HomeMy WebLinkAbout11 Professional engineering design services Agenda Item # f TRUCKEE , * Memorandum To: Board of Directors From: Joe Horvath, Electric System Engineer Date: November 2, 2007 Subject: Award of Contract for Professional Engineering Design Services 1. WHY THIS MATTER IS BEFORE THE BOARD Board authorization is required to approve the selection and enter into an agreement with a consultant to provide professional engineering design services to the District for the rebuild of Donner Lake and Tahoe Donner Substations. Objectives: 2. Provide an adequate, reliable and high quality electric supply and distribution system to meet current and future needs. Goals: 2.2 Maintain and implement an Electric System Master Plan, including the required facilities to meet the current and future demand and reliable supply. 2.3 Provide effective and efficient maintenance and replacement programs. 2. HISTORY The approved 2007 operating budget includes capital projects necessary for the improvement of the District's electrical system. The projects include the following: Donner Lake Substation Rebuild, Tahoe Donner Substation Upgrade, and the new Donner Lake Circuit No. 3 feeder. At the February 7, 2007 Board meeting, I discussed the need for soliciting professional engineering services to design these projects. The Board agreed that Tim Taylor would review the Request for Proposal (RFP) documents before making the RFP available to interested firms. The RFP was finished at the end of July and made available to consultants on August 3. Interested firms had until August 31 to submit a proposal to the District. Six firms sent in a proposal in response to the RFP. The firm name, office location, and estimated staff hours to perform the requested work are as follows: Firm Office Location Staff Hours Electrical Consultants, Inc. Salt Lake City, Utah (did not provide hours) Mesa Associates, Inc. Knoxville, Tennessee 2,915 RW Beck, Inc. Seattle, Washington 5,329 Stanley Consultants, Inc. Englewood, Colorado 5,188 Tri Sage Consulting Reno, Nevada 2,662 Wood Rodgers, Inc. Sacramento, California 3,000 After receipt of the proposals, I formed a review committee composed of the following District staff: Sanna Schlosser, Steve Hollabaugh, Neil Kaufman, Jessica Wilson and Joe Horvath. I distributed copies of all proposals to each committee member along with an evaluation form to be filled out for each proposal. The evaluation form asked each reviewer to assign points to 4 evaluation criteria areas, with a maximum of 100 total points possible. The evaluation criteria included: staff experience and qualifications (35 points), technical approach (35 points), depth and quality of firm's experience (20 points), and management approach (10 points). In addition, I contacted 3 references for each consultant. I made the written transcripts of my interviews available to each review committee member for their use in evaluating the proposals. 3. NEW INFORMATION At the conclusion of the review process, we met as a committee to discuss our findings. We were all unanimous in our selection of RW Beck as the most qualified consultant. RW Beck's technical approach to these projects and qualifications to perform the work was noticeably the best of all proposals. They were the only consultant to conduct a site visit to the Donner Lake and Tahoe Donner Substations. As a result of their site visit, they correctly identified the project design challenges including steep slopes, an intermittent stream, and proximity to a residential neighborhood at the Donner Lake substation site, and the compact design (making additions of equipment difficult) at the Tahoe Donner substation site. They were also the only consultant to mention snow depths and snow removal as a design consideration. Whereas the other consultants more or less repeated the scope of work from the RFP, RW Beck clearly described the work to be performed in detail and their approach to implementing and managing the project to a successful completion. Their client references were all unanimous in their opinion that RW Beck is an excellent firm whom they would retain again for additional substation design services. There was some small variation among the committee members in the order preference of the remaining consultants, however it was generally agreed that Tri Sage Consulting was the second most qualified firm. Telephone interviews lasting approximately 30 minutes each were conducted by 3 members of the review committee with the RW Beck and Tri Sage project teams. At the conclusion of these interviews, our overall evaluation and order of preference for the most qualified firm, RW Beck, had not changed. We therefore opened the cost proposal for RW Beck which listed a total estimated not-to-exceed cost of$794,600 of which $736,268 was for labor and $58,332 was for expenses including sub consultants. After informing RW Beck that they were selected as the most qualified firm (subject to Board approval), we began the process of negotiating