roll call vote: AYES: NOES: ABSENT: TRUCKEE DONNER PUBLIC UTILITY DISTRICT By J. Ron Hemig, President of the Board ATTEST: Peter L. Hoizmeister, Clerk of the Board Agenda Item # 8 Publicr_1 strict u p' Memorandum To: Board of Directors From: Peter Holzmeister Date: July 7, 2006 Subject: Retaining bond counsel for water system Certificates of Participation Why this matter is before the Board: This matter involves retaining the services of an attorney to serve as bond counsel for issuance of the water system Certificates of Participation. This requires Board action. History: We have been talking about issuing long-term debt to finance various water system capital projects. At the May 3 meeting, the Board approved in concept the issuance of COPs in the amount of $27 million. We now need to deal with the several individual elements involved in issuing debt. One such element is to have bond counsel on the financing team. The District has been using the services of David Casnocha of the Stradling Yocca Carlson and Rauth law firm, which is the same firm that employs John Murphy who has also worked with us. The firm specializes in public finance law. David provides us with excellent service and knows the District well. New information: Attached is the proposal letter from David Casnocha. Payment of this fee is included in the financing and is paid to him at the time of closing. Recommendation: I recommend that the Board retain David Casnocha of the Stradling Yocca Carlson and Rauth law firm as bond counsel. . ............_............... ...... ..... . STRADLING YOCCA CARLSON & RAUTII A ➢R09Es'9tbNAL COAPCRAT£ON NEWtP,-,TBEACHO P'CE At'.CRNEYS AT LAW '^'-4c-V Rufl'C'11T 1OP.Ve sl:-, e5011 IdEWP-.^.R-3ER::Y -_A;,f1j 42fd4 eA:;o6_uASNIC. A 334iONTGOMERY STFEE".w'TE 4200 '-xeGw _ .uen: ^.'.'3=Ai,1415}239-2243 5hN FfiANC'9CC.CA 94104 Aa.c Coxas,�a.c:>aa SANTA 3APBAFA., C:FIa `=ELERHONE i4S5,283-n4Q ACS+A9iiE;d t5i 2&"-2ocwe 5>nrx 5n49Aaa.� csLs.r 5A 5111, j'sS4.2965I'dJ5%SEiSCAA May 31, 2006 Peter Holzmeister General Manager Truckee Donner Public utility District P.O. Box '309 11570 Donner Pass Road Truckee, CA 96161 Re. Le=�tt(sea ices re{aline u� ware r reve lace f erriffcatec rf narticinazinn f ri raring Dear Peter: Confirming our telephone conversation today, we would be very pleased to provide legal services to the District in connection with the sale of certificates of participation to help provide financing in connection with the improvement of the District's water system. Stradling Yocca Carlson & Rauth, a Professional Corporation (the "Firm"") was formed in 1975 and now includes approximately 110 attorneys. The Firm handles matters in substantially all aspects of the taw except domestic relations, personal injury and criminal work. Our primary areas of specialization are public finance, public law, tax, general corporate law, corporate securities, real estate, litigation,labor and estate planning. The Firm has three offices in California, one in Ne uport Beach which includes all of the Inrm's practice areas, an office in San Francisco which is devoted entirely to public finance work, and an office in Santa Barbara. We believe that the Firm's size offers an advantage to the clients that we represent for many reasons, First, the Firm has expertise in many areas, such as real estate, corporate securities and litigation, as well as public law, that can be useful in analyzing all relevant issues for a bond financing. Second, our size provides stability and assurance to the client that the Firm will be in practice to follow up on matters related to the services it renders, in our view, this aspect of stability and eon€inuity should be of great importance to public agencies in an environment where, more than ever, bond issues require ongoing monitoring for federal securities and tax law compliance. We have sx:e of the largest public law practices in the State, with over 20 menibers of the Firm practicing in the areas of general public law and public finance. Our public law attorneys devote substantially all of their time to the representation of the interests of public agencies, ncluding counties, cities, redevelopment agencies, school districts, water districts, public utility districts and other special districts of various kinds, and to kite supplying of iegai services in iHX'SSFriSi9?ti iti??{�Yf yj�s9 Peter Ilolzmeister May 31, 2006 Page Two connection with the financings of such agencies. ylembers of the public law department are recognized experts in their areas and are often called upon to speak at conferences and seminars for public agencies and other municipal finance Specialists including seminars held by the National Association of Bond Lawyers, the California Debt and Investment Advisory Commission, the California League of Cities, the California Redevelopment Association, the Association of California Water Agencies, the Coalition for Adequate School Housing. University of California Extension Programs and industry conferences !told by The Bond Buyer and others. The Firm has consistently ranked among the top two bond counsel firms in the State of California. For calendar year 2005, the Firm ranked second in the State of California, having rondered legal opinions on 220 transactions with a principal amount of the financings completed totaling over$7 billion. We have been involved in nearly every type of financing undertaken by public agencies and have helped to develop several of the structures which are widely used throughout the country. We have utilized fixed and various variable rate financing techniques to provide low interest rates on public projects. We believe that we have addressed unique Financing problems by our solutions- oriented approach to working with issuers and other financing team members. The Firm has enjoyed long-term relationships with most of our clients. We believe that our longevity with these and many other clients underscores the high level of service that we provide on an ongoing basis. In particular, we have been complimented for providing excellent and responsive service to clients even when no immediate financing is on the horizon. We take along-range view of a relationship with a client and know that eventually the financings will be completed, but that there is much imisomant work to be done in between intensive financing periods. The attorneys in the Firm who would be primarily responsible for the legal work associated with the issuance of :he certificates of participation would be David G. Casnocha, who can be reached at(415-283-2241).Doug Brown t"4 i5-283-2252j and Ken Entfinger(415-283-2254). 