HomeMy WebLinkAbout2007-09-19 Agenda Packet - Board (17) Agenda Item # 9
Truckee Donner PUD
Purchase Power Plan
and 2008 Budget Review
September 19, 2007
Mission Statement of Truckee Donner PUD March 7,2007
The Mission of Truckee Donner Public Utility District is to
provide adequate, reliable and high quality water and electrical
power services, and to manage District resources in an open,
responsible, environmentally sound manner at the lowest
practical cost. In pursuing this Mission, the District will
actively seek renewable energy sources as set forth in its
Renewable Portfolio Standard.
• Objective 2. Provide an adequate, reliable and high quality
electric supply and distribution system to meet current and
future needs.
— 2.5 Procure and contract for low cost electric power supplies to reliably
meet current and future loads.
2
Renewable Portfolio Standard (Excerpt) — TDPUD March 21, 2007
• POLICY:
• Truckee Donner Public Utility District RPS Obiectives
• Meet the intent of SB 1078 to encourage renewable resources.
• Maintain reliable overall energy supply portfolio.
• Minimize adverse impact of acquiring new renewable energy resources on customer electric rates.
• Truckee Donner Public Utility District Electric Oualified RPS Resources
• Renewable resources are defined as non-fossil fueled electric generating resources,
including hydroelectric. These would include but may not be limited to any resource
that meets the definition of"Eligible renewables" pursuant to section 398.4(h)(1) of the
California SB 1305, which sets forth the requirements for power content labels:
— Geothermal (including low-temperature geothermal heat pumps)
— Hydroelectric
— Solar
— Wind
— Biomass and waste
— Fuel cells
• RPS Target:
• At such time that projected resources do not exceed projected demand, TDPUD will
strive to include qualifying resources to meet projected demand.
• Truckee Donner Public Utility District resource mix will have a minimum of 21% of
renewable resources by 2010. Renewable resources are defined as non-fossil fueled
electric generating resources, including hydroelectric.
3
TDPUD Has Developed a Comprehensive Power Supply Plan
• Existing power supply contract expires at the end of 2007 (93% of supply)
— Existing contract essentially eliminated price volatility
• Future Portfolio is intended to balance:
— Conservation - Contract Duration
— Renewable Resources - Cost
— Resource Diversity - Price Volatility
Proposed Expected Case Expected Case
2008 Year 2009 Year
2007 Year Market Energy Market Energy
Energy 3% 0%
SCE
Natural Gas Natural Gas 450X
0
Hydro ° 6%
7% Hydro SCE Hydro
°
4/0 65% 9%
Coal Geothermal
9, 25%
Geothermal
40%
4
Conservation is Considered First Resource
• Historic load growth has averaged 4.7% over the last three
years
• Forecast assumes that load increases by only 1% over the
next three years
— Conservation may account for 1-3% of total load
— Offsets growth that would otherwise require additional resources
• Conservation is estimated to shave approximately 1MW
from TDPUD's monthly average energy requirements
— Greater conservation will reduce market purchases
5
Renewable Resources Could Provide Nearly 25% of Energy
• Stampede Hydroelectric Plant
— Approximately 3.4MW run of river plant
— Output will be shared with the City of Fallon
— Majority of energy will be received March-July, project online on August 2007,
TDPUD receiving energy in September 2007
— Expected cost is $38/MWh
— Contract has been approved by the Board
• _Rye Patch - Geothermal Project
— Ten year contract
— Approximately 4 MW is expected in summer 2008
— Expected cost is about $65/MWh
— Contract has been approved by the Board
• UAMPS Shaped Capacity & Energy (SCE) Project
— Additional capacity is available beginning in summer 2008
— Expected cost is in the mid $50/MWh range
— Project fits TDPUD's remaining baseload need at a relatively low cost
6
Additional Resources - Possibly Available to TDPUD
• Payson Natural Gas Project
— 145 MW UAMPS owned project in commercial operation
— Payson location enables delivery via UAMPS Power Pool
— Long-term cost based power purchase agreement is available
— Majority of energy is received during high load hours