a final contract including scope of work and costs. We reviewed RW Beck's detailed breakdown of task items and staff hours for the proposed work. In our negotiations, we were able to reduce RW Beck's staff hours from 5,329 to 4,511 hours. This was accomplished by: (1) removing built-in uncertainties, (2) clarifying the intent of the RFP with regards to District work, (3) small reductions in the scope of work, and (4) reducing travel expenses. Removing built-in uncertainties included eliminating hours to prepare permit drawings and applications. Other than CEQA, it is not known with certainty what other permits are required. The consultant included staff hours for an estimated amount of permit work which was eliminated. With regards to District work, it was always the intent of the District in the RFP to prepare the bid documents (other than the technical specifications) and perform the logistics of the bid process. The consultant included staff hours for this work so these hours were removed. Small reductions to the scope of work included reducing the number of design alternatives in the preliminary design stage from 3 to 2 alternatives. A reduction in travel expenses and RW Beck's staff time was achieved by performing some review meetings by telephone conference. The reduction in staff time to 4,511 hours corresponds to a total estimated not-to-exceed cost of$656,195 of which $604,574 is for labor and $51,621 is for expenses including sub consultants. This represents a 17.4 percent decrease in overall project cost from the original cost proposal. 4. SOURCE OF FUNDING The source of funding for the Donner Lake Substation Rebuild and the new Donner Lake Circuit No. 3 feeder is Facilities Fees as these are approved Electric System Master Plan Projects. The source of funding for the Tahoe Donner Substation Upgrade is Rates. If the Board approves of retaining RW Beck as a consultant, the cost breakdown for engineering design services would be approximately as follows: Donner Lake Substation Rebuild and new No. 3 Feeder $561,057 (Facility Fees) Tahoe Donner Substation Upgrade $95,138 (Rates) 5. RECOMMENDATION I recommend that the Board approve the selection of RW Beck to provide professional engineering design services to the District for the rebuild of Donner Lake and Tahoe Donner Substations and authorize the general manager to sign the consulting services agreement for an amount not to exceed $656,195 with the funding sources as noted above. S ve Hollabaugh, Elec Utility Manager o Ulric nterim GM zfi Attachment RW Beck Cost Proposal— Original and Revised COST PROPOSAL t Cost Proposal R.W.Beck's cost proposal includes our estimated cost to provide engineering services to the District as outlined in our scope of work description included in our technical proposal. Also included is our current billing rate schedule for the services. The following cost breakdown covers Donner Lake Substation,the 12.47-kV distribution feeder,and Tahoe Donner Substation. Our estimated costs assume that the three project elements are executed simultaneously in accordance with our Project Implementation Schedule included in Section 1 of the technical proposal. Breakdown of Costs Preliminary Design 381 $ 56,624 Major Materials Procurement 619 $ 84,798 Detail Design 2,059 $ 69,840 Permitting 467 $ 59,231 Coordination with Sierra Pacific and PGBE 46 $ 14,122 Construction Contract Documents,Drawings,Bidding 968 $ 33,024 Protective Relay Settings 108 $ 16,923 Engineering During Construction 443 $ 70,270 As-Built Drawings 238 $ 31,436 Sub-Total Engineering Cost 5,329 $ 736,268 Expenses,including travel and office expenses $ 38,132 GeotechnicalSubconsultant $ 7,600 Surveying Subconsultant $ 12,600 'total Estimated Not-to-Exceed COST $ 794,600 The estimated costs are based upon the below billing rate schedule, which will be in effect until June 30,2008. At that time,the billing rates will be adjusted in accordance with R.W. Beck's annual salary adjustment. 1 XM4128 0807 1 TRUCKEE DONNER PUD ELECTRTIC DISTRIBUTION SYSTEM ENGINEERING SERVICES BREAKDOWN OF COST Donner Lake Substation Tahoe Donner Substation Total Scope of Work Hours Cost Hours Cost Total Hours Cost Preliminary Design 226 $34,250 53 $8,005 279 $42,255 Major Materials Procurement 560 $72,017 560 $72,017 Detail Design 1687 $213,721 306 $40,338 1,993 $254,059 Construction Contract Documents, Drawings, Bidding 729 $92,063 26 $3,931 755 $95,994 Permitting Support 140 $25,149 140 $25,149 Protective Relay Settings 89 $15,222 45 $7,550 134 $22,772 Engineering During Construction 341 $50,102 102 $16,921 443 $67,023 Conformed-to-Construction Drawings 124 $13,989 87 $11,316 211 $25,305 Sub-Total Engineering Cost 3896 $516,513 619 $88,061 4515 $604,574 Expenses, including travel and office expenses 0.862901 $27,113 0.137099 $4,308 $31,421 Geotechnical Subconsultant $6,558 $1,042 $7,600 Surveying Subconsultant $10,8731 $1,727 $12,600 $51,621 Total Estimated Not-to-Exceed COSTI $44,5441 $7,077 $656,195 $561,057 $95,138 $656,195