1 am a shareholder in the Firm and manager of the Firm's San Francisco Office. I received my B.A. in 1973 sununa cum laude from Claremont Men's College, and my J.D. in 1976 from Cornell University Law School. I have practiced municipal bond law since 1977. My varied practice emphasizes vovernmental activity transactions for school districts, Cities, counties, rcdevelopmem agencies and other special districts. I have had the pleasure of acting as bond counsel on many matters for the Truckee Donner Public Utility District over the last 15 years. Doug Brown is a shareholder of the Firm practicing exclusively in the area of municipal iinance and Cecializes in ,kater system financings. Doug received his I.A. trout Princeton University and his LD. from Columbia Unive city. Our fee for acting as bond and disclosure counsel (preparing the Official Statement) to the District on an approximately S30 million water revenue certificate of participation would be 580,000. Y Peter Ifolzmeistvr Mav 31, 2Ct)6 rage Three Ail fees would be contingent on the successful sale of the certificates of participation and ',voutd he f## Payable solely from the proceeds of the financing. 3 's In addition +,o the foregoing fees, we would expect to be reimbursed tor out-of-pocket s expenses incurred in connection with the engagement, including, without limitation, document reproduction, in-state travel as approved by the District, and messenger services, expenses reimbursement will N capped at$5,300. Please feet free to call if you would like any additional information about the Firm or our approach to the proposed proceedings. Very truly yours, ✓' —� David G. Casnocha Accepted. Truckee Donner Public Utility District By: General Manager Agenda Item # 9 Memorandum To: Board of Directors From: Peter Holzmeister Date: July 7, 2006 Subject: Proposal from McDonald Partners Why this matter is before the Board: This matter involves consideration of a proposal from Sandra McDonald to help the District secure long term financing for water capital projects. The Board approves consulting contracts of this type. History: We have been talking about issuing long-term debt to finance various water system capital projects. The District retained McDonald partners to help evaluate the issues involved in securing new Certificates of Participation. At the last meeting, the Board approved in concept the issuance of COPs in the amount of $27 million. We now need to deal with the several individual elements involved in issuing debt. New information: I think it would be prudent to have Sandra McDonald continue her involvement in the debt process. She can be of great value in helping select an underwriter, negotiating underwriter fees, drafting the Official Statement, reviewing the interest rate environment at the time of pricing the COPs, designing presentations for the insurance and bond rating agencies, and advising on investment of cash proceeds. Attached is a proposal from Sandra for your review. She estimates that the total fee would be in the range of $25,000 to $35,000. She may be able to save that much just in how we negotiate with the underwriter. She can also save money for us in working with the bond insurance agencies. I believe this would be money well spent. Recommendation: I recommend that the Board approve the proposal from McDonald Partners dated June 1, 2006 ---------- McDonald Partners June 1, 2006 Board of Directors Truckee Donner Public Utilities District P.O. Box 309 Truckee, CA 96160 Ladies and Gentlemen: McDonald Partners, Inc. (McDonald Partners)would be pleased to advise the Truckee Donner Public Utility District(TDPUD) in connection with the financing and potential refinancing of TDPUD's water facilities. McDonald Partners has prepared a preliminary financing plan that includes refunding the 1996 COPS and the issuance of additional parity lien debt to fund or reimburse the District for approximately $18 million of additional projects. Scope of Work McDonald Partners will assist TDPUD in the execution of the financing plan. The work will involve: • Development of an RFP for underwriting services • Evaluation of underwriter proposals and assistance in selecting an underwriter • Monitoring the market to determine the continued viability of the 1996 COP refunding • Refinement of pro-forma for market conditions and changes in assumptions • Assistance in the development of fiscal policies to enhance potential rating • Assistance in the preparation of TDPUD's Preliminary Official Statement • Assistance in the development of a new Master Installment Purchase Contract • Development of a rating presentation for use with rating analysts and credit enhancers • Advise on market conditions and transaction timing • Provide comparable pricing for assistance with the negotiation of offering prices and underwriter's compensation • Assistance with the investment of bond proceeds and funds in the Donner Lake Assessment Account 222 11igh Fagle Road, Alamo.(A 94 07 Phone 025I --0-x'98 Fax(975)?4a 4a25 McDonald Partners is prepared to work closely with TDPUD,your bond counsel and underwriter to develop financial policies and strategies that will reduce costs, maximize investment earnings and minimize overall rates for TDPUD's customers. McDonald Partners is available to begin work on this assignment immediately. All work will be carried out on a confidential basis unless otherwise disclosed by TDPUD. Fee Proposal For the services outlined above, McDonald Partners proposes (i)an hourly fee in the amount of S225/hour, plus (ii) out-of-pocket expenses (which shall include, but not be limited to, travel, lodging, overnight mail, postage and copying). Hourly fees and expenses will be billed on a monthly basis. It is estimated that total compensation for the Scope of Work is estimated to be in the range of$25,000 - $35,000. Additional provisions The effective date of this engagement shall be June 1, 2006. All work will be performed at the direction of TDPUD's General Manager or Administrative Services Manager. McDonald Partners will not engage any subcontractors for this assignment. TDPUD or McDonald Partners may terminate this engagement at any time. If the terms of this engagement as set forth in this letter are satisfactory, kindly sign, or have an authorized representative sign, the acceptance and return an original to me at the above address. If you have any questions or need additional information,please call me at(925)-743-8498. I look forward to working with you and your organization on this engagement. Sincerely, Sandra McDonald Principal McDonald Partners, Inc. Accepted: Truckee Donner Public Utility District By: Peter L . Holzmeister Title: General Manager Date: j,,I , 1 3 , 2006 222 Hi0i Fagie Road, Alamo.