Loading...
HomeMy WebLinkAbout7 Donner Lake Pavement Resoration Agenda Item # 7 Memorandum To: Board of Directors From: Neil Kaufman Date: July 14, 2006 Subject: Pavement Restoration at Donner Lake 1. Why this matter is before the board: Board authorization is required for expenditures in excess of $15,000. 2. History: In 2001, the District conducted a joint project with Southwest Gas that installed water and natural gas pipelines along Southshore Drive, Red Mountain Road, Mt. Judah Drive and Devil's Peak Road on the south side of Donner Lake. These roads had been resurfaced in 1999. Based upon an arrangement with between Southwest Gas and the Town, the encroachment permit issued by the Town did not require that the roadways be repaved. However, the encroachment permit issued by Placer County did require a pavement overlay for Devil's Peak Road, Mt. Judah Drive and the Placer County portion of Red Mountain Road. This pavement restoration work was not included in the contract with Manuel Brothers and has not been performed. In 2004,the Town of Truckee issued an encroachment permit for the Donner Lake Pipelines—2004 project. This encroachment permit required the District to mill, and replace the pavement in the eastbound lane of Cedar Point Drive where the water pipeline was installed. This pavement restoration work was not included in the contract with Jurin Construction and has not been performed. These areas to be paved are shown on Figure 1. In the Summer of 2005, the Town of Truckee awarded a contract to Advanced Asphalt for paving at various locations in Truckee. One portion of that contract involved an overlay of Southshore Drive. I had a number of discussions with the Town and Advanced Asphalt. Both parties agreed to include the District's paving work in the Town contract. On September 7, 2005, 1 presented this approach to the Board and the Board approved using the Town contract to perform the paving work as shown on the attached minute order. 3. New information: During the Summer/Fall of 2005, Advanced Asphalt completed the paving on Southshore Drive. However, Advanced Asphalt failed to complete the District's paving work. Jerry Krug with Advanced indicated that temperatures in late September were not proper for placing the planned 1.5-inch overlay. The District has not paid any monies for this work. The 2005 contract between the Town and Advanced Asphalt has been closed. The Town advertised for a new paving and drainage contract in the Spring of 2006. This contract was also awarded to Advanced Asphalt. Advanced Asphalt, the Town and I have discussed the possibility of an arrangement similar to 2005 whereby this paving work would be performed under the Town's current contract. However, the Town is receiving reimbursement from FEMA for a portion of the Advanced Asphalt contract and the Town is concerned that including the District paving would jeopardize the FEMA funds. As described in recent Water Department staff reports, Jessica Wilson and I have prepared a set of Bid Documents covering this paving work at Donner Lake. These bid documents were sent to Placer County and the Town of Truckee for review and comment. At this time, it is necessary to advertise for bids in order that the work can be completed during a time period with proper temperatures. The planned project schedule is: July 19, 2006—Board Authorization to Begin Advertising for Bids August 8,2006—Bid Opening August 16, 2006—Award of Contract September 15, 2006—Completion of Paving Work The total cost of this work is estimated at $100,000. The cost of this project was included in the calculations used to develop the $6.65 surcharge approved by the Board at the July 13 Special Meeting. 4. Recommendation: I recommend that the Board: 1) Approve of the plans and specifications for the project. 2) Authorize staff to begin advertising for Bids with a Bid Opening Date of August 8, 2006. Attachments: Figure 1 Minute Order from September 7, 2005 s UCKEE • PublicDistrict PO Box 309, 11570 Donner Pass Road Truckee, Ca. 96160 Minute Order September 7, 2005 No. 2005-75 CONSIDERATION OF AN AGREEMENT AUTHORIZING THE DISTRICT TO UTILIZE THE PAVING CONTRACT OF THE TOWN OF TRUCKEE TO PERFORM NECESSARY PAVING WORK AT DONNER LAKE. Director Taylor moved and Director Thomason seconded, a motion to authorize staff to arrange for paving work to be performed through the existing contract between the Town of Truckee and Advanced Asphalt for an estimated cost to the District around $100,000 for roads along Southshore Drive, Red Mountain Road, Mt. Judah Drive and Devil's Peak Road on the south side of Donner Lake in Placer County. ROLL CALL: Director Sutton, no (did not go through public bid process); All other Directors, aye. SO MOVED. Post Office Box 309— 11570 Donner Pass Road—Truckee, CA 96160 Phone 530 587-3896—Fax 530 587.1189 CEDAR POINT DRIVE , 1 MOl)NTAIN ROAD DEVICS PEAK RQAD '.. MT.JUDAH DRIVE TRUC�NrjcER Figure 1 Publicstt Donner Lake Paving