HomeMy WebLinkAbout10 Water Electric Connection Fees Agenda Item # 10 qL." T7RUCKEE ■I Public Utility Di Workshop To: Board of Directors From: John Ulrich Date: December 14, 2007 Subject: Discussion of water and electric connection fees and facilities fees Why this matter is before the board: With the budget present in the Boards mind, it may be an opportune time to review water and electric connection fees, and water and electric facilities fees. Objective 6: Manage the District in an effective, efficient and fiscally responsible manner. Goals: 1.2 Maintain and implement a current Water Master Plan, including the required facilities to meet current and future demand and supply. 2.2 Maintain and implement an Electric System Master Plan, including the required facilities to meet the current and future demand and reliable supply. 6.4 District will conduct an active cost control program. 6.5 Review and implement a Financial Goals policy to achieve a stable financial condition. History: Find attached histories of ordinances for water and electric connection fees, and water and electric facilities fees. New information: The 2008 budget had increased costs for labor, fuel and materials. It is appropriate to ensure that the fees charged by the District are adequate to cover the District's costs. Therefore, a recommended Water Connection Fee has been developed. The increase is strictly related to inflation of our costs. The increase is $40.00 for the two meter sizes. Recommendation: This is a workshop item, so no formal action is suggested at this time. This meeting is for the purpose of review and discussion. We recommend the Board schedule a public hearing for January 9, 2008 for a possible fee increase. J01rich, Interim General Manager WATER CONNECTION INCREASES Potential Meter Size Increase Ord. 2006-02 Ord. 2005-04 Ord. 2004-01 Ord. 2003-06 Ord. 2001-01 Ord. 1992-04 inches 2008 Effective 3/20/06 Effective 6/6/05 Effective 06/19/04 Effective 1/17/04 Effective 04/7/01 Effective 5/6/92 5% 5% 5/8 X 3/4 $1,185 $ 1,145.00 $ 1,090.00 $ 1,040.00 $ 1,040.00 $ 990 $ 450 3/4 $1,220 $ 1,180.00 $ 1,124.00 $ 1,071.00 $ 1,071.00 $ 1,020 $ 450 1 Actual cost Actual cost Actual cost Actual cost Actual cost Actual Cost $ 500 1-1/2 Actual cost Actual cost Actual cost Actual cost Actual cost Actual Cost $ 800 2 Actual cost Actual cost Actual cost Actual cost Actual cost Actual Cost $ 1,075 3 Actual cost Actual cost Actual cost Actual cost Actual cost Actual Cost Actual Cost 4 Actual cost Actual cost Actual cost Actual cost Actual cost Actual Cost Actual Cost 6 Actual cost Actual cost Actual cost Actual cost Actual cost Actual Cost Actual Cost i_Rarhara.lists 12/14/2007 TRUCKEE DONNER PUBLIC UTILITY DISTRICT HISTORY OF WATER FACILITIES FEES INCREASES Ord. 2005-03 Ord. 2001-01 Ord. 1997-01 Ord. 7701 Effective 6/6/05 Effective 04/7/01 Effective 5/5/97 Effective 4/14l77 Residential Per square foot of living space $1.64 $1.56 N/A Commercial Residential & Meter Size (inches) Commercial Tapping Fee Facilities Fee $150 $150 5/8 X 3/4 EDU 1 $3,358 $3,086 $707 3/4 EDU 1.5 $5,037 $4,629 $1,060 $175 $225 1 EDU 2.5 $8,395 $7,715 $1,767 $200 $330 1-1/2 EDU 5 $16,790 $15,430 $3,565 $250 $600 2 EDU 8 $26,864 $24,688 $5,656 $325 $975 3 EDU 15 $50,370 $46,290 $10,605 Actual Cost $2,700 4 EDU 25 $83,950 $77,150 $17,675 Actual Cost $4,500 6 EDU 50 $167,900 $154,300 $35,350 Actual Cost $9,150 i Rarhara.lists 12/14/2007 ELECTRIC CONNECTION INCREASES Ord.2006-01 Ord.2003-05 Ord.2001-02 Ord. 1999-02 Ord.8203 Effective 3/18/06 Effective 1/17/2004 Effective 5/18101 Effective 7/2/99 Effective 3/16182 Size and Type of Service 5% 5% A. Single phase, 120/240 service-200 amp $ 450.00 Three-wire overhead 1)Temporary Actual Cost Actual Cost Actual Cost Actual Cost 2) Permanent connection to structure $ 1,212 $ 1,155 $ 1,100 $ 685 3)Temporary connection to customer-owned power 860 pole and subsequent transfer to structure $ 1,489 $ 1,418 $ 1,350 $ B.Single phase, 120/240 service-200 amp $ 500.00 Three-wire