(A 9450? Phone�4^_i) -43-,S498 i-ax, ) 5i 74 -8a_5 Resolution No. 2004 - 15 Establishing a Drug-Free Workplace WHEREAS the District employees individuals to perform necessary tasks in the provision of water and electric services; and WHEREAS it is in the District's interest to provide a safe work environment for its employees; and WHEREAS the prohibition of use of controlled substances will promote a safer more productive workplace; and WHEREAS the District has accepted a loan from the State of California requiring that it adopt a drug-free workplace policy NOW THEREFORE BE IT RESOLVED BY THE BOARD OF DIRECTORS OF THE TRUCKEE DONNER PUBLIC UTILITY DISTRICT that: 1. The General Manager is directed to publish a statement in a place where is will be read by employees of the District notifying said employees that the unlawful manufacture, distribution, dispensation possession or use of a controlled substance is prohibited in the District's workplace and any employee who violates this prohibition will be subject to the District's disciplinary procedure. 2. The General Manager is further directed to establish a drug-free awareness program to inform employees about all of the following: a. The dangers of drug abuse in the workplace b. The District's policy of maintaining a drug free workplace c. Any available drug counseling, rehabilitation, and employee assistance programs d. The penalties that may be imposed upon employees for drug abuse violations. 3. Each employee engaged in the performance of a contract or grant financed in whole or in part by any Federal or State of California grant or loan program, shall be required as a condition of employment to abide by the terms of this policy. 4. The General Manager shall establish procedures to ensure adherence to this policy on the part of District employees and employees of effected contractors. PASSED AND ADOPTED by the Board of Directors at a meeting duly called and held within the District on the fifth day of May, 2004 by the following roll call vote: AYES: Directors Aguera, Hemig, Maass and Van Gundy NOES: Director Sutton ABSENT: None CRUCKEE DONNER PUBLIC UTILITY DISTRICT Janntes A. Maass, President E ATTEST , ., � > V Peter L. Holzmeister, District Clerk Agenda Item # N" tUkc Utility o i w w i lit Iistrictl Staff Report To: Board of Directors From: Peter Holzmeister Date: April 30, 2004 Subject: Drug-Free Workplace Policy Why this matter is before the board: This matter involves adoption of a policy by resolution and only the board can enact policy. History: we recently entered into a contract with the State of California to receive a Safe Drinking Water Revolving Fund Loan. A condition of that contract is that the District have in place a Drug-Free Workplace Policy that conforms to the terms of Federal and State law. I have researched the United States Code and the California Code of Regulations and have drafted a policy that, I believe, conforms. New Information: Attached is the draft policy. It provides for education on the dangers of drugs, prohibits their possession in the workplace, and provides that violation subjects an employee to the disciplinary procedure. Recommendation: I recommend that the board adopt the resolution adopting the drug- free workplace policy. REGULAR MEETING May 5, 2004 In accordance with District Code Section 2.08.010, the TDPUD minutes are action only min- utes. All Board meetings are recorded on audio tapes which are preserved perpetually and made available for listening to any interested party upon their request The regular meeting of the Board of Directors of the Truckee Donner Public Utility District was called to order at 7:OOPM in the TDPUD Board room by President Maass. CONSIDERATION OF ADOPTING A DRUG FREE WORKPLACE POLICY Director Sutton moved this item be postponed to consider a rehabilitation clause and to include employee participation in formulation of the policy. There was no second, the motion was not carried. Director Hemig moved and Director Van Gundy seconded, a motion to approve a resolution adopting the drug-free workplace policy. ROLL CALL: Director Sutton, no; All other Directors, aye. SO MOVED. f November 5, 1997 PLH, Mary The Board adopted the policy implementing the Federal Department M097-t i 9 of Transportation mandated drug and alcohol testing program. Page 1 of I Barbara Cahill From: RSOAS1@aol.com Sent: Thursday,July 13, 2006 10:05 AM To: Barbara Cahill Subject: PROPOSED ORDINANCE TO ESTABLISH THE DONNER LAKE BILLING SURCHARGE July 13, 2006 TO: TDPUD FROM: Richard and Celia Oas 15875 Summit Court Truckee, California We have been homeowners at Donner Lake for many years. We are full time residents from mid May thru September each year. We maintain another home out of the area. Regarding the proposed surcharge prompted us to pull our bills and see they are $46.91/month whether someone is using water at our property or not. We gladly pay that amount and have never questioned it. However, adding a surcharge is not acceptable to us. We already have a lien placed by you on our property and to having to pay an additional $6.65 for as long as 15 or 20 years is absolutely out of the question! Why don't you put meters in and charge by gallons of water used? We would gladly pay for the meter and installation - and know that our bills would go down with the amount of water we use in summer and the amount we don't use in the winter! We are against the surcharge at Donner Lake. /s/ Richard and Celia Oas email: rsoasl@aol.com phone: 925-838-8838 To: Truckee Donner PUD Board of Directors Date: July 13, 2006 Re: Water rates Mr. Paddock feels that the currently charged water rate is inconsistent with water conservation practice and is not fair. He thinks a solution would be for the TDPUD to consider water meters, which would be more consistent with water conservation. He thinks there is existing legislation to install water meters. Mr. Paddock would really like to see some thought given to water meters. Brain Paddock 13751 Edelweiss Tahoe Donner Cell 530-908-9448 bgpaddock@peoplepc.com Agenda Item # 490007V -I y Public Utilityy District Memorandum To: Board of Directors From: Neil Kaufman Date: July 10, 2006 Subject: Listing of Proposed Priority 1 Pipeline Replacement At the public hearing on July 5, Director Sutton requesting a listing of the pipelines categorized as Priority 1 for replacement. The attached table gives the Water Department's current assessment of Priority 1 pipelines as presented on the maps at the meeting. It should be noted that