Loading...
HomeMy WebLinkAbout13 Donner Lake Substation Services Agenda Item # 13 ONNER Public District ACTION To: Board of Directors From: Sanna Schlosser Date: July 16, 2014 Subject: Consideration of the Award of a Contract for Donner Lake Substation Engineering Services 1. WHY THIS MATTER IS BEFORE THE BOARD Board approval is required for contract awards over$15,000. 2. HISTORY The District is rebuilding Donner Lake Substation to increase station capacity, add another feeder, improve coordination with the adjacent transmission line, improve protection of our equipment, and provide compliance with current code requirements. A brief history of the project follows: • November 2007: Initial engineering contract awarded to R.W. Beck • Summer 2009: Donner Lake Transmission Line rebuilt by PAR Electrical, Inc. • Summer 2009: Donner Lake Feeder 3 constructed by NV Energy and District • April 2010: R.W. Beck contract terminated • 2011: Preliminary civil engineering work performed by TriSage Engineering • June 2012: Initial bid for civil improvements (canceled prior to opening due to permitting issues) • July 16, 2014 (tonight): Award Engineering Services Contract • July 16, 2014 (tonight): Award Civil Construction Contract 3. NEW INFORMATION An engineering services contract is required to perform the detailed electrical and structural design, as well as assembling specifications for the major materials required to rebuild the substation. The RFP for these services went out in late April 2014, and proposals were due by June 10, 2014. Proposals were received from 5 firms: CG Power Solutions USA; Commonwealth Associated, Inc.; Electrical Consultants, Inc. (ECI); Stanley Consultants, Inc.; and TriSage Consulting. A proposal review committee was formed which consisted of Steve Hollabaugh, Joe Horvath, Neil Kaufman, and Sanna Schlosser. Each member scored the technical proposals using the following specific criteria: technical approach, firm and staff experience, project management, and QA/QC controls. This score accounted for up to 85 points out of a total possible score of 100 points. The cost proposals were evaluated only after the technical proposals were reviewed and were worth up to the remaining 15 points. The tabulated scores are as follows: Consultant Avg tech score Cost Score total score TriSage 70.8 15.0 85.8 ECI 73.8 10.4 84.2 Stanley 61.8 0.0 61.8 Commonwealth 58.3 2.0 60.2 CG 40.5 12.8 53.3 TriSage submitted a thorough and well thought out proposal, with the lowest cost proposal. Additionally, due to their location in Reno, they have unmatched availability should problems arise in the field. They have a proven track record with the District through their preliminary civil design work associated with the Donner Lake Civil Improvements, and were highly recommended by their references. 4. FISCAL IMPACT The negotiated Cost Proposal from TriSage Consulting is $130,880. The FY14 Capital Budget includes $348,498 for this project. 5. RECOMMENDATION Award the Contract for Donner Lake Substation Engineering Services to TriSage Consulting in an amount of $130,880 plus a 10% change order allowance for an amount not to exceed $143,968. Stephen Hollabaugh Michael D. Holley Assistant General Manager General Manager