— Expected cost is approximately $80.00/MWh
— Price fluctuates with the cost of natural gas and unit dispatch
— Project adds to resource and fuel diversity
• Geothermal Project (2) — Empire Farms
— Existing geothermal project
— Approx. 2 MW in commercial operation
— Investigating exiting existing Sierra Pacific contract to sell to TDPUD
7
TDPUD Proposed Resource Plan — (Expected) 2008
TDPUD Resource Profile
High Load Hours - 2008
30.0
25.0
20.0
15.0
10.0
5.0
(5.0)
ARM
(10.0)
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
■ Geo 1 ❑ Stampede E Geo 2 ■ SCE ❑ Payson ■ HLH Gap
• Plan results in resource diversity, minimal price volatility and
an expected all-in cost in the range of $60/MWh
• Current gas forecast and average heat-rate
• Short position in first quarter of 2008 remains to be addressed s
TDPUD Resource Portfolio — Expected 2008
2008 Year
M arket Energy
3%
Natural Gas
3%
Hydro SCE
0
4/0 65%
Geothermal
25%
Projected Wholesale Power Cost = $9,750,443
9
TDPUD Proposed Resource Plan - 2009 Expected
TDPUD Resource Profde
High Load Hours -2009
35.0
30.0
25.0
20.0
15.0
10.0
5.0
(5.0)
(10.0)
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
■ Ge o 1 ❑ Stampede E Ge o 2 ■ SCE ❑ Payson ■ HLH Gap
• By 2009, the plan results in an all-in cost in the range of $62/MWh
— Expected variability in cost is within $1 .00/MWh
— Expected cost of comparable Constellation renewal for 2008 is
approximately $78.5/MWh
10
TDPUD Resource Portfolio — Expected 2009
Expe de d C as e
2009 Year
M arket Energy
0% SCE
Natural Gas 45%
6%
Hydro
9%
Geothermal
40%
.� 11
2008 Risk to Budget - Reduced Geothermal Case
TDPUD Resource Profile
High Load Hours - 2008
30.0
25.0
20.0
15.0
10.0
5.0
(5.0)
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
■Geo 1 ❑Stampede M Geo 2 ■SCE ❑Payson ■HLH Gap
• High heat-rates and high gas prices
• Geo 1 is delayed and reduced, Geo 2 is not able to sell to TDPUD
• Expected all-in cost in the range of $62.8/MWh
12
TDPUD Resource Portfolio —Reduced Geothermal
2008
Energy
Net Market
16%
SCE
Natural Gas 71%
3%
Hydro
4%
Geothermal
6%
Projected Wholesale Power Cost = $10,340,000
13
Worst Case —Reduced Geothermal & SCE Unit Down
• Reduced Geothermal Case and One Unit of SCE is down for
entire year
2008
Energy
SCE
45%
Net Market
42% Geothermal
6%
Hydro
4%
i
Natural Gas
3%
Projected Wholesale Power Cost = $1196209000
14
TDPUD Resource Portfolio — Risk vs Benefit
• Short position in first four months of 2008 remains to be
addressed.
• Currently the price for on-peak energy for our open position is a
little less than what was forecast in August to set the proposed
budget.
— Fixing this open position reduces the risk of a higher price in the first
quarter and provides greater budget certainty.
• If the District doesn't lock in this resource, the spot price may
be higher or lower than currently forecast.
�. 15
Purchase Power Expenditure Detail — Expected 2008
PURCHASED POWER EXPENDITURES DETAIL
2008 BUDGET
BUDGET 7 MONTHS ENDED BUDGET $ BUDGET
Purchased Power Costs 2007 JULY, 2007 2008 CHANGE
Tot 11 al Energy Supply-Various $ 8,547,723 $ 5,032,683 $ 9,750,443 $ 1,202,720
Transmission - Sierra Pacific Power Company $ 968,504 $ 509,521 $ 998,453 $ 29,949
Scheduling - NCPA $ 76,260 $ 41,297 $ 63,372 $ (12,888)
Power Supply Costs from Market Purchases(NCPA)
WAPA cost/(credit) toward MWh s $ (382,870) 2632368
Total Bulk Power Costs $9,286,831 $ 5,679,810 $ 10,692,765 $ 1,405,934
Total Annual MWh 156,943
92,552 161,604 4,661
Total Delivered Cost$/MWH $59.17 $61.37 $66.17 $6.99
16
Expected Case — Reduced Geothermal Case — Worst Case
• Change from 2007 Budget
PURCHASED POWER EXPENDITURES DETAIL BEST CASE ALMOST WORST WORST CASE
200811 BUDGET - � ��� � � - m �JBUDGET $ BUDGET $ BUDGET $ BUDGET
2007 CHANGE CHANGE _ _ N CHANGE
T 11 otal Energy Supply - Various $ 8,547,723 $ 1,202,720 : $ 1,792,2717 $ 3,0727277
Transmission - Sierra Pacific Power Company 1 $ 968,504 $ 29,949 " $ 29,949 $ 29,949
Scheduling - NCPA $ 76,2601 $ (12,888) $ (12,888)�
. ._ . ._ _s .---------- ..
Power Supply Costs from Market Purchases (NCPA) $ -
WAPA cost/(credit) toward MWh's $ (382,870) $ 263,368 $ 263,368 $ 263,368
..........