the Water Department evaluates pipeline replacement needs on an annual basis. It is quite possible that a pipeline currently categorized as Priority 1 could be downgraded to Priority 2 if other pipelines are found to be in worse condition and in need of more immediate replacement. This pipeline assessment typically occurs in the late fall each year when the Water Department begins planning construction projects for the following year. Director Thomasson questioned whether all 47,700 feet of pipeline given on the Priority 1 list could be replaced for $12.3 million (M). The Water Department's plan is to spend the $12.3 M on pipeline replacement. If pipeline construction costs continue to escalate drastically, the proposed $12.3 M might only buy 40,000-42,000 feet of pipeline. Conversely, if prices stabilize (or even decrease), then construction of 53,000-55,000 feet of pipeline might be achieved. In the event that construction of additional footage is possible, the Water Department would pursue replacement of the worst of the Priority 2 pipelines. Priority 1 Pipelines ' Subdivision Street From To Length Size Unit Price Cost Notes Glenshire Regency Circle Courtenay Lane 10644 Regency Circle 1,550 8" $ 175 $ 271,250 Tahoe Boca Project may require upsizing above 8" Glenshire Lancaster Place Regency Circle End 500 8" $ 175 $ 87,500 Glenshire Somerset Drive 10448 Somerset Drive 10715 Somerset Drive 1,550 12" $ 250 $ 387,500 Glenshire Windsor Way Somerset Drive St.James Place 250 8" $ 175 $ 43,750 Glenshire St,James Place Windsor Way End 475 8" $ 175 $ 83,125 Sierra Meadows Shore Pine Road Columbine Road End 1,350 8" $ 175 $ 236,250 Sierra Meadows Frond Road Shore Pine Road 11886 Frond Road 350 8" $ 175 $ 61,250 Siena Meadows Laurel Court Shore Pine Road End 375 8" $ 175 $ 65,625 Sierra Meadows Redbud Court Shore Pine Road End 200 8" $ 175 $ 35,000 Prosser Lakeview Whitetail Lane Rainbow Drive 10262 Whitetail Lane 1,125 8" $ 175 $ 196,875 Tahoe Donner Mougle Lane 10511 Mougle Lane 11406 Mougle Lane 4,500 8" $ 175 $ 787,500 Tahoe Donner Bennett Flat Road Hansel Avenue 12005 Bennett Flat Road 1,900 8" $ 175 $ 332,500 Tahoe Donner Lausanne Way 12436 Lausanne Way Hansel Avenue 1,150 8" $ 175 $ 201,250 Tahoe Donner Cristallina Way Swiss Lane Swiss Lane 2,700 8" $ 175 $ 472,500 Tahoe Donner Edelweiss Lane Swiss Lane Cristallina Way 950 8" $ 175 $ 166,250 Tahoe Donner Swiss Lane Northwoods Boulevard 13838 Swiss Lane 1,475 12" $ 250 $ 368,750 Tahoe Donner Swiss Lane 13900 Swiss Lane 14356 Swiss Lane 2,450 12" $ 250 $ 612,500 Tahoe Donner Copenhagen Drive 14049 Copenhagen Drive Skislope Way 4,050 12" $ 250 $ 1,012,500 Tahoe Donner Skislope Way 14276 Skislope Way 14550 Skislope Way 1,050 8" $ 175 $ 183,750 Tahoe Donner Skislope Way 15071 Skislope Way 15189 Skislope Way 575 B. $ 175 $ 100,625 Tahoe Donner Skislope Way 15236 Skislope Way 16075 Skislope Way 3,150 8" $ 175 $ 551,250 Tahoe Donner Chalet Road Chapelle Place GC 3rd Fairway Easement 1,800 8" $ 175 $ 315,000 Tahoe Donner Chateau Way 11766 Chateau Way Chalet Road 300 8" $ 175 $ 52,500 Tahoe Donner Golf Course 5th Fairway Easement Snowpeak Way Skiview Loop 700 8" $ 175 $ 122,500 Tahoe Donner Skiview,Loop 12651 Skiview,Loop 14205 Skiview Loop 8,350 8"/12° $ 220 $ 1,837,000 Tahoe Donner Sierra Glen Road Skiview two Northwood$Boulevard 800 8" $ 175 $ 140,000 Tahoe Donner Hillside Dore Northwoods Boulevard Sta hom Road 4,075 8" $ 175 $ 713,125 47,700 Subtotal $ 9,437,625 Engineering&Administration(10%) $ 943,763 Contingency(20%) $ 1,887,525 Total $12,268,913 U7§- IM, Memorandum To: Peter L. Holzmeister, Steve Hollabaugh, Ed Taylor, Mary Chapman, Alan Harry, Kim Szczurek and Barbara Cahill From: Sara Owens Date: July 11, 2006 Subject: Public Outreach for the Water Rate Increase Public Hearing and the Donner Lake Surcharge Public Hearing. In response to a letter that was written to the Board of Directors from CATT and to answer questions that arose at your meeting on July 10`h, I have prepared this memo outlining the results of my attempts at public outreach for the above referenced Public Hearings. The following is a list of potential opportunities for public outreach given to me at the June 26`h meeting and the outcomes: Sierra Sun • 1 Published a Notice in the Sierra Sun on 6/27/06. It was felt that we only legally needed to post the hearings once in the paper. I second posting was not done for this reason. Moonshine Ink • Paper will be published after Public Hearing (deadline for print in July issue is July 6`h for release on July 13th). At this time we had planned to hold the hearing and vote at the July 5`h meeting making publishing in the Moonshine Ink a mute point. Web Page • Posted on website 6/27/06. Public Postings • Posted at Library 6/26/06 • Posted in Lobby 6/26/06 • Posted in Post Office (Deerfield) 6/28/06 • Post Office downtown does not post notices of any kind. It is against their policy. • Posted Notice at Wild Cherries instead of post office on 6/28/06. Email to Associations and Other Interested Groups • I sent an email on 6/26/06. Apparently these groups forwarded the email, because we received calls from other individuals that received the information via email. Channel Six posting • 1 emailed the channel 6 on 6/23/06 and left a message on 6/26/06 with no response to date. KTKE Truckee Radio • The Public Hearings were announced 5 times each/a day for 3 days. It was decided that this was the best way to blanket the community and spread the word. FAQ Sheet— Peter prepared the FAQ Sheet and completed the final revisions on 6/30/06. • 1 posted the FAQ sheets on the Website on 6/30/06. Article in Sierra Sun —This article was never prepared, I think due to time constraints. • We would have needed 2 days notice by noon of that day to get the article in the Sierra Sun. This was to be published in the "My Turn" column. Article in Moonshine Ink • Paper will be published after Public Hearing (deadline for print in July issue is July 61h for print July 131h.) Email and Contact Lists Donner Lake Charlie White sales@donner-lake.com Juanita Schneider ivanitaschneider@cebridge.net Emily Kashtan ekashtan@prodigy.net Donner Lake Property Owners Association info@dlpoa.org Farnsl @alum.svracuse.edu manager@dlpoa.org Entire Service Area Tahoe Donner Home Owners Association admin@tahoedonner.com board@tahoedonner.com dshaw@tahoedonner.com info@tahoedonner.com Chamber of Commerce info@truckee.com CATT info@ca-tt.com Glenshire Home Owners Association Glenshirel @sbcqlobal.net Sierra Sun Contacts Sales - Bonnie York bvork@sierrasun.com Editorials — Rene 587-6061 Moonshine Ink Mayumi mavumi@moonshineink.com Sara