HomeMy WebLinkAbout2007-10-03 Agenda Packet - Board (17) Agenda Item #
nner Public Utility Di��
Department 6
' F
�ric Department - Capital
The Mission of the Truckee Donner Public Utility District is to
adequate, M e and high quality water and electrical power services,
maa a Dtet rr an open res onsible environmental :
g u p
p �
rnaner aIwest aac ca Est. In pursuing this Mission, the
actively seed rno � enurces as set forth in its Renew
Standardfr
{ r
-Objective 2-Pxt ...*W,"I reliable and high quality electri
tomeet current and future nee
Goal 2.2ment an Electric System Master Pla .
time current and future demand and rel'
'roa12ive and efficient maintenance and replac.
Goal :' �` a effective, efficient and safe operations pro
r
; age the District in an effective, efficient and
' will utilize modern, cost effective work methods a
t will employ a qualified and productive workforce.
`ct will provide work conditions and procedures that enccii ge employee growths
uctivity and retention.
act will conduct an active cost control program.
=11, s OM Al
6 - Electric Department Capital
2008
Can*pital Projects
Rates � ��
➢ Contributions
➢ Facilities Fees
znu
„. zr7xa,�,'�'a"rs�' " "s^s•.� kt*� ."`xb" � z�-� -, l .^ t#z'�, .t � .F, � ,�a� t t .r � � �s�� :.m�
u
� n 'Wv
t'; �= Electric Department Capital RATES
Project Title: Line Ext & Upgrades $ 2529105
Description: Line Extensions and upgrades includes District Capital replacement where
older facilities require replacement with newer facilities
Goal 2.3 - Provide effective and efficient maintenance and replacement programs
Project Title: Pale Replacement $ 659783
Description: Preventative maintenance replacing poles tested and written:up
replacement.
Goal 2.3 — Provide effective and efficient maint
Project Title: Meter Purchase and Test
Description: Meter Purchase for residential and commerci
Goal 2.3 — Provide effective and efficient maintenance and re
Project Title: Purchase and Install Transformer
Description: Replace as needed
Objective 2 — Provide an adequate reliable and high qualityelcc
system to meet current and future needs.
eat - Electric Department Cap" al - RATES
Project Title: Various District Projects $ 134,878
Description: Includes, Fuse Cutout Replacement Program, PCB Transformer Replacement and other
smaller district projects
Objective 2 — Provide an adequate reliable and high quality electric supply and distribution system to
meet current and future needs.
Goal 2.3 —Provide effective and efficient maintenance and replacement programs
Goal 5.1 — District will conduct its business in an environmentally manner
Goal 5.3 —District will seek to minimize any negative impact of its operation on the environment
Project Title : Tahoe Donner Sub, Rebuild
Description: Install 60kV circuit breaker and protec t '
Objective 2 — Provide an adequate reliable and high qua 1
meet current and future needs.
Project Title: Voltage Regulator Controls
Description: Purchase and install one set (3 units) of voltage regulato
Substation old controls and 10 to 15 years old.
Goal 2.3 — Provide effective and efficient maintenance and replacement pr
Project Title: Reclosers and Controls
Description: Replace reclosers and controls in existing substations. The reclos
periodic maintenance and replacement of oil. District has expenencd
intermittent problems with older devices New reclosers contemn
-01
NO
- s
� s 7#
iaa
Y.
Electric Department Capital - RATES
^$Fr*
Project Title: Transceivers for Field Reclosers $ 39690
Description: Install transceivers to interrogate reclosers from the ground
Objective 2 — Provide an adequate reliable and high quality electric supply and distribution
system to meet current and future needs.
Project Title: Pavement Repair at Mar
Description: Asphalt surfaces require periodic maintf
is also much cheaper than replacement of these surfaces:
Goal 2.3 — Provide effective and efficient maintenance and rep
Project Title: Surfacing Materials at Substations
Description: The existing volcanic rock at these substatwns must a replaped
AM
9 ! � R@f-oink
k
n f £ ;nk:?u^ ; '�rF
_� �ALRV��+
ENO d a
ee
t
--�Electric Department C apital RATE
Vehicle Replacement
Project Title: 1-Ton Flat Bed Vehicle /Replace Unit 28 $ 429000
Description: Replace Unit 28 — scheduled for replacement
Goal 2.3 - Provide effective and efficient maintenance and replacement programs
Project Title: Replace Unit 41 with :Y ton $ 339000
Description: Unit 41 is a high mileage vehicle scheduled for replacement
Goal 2.3 — Provide effective and efficient maintenance and replacement pro
Project Title: Cat Excavator/ Repr
Description: CAT excavator will be equipped with
thumb attachment, pole grabber and trailer. Will be us
where large trucks would cause damage to vegetation.-
Goal 2.3 — Provide effective and efficient maintenance and re
Project Title: 7 Ft plow for unit 204
Description: Plow will be used by Foreman to clear protective and cQ
Goal 2.4 - Provide an effective, efficient and safe operations p l
IM
Bill
Im> ��` �`���,✓""-�3i^ ". ` ' r" -ate.�
ectric Department Capital -
Contributions
Title: New Services $ 167,334
Description : New Business — Residential Service/Upgrades, Connection fee work.
Objective 2— Provide an adequate reliable and high quality electric supply and distribution system to
meet current and future needs.
Project Title : Meter Purchase & Test $ 699277
Description: Purchase and install new meters for new customers
Objective 2 - Provide an adequate reliable and high quality electric supply and distribution system to
meet current and future needs.
Project Title: Purchase & Install Transformers
Description : Purchase and install transformers for n� �
Objective 2— Provide an adequate reliable and high quality
meet current and future needs.
Project Title: Commercial Services
Description: Install commercial services to new customers
Objective 2 — Provide an adequate reliable and high quality electric supp
meet current and future needs.
Project Title: Development Agreements
Description: Purchase and install all facilities for new developments
Objective 2 — Provide an adequate reliable and high quality electric supply and
meet current and future needs `
fi
172yt4sY` a'2 F2 i "" X
.electric Department Capital
Facilities Fees
W,
Project Title: Donner Lake Substation Rebuild $ 196089844
Description :
Objective 2 — Provide an adequate reliable and high quality electric supply and
distribution system to meet current and future needs.
Project Title : Donner Lake Circuit No.3 $ 553,757
Description:
Objective 2 — Provide an adequate reliable
distribution system to meet current and future
Project Title: Electric System Master Plan
Description : Engage the services of a consultant to pre
Plan. The Master Plan must be updated every 5 years to rn
fulfill the requirements of AB 1600. District staff will be bull
system improvement and development agreement
Goal 2.2 - Maintain and implement an Electric Syste Est
_ re ured facltes t0 meetthe current �� mangy
d : 77,
kiHt
x 7
5 � 3
£ 3
A
a M
'NOW", r: x
,ggis b
u
6 Electric Department Capital
2008 Carip-%ital Projects
b�.
➢ Rates
➢ Contributions $155
➢ Facilities Fees $2923495