Total Bulk Power Costs- Change from 2007 $ 9,286,831 $ 1,405,934 $ 1,995,492 $ 3,275,492
Total Annual MWh / Change from 2007 156,943 4,661 4,661 4,661
Total Delivered Cost $/MWH - Change from 2007 $59.17 $6 99 $10.64 $18 54
17
Best Case - Plan Requires Balancing Capability
• Current power supply contract includes puts and calls to
balance hourly load
• TDPUD has neither transmission access nor staff to manage
hourly buys/sells in house
• UAMPS manages a power pool to aggregate its members'
balancing needs
— Pool purchases surplus energy from members
— Sells energy to members as necessary to meet load requirements
— Supplements member-member transactions with market purchases and
sales
• Pool charges an administrative fee of $0.50 MWh
• UAMPS transmission arrangements enable deliveries to
Gonder
• UAMPS All-In-Pool Agreement is approved
18
Summary
• Resource Plan balances conservation, renewable resources, fuel diversity,
long-term contracts and medium term purchases. This plan puts the District
well on its way to address the Districts RPS goals
• Achieves an expected "Best Case" all-in cost in the range of $60.00/MWh
• Minimizes price volatility due to fuel and weather risk
• Summary of Action Items (or direction from Board)
— First four months of 2008 buy resource to fill open position
— Insurance for Reduced Geo Case (possible option on 3rd Qtr)
• Future Actions Required
— Approve Payson Project Power Purchase Agreement (after due
diligence)
— Approve Empire Farm Geothermal Power Purchase Agreement (after
due diligence)
-. 19
TRUCKEE DONNER
Public Utility DI'StrICL
RESOLUTION 2007-05
RESOLUTION ADOPTING AN AMENDED
RENEWABLE PORTFOLIO STANDARD
WHEREAS Truckee Donner Public Utility District provides electric service to residences and businesses in
its service territory; and
WHEREAS California Senate Bill 1078, signed into law on September 12, 2002 requires the District to
adopt a Renewable Energy Portfolio whose purpose is to define the District's goal with respect to securing
renewable energy in its power supply mix; and
WHEREAS the Board of Directors of the District wish to amend the District's current Renewable Energy
Portfolio by better defining its goal for securing renewable energy resources;
NOW THEREFORE BE IT RESOLVED BY THE BOARD OF DIRECTORS OF THE TRUCKEE DONNER
PUBLIC UTILITY DISTRICT AS FOLLOWS:
1. The following Renewable Portfolio Standard is hereby adopted
2.The prior Renewable Portfolio Standard adopted by the Board on February 4, 2004 is hereby repealed.
PURPOSE:
Truckee Donner Public Utility District's policy regarding SB1078—Renewable Portfolio Standard
(RIPS). This RIPS will replace and update the RIPS approved by the Board in 2003.
BACKGROUND:
State Senate Bill 1078 (SB1078)was signed into law on September 12, 2002 and was effective
January 1, 2003. The SB1078 legislation modifies the California Public Utilities Code to include
a specific renewable resource requirement for investor owned utilities(IOUs). SB1078 required
IOU's to maintain a minimum of 20% of their power from eligible renewable resources by 2017.
SB107 (Simitan) was passed in 2006 and accelerates the IOU target to 20% by 201031he
legislation (SB1078) also includes provisions that apply to publicly owned utilities. These
provisions would include:
• Requirement that the governing body implement and enforce a renewable portfolio
standard to encourage renewable resources
• Each public utility governing board must define the terms of its RIPS. The terms would
include:
o What qualifies as a renewable resource (i.e. whether or not to count large
hydroelectric projects (in excess of 30MW)
o The percentage of the total energy resources that are to be renewable
o The time frame in which to meet the "goal" of the defined standard
1 RPS Res. 2007-05
Discussion points:
1. Although excluded for the purposes of the IOU's requirements under S131078, TDPUD's
future share in "large" hydroelectric projects is a valuable and critical component of the
energy needs of the community. TDPUD's allocation of the Western Area Power
Administration (WAPA) started on January 1, 2005. This power is under a long term
contract with the Department of Energy's Western Area Power Administration (WAPA).
Truckee Donner Public Utility District believes that a separation of large and small
hydroelectric projects at a 30MW level is arbitrary and ignores the unique nature of the
resources provided by WAPA and the Department of Interior's Bureau of Reclamation.
Truckee Donner Public Utility District will include all hydroelectric regardless of size and
location as meeting the District's renewable portfolio standard.
2. The District's location in the Sierra Pacific Power transmission control area differs from all
of the other publically-owned utilities in California. TDPUD is a transmission dependent
utility(TDU)electrically internal to Sierra Pacific Power's control area.The interconnection
points to Sierra Pacific Power's control area are Summit Intertie(to CAISO),Alturas Line
(to near COB), Gonder Substation near Utah (this is the current location of our existing
contract deliveries and includes the Pacific Corp and LADWP control areas), and
Midpoint Substation (to Idaho Power). This transmission configuration must be taken into
account when trying to identify future renewable resources.