Zimmerman saraz@moonshineink.com Channel Six 582-1194 Christy Brady channel6@ttusd.org KTKE Big Mountain Radio Jack Davis 587-9999 cell 386-3585 isdavis3864 @ sbcglobal.net Additional Notes for future Public Hearings: KTKE Radio Needs 1 days notice to read notice live on the air $12 per announcement or $10 for 60 announcements Read live between 6 am and 6 pm Sierra Sun Request a day for Articles and Editorials. paper needs 2 days notice before noon. Depending on other requests submitted earlier than ours Moonshine Ink Submit by 1 s` Thursday of month to be in print the following Thursday. (see attached information) Web Site internet address: tdpud.org/admin Password: 0099 Section: Main Page articles To post the agenda or public notice, go into article name section and select Board meetings, Agenda or Notices. Paste agenda or notice into article text and follow through with task at bottom of each page. Last page will give you the opportunity to edit if incorrect, otherwise, merely click finish and you are done. Posting paper notices Library has a section of notices and agendas Post office will only post notices at Deerfield location Various other sites in Truckee have Bulletin boards, but bring tacs Emailing information Send to Barbara and blind copy email lists Channel Six Never responded. Truckee Donner Public Utility District July 10, 2006 Ms. Manon Celaya Glenshire Devonshire Residents Association ,, 15726 Glenshire Drive Truckee, Ca. 96161 Dear Ms. Celaya and Board of Directors Below are the responses to your July 5, 2006 faxed questions: Question: Does the District need a super majority vote of the board to secure another bond? Answer. No. A majority is required Question: Is the 12 million dollar loan for a specific pipe replacement project or a comprehensive repair program? Answer: The 12.3 mil`?ion is to replace the priority "1 pipes that have been ider=tifiea due to their leak history. This can be considere-d a part of a , pY PirSR- r��taG £ f r �r� . T, � y^rt rliy #1 "iefi/ine refsacentent viould be sore 2006 thru 20 If 0. The reserve funding for the; otork, sail oe trom 21006 thru 2011 at about $600,000 per year ,From 2012 dr ouggh 2021 this $600,000 per year would be avedable to ad-dress;oricatt,#2 aria 93 pipelines 'f the boars se arishes. lrf 2021, 'he 1996 COF3's Sidi�P paid off which a ,4; free up S1,100.000 of yearly debt coverage. This s1 100.0;00 can then be utilized to aauress pri ntr #2 and #3 pipelines if the boars sc wishes, after 2036, the proposed 2006 C^r's rvil be paid off, 'rdarnq up another 1 000 00. i wou'd consider the 2000' COF's as a piece of a =�ff',�rc'P�t7St`✓a tE'.'71cf --�r7'Errf ro ,am. Question: Is the 6% operating budget increase for 2007 and 2008 an increase only to get the loan? Answer, The 6%increase in 2007 and 6% in 2008 is,made up of IWO parts, 3% toward x^,-2.`Ildmg reserve funds 10 prudent levels 3% toneira increases in operating and ruarntenance costs 'he entire 6% n 20v7 and 6 � in, 210 8 is requires to get the 'oats. Question: Can the board raise the rates again for operating expenses during the next budget cycles? Answer: It is the Boards prerogative sc propose ann rinse rates as they see fit. Question: Is the Donner Lake surcharge being handled the same way the Glenshire surcharge was developed? Answer: `/es Question: Why isn't the approximately$1.5 million from the Donner Lake project being returned to the capital reserve fund? ,A mi CIE,- ;hie .,pproxcr;ahoy/ S 1.- rniflion is be r,g relu ed to , pay ute Lat a canes f ust r...F-a frorn .°✓he e it was borrooved, Truckee Donner PUD appreciates your interest in our public process and welcomes your participation. Very truly yours, Stephen Hollabaugh Assistant General Manager P. 0. Box 309-- Truckee, CA 96160 - Phone 5-36-587-3896 _ a xiw.blpudS icrg 07/05/2026 01:27 5305877045 GLENSHIRE PAGE 01 , GLENSHIRE DEVONSHIRE i R 6 S 1 D 2 N T S A S S O C / A T / O N 15726 GLENSHIRE DR TRUCKEE, CA 96161 1 FAX TRANSMITTAL Date: S C7� To: ��Qn- ° yj J � Number of pages:_ Fax #: Sfp - ( `bq (including this one) � ,,w From: s � � s21-rze/L. W ' f Re: �C-� `r-'0 ` In f� 07/05/2026 01:27 5305877045 GLENSHIRE PACE 02 GLENSHIRE DEVONSHIRE RESIDENTS A S S O C 1 A T 1 0 N 13726 GLENSHIRE DR TRUCKEE, CA 96161 Date: July 5, 2006 Memo To: Peter Holzmeister & Board of Directors From: Glenshire/Devonshire Residents Association Re: Rate increase and Debt questions Dear Peter & Board of Directors, Please accept the following comments regarding: a) Adoption of an ordinance increasing the District's water rates. b) Adoption of an ordinance establishing a billing surcharge applicable to Donner Lake customers. c) Increasing the District Debt. We are very concerned about the speed in which these decisions are being made without specifics being made available for public review. The proposed increases being suggested are on the heels of the increases in 2006 budget. The discussion for that rate increase was more thorough and the public reach-out was significantly better. We have followed your discussions and have some specific questions that have not been clearly answered by the board or staff. • Does the District need a super majority vote of the board to secure another bond? • Is the 12 million dollar loan for a specific pipe replacement project or a comprehensive repair program? • Is the 6% operating budget increase for 2007 & 2008 an increase only to get the loan? Can the board raise the rates again for operating expenses during the next budget cycles? • Is the Donner Lake surcharge being handled the same way the Glenshire surcharge was developed? • Why isn't the approximate $1.5 million from the Donner Lake project being returned to the capital reserve fund? 07/05/2026 01:27 5305877045 GLENSHIRE PAGE 03 If you include the intention of the District to move forward with the broadband project the district debt will be over $60 million dollars. There are too many issues that have not been adequately presented to the public. Moreover, the speed in which the board is moving is not allowing enough time for us review the information. Our next board meeting is July 12, the same night you have planned to vote. Our Association would like to discuss the districts proposal and plans. We are requesting you continue this discussion until our board has had the opportunity to review the answers to the questions we have submitted. Thank you for your consideration. Glenshire/Devonshire Residents Association INTERNATIONAL BROTHERHOOD OF ELECTRICAL WORKERS, AFL-CIO at Im -v- Wo 10 10 1 5 4 -,.MU,.N . ,.N 30 ORANGE TREE CIRCLE— — - � _. (707j452-2700, VACAVILLE, CA 95687 E-4X i707) 452-2701 