underground(overhead transformer) 860 1) Permanent connection to structure $ 1,212 $ 1,155 $ 1,100 $ 2)Temporary connection to customer-owned power pole; removal of same and installation of underground 1,085 permanent service to structure. $ 1,489 $ 1,418 $ 1,350 $ C.Single phase, 120/240 service-200 amp Three-wire underground(padmount transformer) 1) Permanent connection to structure $ 1,212 $ 1,155 $ 1,100 2)Temporary connection to customer-owned power pole; removal of same and installation of underground permanent service to structure. $ 1,489 $ 1,418 $ 1,350 D.Single phase, 120/240 service-400 amp Three-wire underground or overhead 1) Permanent connection to structure $ 2,295 2)Temporary connection to customer-owned power pole; removal of same and installation of underground permanent service to structure. $ 2,572 E. Three Phase, 280v,240v or 480v service Four-wire overhead 1)Permanent connection to structure Actual cost Actual Cost 2)Temporary single phase 120/240 service for construction purposes-to become three-phase $ 175 permanent Actual cost 4-wire overhead (208,240 or 480V) $ 600 4-wire underground (208,240 or 480V) $ 650 I i_Barbara.lists 12/14/2007 HISTORY OF ELECTRIC FACILITIES FEES INCREASES Ord.2003-07 Ord.2003-01 Ord. 1999-02 Ord. 8203 Effective 2/17/04 Effective 5/5/03 Effective 7/2/99 Effective 3/16/82 Residential 1,200 200Amp or less $ 1, 0 $ 400Amp $ 2,520 $ 2,400 Commercial N/A N/A Voltage / Panel size 1 Phase Fee 3 Phase Fee 1 Phase Fee 3 Phase Fee N/A 120/240 200A or less $ 1,260 $ 2,182 $ 1,200 $ 2,078 N/A N/A 120/240 A $ 2,520 $ 4,365 $ 2,400 $ 4,157 N/A N/A 120/240 400 $ 3,780 $ 6,547 $ 3,600 $ 6,235 N/A N/A 120/240 600 $ 5,040 $ 8,730 $ 4,800 $ 8,314 N/A N/A 120/240 1000 $ 6,300 $ 10,912 $ 6,000 $ 10,392 N/A N/A 120/240 1200 $ 7,560 $ 13,095 $ 7,200 $ 12,471 N/A N/A 120/240 100 $ 8,820 $ 15,276 $ 8,400 $ 14,549 N/A N/A 120/240 1400 $ 10,080 $ 17,459 $ 9,600 $ 16,628 N/A ,092 $ 1,891 $ 1,040 $ 1,801 N/A N/A 120/208 200A or less $ 1 N/A 120/208 400 $ 2,184 $ 3,783 $ 2,080 $ 3,603 N/A N/A 120/208 00 $ 3,276 $ 5,674 $ 3,120 $ 5,404 N/A N/A 120/208 600 $ 4,368 $ 7,565 $ 4,160 $ 7,205 N/A N/A 120/208 1000 $ 5,460 $ 9,457 $ 5,200 $ 9,007 N/A N/A 120/208 1200 $ 6,552 $ 11,348 $ 6,240 $ 10,808 N/A N/A 120/208 1400 $ 7,644 $ 13,239 $ 7,280 $ 12,609 N/A N/A 120/208 1600 $ 8,736 $ 15,132 $ 8,320 $ 14,411 N/A N/A 120/208 1600 $ 10,920 $ 18,914 $ 10,400 $ 18,013 N/A 2,520 $ 4,365 $ 2,400 $ 4,157 N/A N/A 277/408 200A or less $ N/A 277/408 400 $ 5,040 $ 8,730 $ 4,800 $ 8,314 N/A N/A 277/408 00 $ 7,560 $ 13,095 $ 7,200 $ 12,471 N/A N/A 277/408 600 $ 10,080 $ 17,459 $ 9,600 $ 16,628 N/A N/A 277/408 1000 $ 12,600 $ 21,824 $ 12,000 $ 20,785 N/A N/A 277/408 1200 $ 15,120 $ 26,189 $ 14,400 $ 24,942 N/A N/A 277/408 100 $ 17,640 $ 30,553 $ 16,800 $ 29,098 N/A N/A 277/408 1400 $ 20,160 $ 34,918 $ 19,200 $ 33,255 N/A N/A 277/408 2000 $ 25,200 $ 43,647 $ 24,000 $ 41,569 N/A A.Single phase, 120/240 service $ 200 Three-wire overhead -0- 1)Temporary Residential$200 Commercial $40/KW 2) Permanent connection to structure Residential$200 3)Temporary connection to customer-owned Commercial $40/KW power pole and subsequent transfer to structure B.Single phase, 120/240 service $ 200 Three-wire underground(overhead transformer) 1 G 12/14/2007 1 i Rarhara.lists MSTORY OF ELECTRIC FACILITIES FEES INCREASES Ord.2003-07 Ord.2003-01 Ord. 1999-02 Ord.8203 Effective 2/17/04 Effective 5/5/03 Effective 7/2/99 Effective 3/16/82 Residential$200 Commercial$40/KW 1) Permanent connection to structure 2)Temporary connection to customer-owned Residential $200 power pole; removal of same and installation of Commercial $40/KW underground permanent service to structure. C.Three Phase, 2098,240 or 480KV service Four-wire overhead $40/KW 1) Permanent connection to structure 2)Temporary single phase 120/240 service for construction purposes-to become three-phase -0- permanent kw demand X$80 4-wire overhead (208,240 or 480V) kw demand X$80 4-wire underground (208,240 or 480V) i 2 12/14/2007