P.Q.BOX 2547,VACAVILLE,CA 95696 July 7, 2006 X President Ron Hemig /'v'�i4� Director Joe Aguera Director Pat Sutton Director Tim Taylor Director Bill Thomason Re: Appeal of Dennis Sanchez Termination Dear Truckee Donner PUD Board of Directors: As an official elected by the citizens of Truckee, you were elected to "represent owner/customer interests, set policy and rates, studies and assess implications of new legislature and alternatives" (TDPUD website). In addition, you are involved with setting policy for management and bargaining unit employees of the District, and your covenant obligates you to function as an impartial adjudicator of employee issues. This obligation requires an unprejudiced arbitrator that will remain equitable during the grievance procedure, an arbitrator that will entirely understand the grievance, and an arbitrator that will allow the accused party the opportunity to challenge their accuser's allegations. The Board has this obligation to every management and bargaining unit employee at TDPUD, and those employees should expect those privileges before a decision is reached. My letter to the Board dated June 30,2006 clearly declared all documentation provided to Local 1245 concerning Mr. Sanchez's termination. In addition, I highlighted if any other evidence was submitted by the District, that it would be unfair to Mr. Sanchez if those accusations were not allowed to be addressed. Since the Board's closed session lasted 1 '/2 hours, and included Mr. Sanchez's accuser Mr. Harry, I was concerned Mr. Sanchez did not receive the impartial arbitrator he anticipated, Therefore, I questioned, and was assured during the Labor Management meeting on July 6, 2006, that the only topics that were discussed during the Board's closed session was Section 14.4 of the grievance procedure, and a discussion of Mr. Sanchez's suspended license. TDPUD's disciplinary policy Section 4.16.010.6(D), allows an employee a pre- disciplinary review with three directors selected by the employee. This specific procedure allows the employee and their representative an `opportunity to respond orally...Further the employee will have an opportunity to question all materials and individuals involved in the issues."Although this section is for the pre-disciplinary hearing, it is quite evident the Board intended for disciplined employees to have every available opportunity to "question all materials and individuals involved" before they are discharged. 3 The existing grievance mechanism allows the employee to appeal their dispute to the Board in writing. Without access to the Board, the Union must submit all documents that address the Districts allegations against the employee. Allowing the District to provide verbal testimony without an opportunity for the Union to refute is a breach of the Board's responsibility to District employees, and to the true connotation of the Districts disciplinary procedures. On June 29, 2006, I requested that Mr. Holzmeister allow Mr..Sanchez and myself access tote Board's closed session, which we were denied.—I indicated to Mr Holzmeister we would be available to the Board during or after the closed session to clarify any questions the Board may have. If the District has provided evidence or verbal testimony to the Board without affording Mr. Sanchez or Local 1245 an opportunity to respond to the statements, then I request the Board withhold their decision until all persons concerned have the opportunity to respond. Finally, I request that the Board execute any moves, motions, or actions in open public session. Tb u for your consideration, Patrick Waite IBEW 1245 Business Representative INTERNATIONAL :2FiOTIHERiHOOD OF ELEC%131CAL WORKERS, AFL-CIO i 2 1601 UNION 1 V-i 30 ORANGE TREE C,RCLE W,CAVILE, CA 95687 7 Vt 452_27C, �.5 sox 2547,vACAViLLE,CA 9506 �,`h d07) 452-27 June 30, 2006 President Ron Hemig Director Joe Aguera Director Pat Sutton Director Tim Taylor Director Bill Thomason Dear Truckee Donner PUD Board of Directors On Friday, June 16,2006 Facilities Maintenance/Relief Utility Worker Dennis Sanchez was terminated from Truckee Donner PUT) for not having a valid driver's license. Mr. Sanchez was presented with a Notice of Proposed Discharge on June 12, 2006 by Allan Harry, Support Services Manager. In addition, Mr. Sanchez had a pre-disciplinary review meeting with Peter Holzmeister, General Manager on June 14, 2006, who upheld the termination on June 15, 2006. Mr. Sanchez has received a copy of the June 12, 2006 Notice of Proposed Discharge (Attachment A), the June 15, 2006 letter from Mr. Holzmeister upholding the termination (Attachment B). Additionally, I received a letter responding to my request for all documentation used to determine termination(Attachment C). Local 1245 or Mr. Sanchez have received no other evidence, documentation, or accusations regarding his termination. Therefore, Local 1245 or Mr. Sanchez have not had an opportunity to refute any other evidence or accusations that may be presented by the District. It would be unfair to Mr. Sanchez to submit any other evidence, documentation, or accusations after the pre-discharge meeting held with Mr. Holzmeister. The Memorandum of Understanding(MOU)between TDPUD and IBEW Local 1245 include a four step grievance procedure. Since the subsequent termination on June 16, 2006, Mr. Sanchez is without gainful employment, and in accordance with Section 14.4 of the MOU, Local 1245 will forego Step I and Step 2 of the grievance procedure. Mr. Sanchez and Local 1245 urge this matter be appealed as quickly as possible. While employed at TDPUD, Mr. Sanchez was directly responsible for building maintenance. Such as repairing plumbing fixtures, carpentry work, clearing snow, stocking shelves and unloading trucks. On rare occasions Mr. Sanchez was sent to pick up and deliver mail. Mr. Sanchez was terminated because he received a DUI while on personal time, and temporarily lost his license for one month. Listed below is a timeline from the date Mr. Sanchez was arrested for DUI, until the day he was terminated. April 18,2006 Mr. Sanchez was arrested for DUI. Mr. Sanchez realizes there are no excuses for driving while intoxicated, and the experience has been humiliating for him. His DMV record shows that this incident is a first offense DUI violation. In addition, his DMV record shows he has no other traffic violations. April 19,2006 Mr. Sanchez is released from jail, and is given a temporary driver's license. In addition, he is instructed his license will be suspended starting June 11, 2006 until October 11, 2006, unless he shows proof of insurance, enrolls in a DUI program,and pays $125 before June 11, 2006. Since the DMV gave him a temporary license, Mr. Sanchez believed if he followed the instructions provided from the DMV he would receive a restricted license on June 11, 2006,which would allow him commute to work and drive TDPUD vehicles. Therefore, because he believed he would have a restricted driver's license on June 11,2006 until October 11, 2006, when his license would be unrestricted, he did not notify TDPUD of his DUI and possible suspension. May 24,2006 Nancy Waters, Human Resources Administrator met with Mr. Sanchez and notified him that she received a notice from the DMV notifying TDPUD that Mr. Sanchez would have a suspended license starting June 11, 2006. Ms. Waters and Mr. Sanchez met with Mr. Holzmeister to discuss the DMV notification. While looking at the DMV information (Attachment D), Mr. Sanchez, Mr. Holzmeister, and Ms. Waters agreed that since he would have a restricted license starting June 11, 2006 it would not impede his work performance at TDPUD. June 9,2006 Mr. Sanchez informed his supervisor that he required this day off to complete the DMV requirements needed to attain his restricted license. He assembled the required material and submitted to the DMV. It is on June 9, 2006 that Mr. Sanchez learned from the DMV that although he completed the DMV requirements his license would still be suspended for 30 days starting June 11, 2006, as per the DMC regulations (Attachment D). June 12,2006 Mr. Sanchez met with Ms. Waters Monday morning, June 12, 2006, and informed her that he will get a restricted license, but first it is suspended for 30 days until July, 2006, Ms. Waters said she was aware oft a�i t, and they needed to meet with Mr. Harry, who presented Mr. Sanchez with the June 12, 2006 Notice of Proposed Discharge. Conclusion Mr. Sanchez believed on April 19, 2006 that if he fulfilled the DMV requirements he would have a restricted license and meet the job requirements of TDPUD. Mr. Sanchez, Ms. Waters, and Mr. Holzmeister all misinterpreted the DMV regulations and believed he would get a restricted license d nng t e r May 24, 2006eti meng. On Friday, June 9, 2006, Mr. Sanchez went to the DMV in good faith that he would meet all DMV requirements. The following Monday, June 12, 2006, TDPUD had the Notice of Proposed Discharge. While Mr. Sanchez's job description clearly specifies he must have a Class C driver's license, the Facilities Maintenance position at TDPUD did not necessitate everyday driving. The position does pick up mail on rue occasions, and does intermittently pick up supplies at the hardware store. However, it is entirely possible for TDPUD to either order the supplies to be delivered,or send one of the other four Supply Services employees to occasionally pick up the mail or supplies for 30 days if needed. During the pre-discharge meeting with Mr. Holzmeister, George Caballero, Shop Steward suggested if having other Supply Services employees perdorm th eos dies was inconvenient, then TDPUD could suspend Mr. Sanchez for 30 days until his restricted license took effect. Mr. Sanchez will have a restricted license starting July 12, 2006, which would allow him to fulfill the Facilities Maintenance job description. As a Facilities Maintenance employee at TDPUD, Mr. Sanchez was responsible for remodeling the conference room, fixing tile by the bathrooms, installing the map in the Boardroom, and numerous other projects (Attachment E). His position is not an entry level position where employees are interchangeable, where if terminated he could easily attain a comparable position. Because of Mr. Sanchez's bad judgment, he has been penalized by the law,and sentenced by TDPUD. Ternunation is a harsh sentence in this unpleasant incident. Mr. Sanchez did lose his license for Driving while intoxicated. Although he did not immediately reveal his DUI to TDPUD, he did not intentionally mislead the District, as he firmly believed he would qualify for a restricted license. The DMV requires a first offender DUI to have their license suspended for a minimum of 30 days as a measure to discourage people from driving while intoxicated, not for the ultimate objective of displacing them from their sole means of employment. Therefore, the penalty of termination should be reconsidered by the Board. Thankyeu for you consideration, Patrick Wait 1BEW Local 1245, Business Representative �?1 ,li7 MEMORANDUM TO: Dennis Sanchez FM: Alan Harry, Support Services Manager RE: Notice of Proposed Discharge DATE: June 12, 2006 Dennis, you are receiving this notice of Proposed Discharge because as of June 11, 2006, you are not able to fulfill the requirements of your job description as Facility Maintenance/Relief Utility Worker. The job description for your position (Exhibit 1) states that you must have a valid driver's license. Per the attached DMV records (Exhibit 2), your driver's license will be suspended for a minimum of thirty days, beginning on June 11, 2006; therefore,your duties. you will be unable to perform You have the right to a pre-disciplinary review of this action with the General Manager to discuss your proposed discharge. If you object in-writing to a pre- disciplinary review with the General Manager, then YOU may have your pre- disciplinary review with selected by you. three (3) members of the District's Board of Directors Dennis, you are being suspended immediately but shall be paid for a period of five working days from today. A pre-disciplinary review with the General Manager has been scheduled for Wednesday, June 14 2006, at 1:00 p.m, at the District office. if this is not agreeable with you, you may change to a day or time that is agreeable with you. Please inform Peter Holzmeister as soon as possible whether the date, time, and place for the review are agreeable to you. If you request your review be with three (3) Directors, the date, time, and place for the review will also have to be agreeable to them. During a pre-disciplinary review, YOU will be provided with an Opportunity to respond orally or in writing and to be represented by a person of your choice. You will have the opportunity to present materials and witnesses on your behalf. The District will also be entitled to present witnesses concerning the Notice of Proposed Discharge. The review will be conducted informally, without regard to technical rules of evidence. Either party may transcribe or record the review. The General Manager or three Directors (if that is your choice) shall issue a written determination as to whether the proposed discharge will be sustained, sustained in part and revoked in part, or revoked, within one day from the date of the pre-disciplinary review. A copy of the decision will be delivered to you Personally or sent by first-class mail. t1l Truckee Donner Public Utility District Board eDirectors Joseph R.Agues J.Ronald Hemig Patricia S.Sutton Business Office (530) 587-3896 FAX (530) 587-5056 Tim Taylor William L Thomason General Manager Peter L Holzmeister June 15, 2006 Dennis Sanchez 15385 Ickneild Way Truckee, California 96161 Dear Mr. Sanchez; On Wednesday, June 14, 2006 a pre-disciplinary review was held resulting from a Notice of Proposed Discharge that you received from Alan Harry. The review meeting was attended by me and Nancy Waters, the Districts Human Resources Administrator and by you and George Caballero, representing IBEW Local 1245. This letter is to inform you that the Notice of Proposed Discharge dated June 12, 2006 is sustained. Your driver's license has been suspended by the Department of Motor Vehicles. An important part of your job duties involves driving a District vehicle. You are not able to do so at this time. it is uncertain that you will be able to do so for several months. This disciplinary action is being taken because of your loss of driving privileges. However, during the meeting you stated that your job performance, other than loss of driving privileges, has been good and suggested that I check with others to verify this statement. 1 have seamed that your recent job performance has not been Qood. If you are dissatisfied with this determination, your recourse will be to utilize the procedure contained in the Grievance Procedure of the current Memorandum of Understanding between the District and the Union. A copy of the Grievance Procedure was previously provided to you as an exhibit to the Notice of Proposed Discharge. If you utilize the Grievance Procedure, then you and the District will be bound by all terms, including the time limits, of the Grievance Procedure. The Grievance Procedure will be the sole method of obtaining a further review of the disciplinary action for you. Very truly yours, Peter L. Hoizmeister Post Office Box 309 11570 Donner Pass Road Truckee, California 96160 June 29, 2006 Dear Pat, The purpose of this e-mail is to respond to your e-mail dated June 22,2006, specifically questions number 3 and 4, since it is my understanding that you have already received responses to questions t and 2. The termination of Dennis Sanchez is based on his loss of license. During the pre- disciplinary hearing that 1 conducted Dennis and George Caballero were, in effect, suggesting that the termination was too harsh. Dennis offered as a defense that his performance has improved. It was suggested that I talk with people and check out that statement. In fairness to Dennis I did check that assertion out and found that his performance is not satisfactory. The defense offered by Dennis was not convincing to I upheld the termination. br► 4 Hf.Mith respect to question number four, I did not review any other documents in determining to sustain the termination of Dennis. Peter Holzmeister State d Cautornra-6usrness. Transportation.and Houvnq Agency DEPARTMENT OF MOTOR VEHICLES .� RESTRICTED LICENSES SECTION 13353.7 VC FOR FIRST OFFENDERS ONLY WITH BAC 0,08% OR MORE WHO WERE 21 YEARS OF AGE OR OLDER AT THE TIME OF ARREST. IF YOU ENROLL IN A FIRST OFFENDER DRIVING—UNDER—THE—INFLUENCE(DUI) PROGRAM AND A 1ePROOF OF ENROLLMENT' FORM (DL-107) IS RECEIVED BY THE DEPARTMENT FROM THE DUI PROGRAM PROVIDER, FILE PROOF OF FINANCIAL RESPONSIBILITY BY A CALIFORNIA INSURANCE PROOF CERTIFICATE(SR 22) AND PAY A 1125 REISSUE FEE, YOU MAY APPLY FOR A RESTRICTED NON—COMMERCIAL LICENSE AFTER 30 J DAYS OF MON—COMMERCIALSLICENSEFINDU ARE A ORDER TO APPLYYCIAL FOR AICENSED RESTRICTEDVLIC YOU MUST DOWNGRADE TO A LICENSE. DRIVING UNDER THE INFLUENCE RESTRICTION. YOUR NON—COMMERCIAL DRIVING PRIVILEGE WILL BE R�STR3CTE T D V3NG 70 AND FROM IHE uU1 PROGRAM AND DRIVING T0, FROM AND DURING THE COURSE OF YOUR EMPLOYMENT. THE RESTRICTION WILL END 6 MONTHS FROM THE SUSPENSION EFFECTIVE DATE. IF YOU ENROLL AND FAIL TO PARTICIPATE OR DO NOT COMPLETE THE DUI PROGRAM, THE DEPARTMENT WILL IMMEDIATELY REVOKE YOUR RESTRICTED NON EGAN —CON B ` LICENSE AND REIMPOSE THE SUSPENSION FOR U MONTHS D FIRST OFFENDERS UNDER AGE 21 AT THE TINE OF ARREST ARE NOT ELIGIBLE FOR RESTRICTIONS UNDER THIS SECTION. WiLoi3z$SVxe f t FACILITIES MAINTENANCE/RELIEF UTILITY WORKER NATURE OF WORK Under direct and immediate supervision of the Support Services Manager, performs work relating to building and grounds maintenance. Performs a wide variety of semi-skilled duties involving general knowledge of the above. Is engaged in repetitive or routine duties involving the use of various procedures and the application of clearly prescribed standard procedures requiring the making of minor decisions and the use of some judgment. Does not exercise supervision. Has regular contact with District employees and vendors requiring tact and diplomacy. Requires the ability to perform maintenance duties including exertion of a large amount of physical effort to stoop, climb,crouch and lift in performance of assigned duties; maybe subject to uncomfortable working conditions including exposure to dust, noise, heat, cold, outdoors, chemicals, mechanical hazards, and electrical hazards. May work alone. EXAMPLES OF WORK 1. Inspects building facilities to identify building maintenance and performs custodial duties as required. 2. Repairs and replaces plumbing fixtures including sinks, toilets, faucets, and pipes; clear obstructions from water and sewer lines. 3. Performs minor carpentry duties; patches and repairs walls, furniture and related objects. 4. Inspects and adjusts heating and air conditioning systems. 5. Repairs and installs electrical lighting systems and fixtures; changes and installs plugs and switches. 8. Clears debris, snow and ice from walkways and parking areas. 7. Receives material, stocks shelves, re-packs material, stages material, operates forklift. 8. Loads, unloads and moves equipment and materials. 9. Assists meter readers with meter reading,service reports,delivery of notices as required. 10. Performs other related duties as required. QUALIFICATIONS REQUIRED Possession of a high school diploma or equivalent. Knowledge of basic practices and procedures related to maintenance of buildings and grounds. Two years experience in building and grounds maintenance. Ability to perform arithmetic calculations rapidly and accurately. Ability to understand and carry out written and oral instructions. Possession of a valid State of California Department of Motor Vehicles Class C driver's license.