POLICY:
Truckee Donner Public Utility District RPS Objectives
• Meet the intent of SB 1078 to encourage renewable resources.
• Maintain reliable overall energy supply portfolio.
• Minimize adverse impact of acquiring new renewable energy resources on customer
electric rates.
Truckee Donner Public Utility District Electric Qualified RPS Resources
• Renewable resources are defined as non-fossil fueled electric generating resources,
including hydroelectric. These would include but may not be limited to any resource that
meets the definition of "Eligible renewables" pursuant to section 398.4(h)(1) of the
California SB 1305, which sets forth the requirements for power content labels:
o Geothermal (including low-temperature geothermal heat pumps)
o Hydroelectric
o Solar
o Wind
o Biomass and waste
o Fuel cells
2 RPS Res. 2007-05
RPS Target:
• At such time that projected resources do not exceed projected demand, TDPUD will
strive to include qualifying resources to meet projected demand.
• Truckee Donner Public Utility District resource mix will have a minimum of 21% of
renewable resources by 2010. Renewable resources are defined as non-fossil fueled
electric generating resources, including hydroelectric.
Strategies for meeting RPS objectives:
• Public benefit funds may be used to implement projects and may be used to supplement
the production projects.
• TDPUD's allocation of the Western Area Power Administration (WAPA) started on
January 1, 2005 is a non-fossil fuel resource will be included in the RPS objective.
TDPUD will strive to acquire small hydro electric from WAPA within the Sierra Pacific
control area.
• In the future, TDPUD may contract for geothermal generation in Northern Nevada and
Wind generation backed by Natural Gas.
Ongoing Review of Truckee Donner Public Utility District RPS
• A two-year review standard of the RPS will address changes in the Truckee Donner
Public Utility District power portfolio including market power purchases, entitlement shares
of projects and potential changes in the renewable energy technologies.
PASSED AND ADOPTED by the Board of Directors of the Truckee Donner Public Utility District
in a meeting duly called and held within said District on the 21 st day of March, 2007.
AYES: Directors Aguera, Hemig, Sutton, Taylor and Thomason
NOES: None
ABSTAIN: None
ABSENT: None
TRUCKEE DONNER PUBLIC UTILITY DISTRICT
Tim F. Taylor, President
ATTEST:
Peter L. Holzmeister, District Clerk
3 RPS Res. 2007-05
•
Resolution No. 2004 - 16
ADOPTING POLICY AUTHORIZING DISTRICT STAFF
TO ENTER INTO CONTRACTS ESTABLISHING THE
PRICE OF POWER
WHEREAS, the District has entered into a contract with Constellation Power Source(CPS)
for the purchase of wholesale power and energy; and
WHEREAS, the District has entered into a contract with Western Area Power
Administration (WAPA) for the purchase of wholesale power and energy; and
WHEREAS,the District has entered into a contract with Northern California Power Agency
(NCPA) for scheduling services; and
WHEREAS, the District can manage its price risk by purchasing financial instruments and
or physical instruments;
NOW, THEREFORE, BE IT RESOLVED BY THE BOARD OF DIRECTORS THAT:
1. The Power Supply Engineer of the District, in consultation with staff of Northern
California Power Agency and with the approval of the District General Manager, is
authorized to execute financial and or physical contracts, which manage the price
risk of the power and energy purchased subject to the following terms and
conditions.
2. In entering into a said contract the following procedures shall be observed-
a) There shall be established a list of pre-approved firms offering financial risk
management services within the electric industry, which list shall be
submitted to the Board of Directors for approval, and may be amended from
time to time.
b) A minimum of two telephone quotes shall be secured from firms on the pre-
approved list, which quotes shall be recorded on the transaction
memorandum which shall be prepared to document the actions leading up to
purchase of the contract.
c) The Power Supply Engineer shall consult with the appropriate staff of the
Northern California Power Agency regarding the desirability to seek quotes,
and shall again so consult after receipt of the two quotes. These
consultations shall be documented in the transaction memorandum.
Resolution 2004-16
d) In no event shall any single contract entered into under authority of this
policy extend for a period of greater than four months.
e) Prior to executing the contract, the Power Supply Engineer shall submit his
recommendation to the General Manager of the District. After securing
approval from the General Manager, the Power Supply Engineer is
authorized to execute the contract.
f) The Power Supply Engineer shall inform the Board of Directors of any
executed transaction by providing a copy of the transaction memorandum as
part of the next monthly staff report.
PASSED AND ADOPTED by the Board of Directors at a meeting duly called and held
within the District on the fifth day of May, 2004 by the following roll call vote:
AYES: Directors Aguera, Hemig, Maass, Sutton and Van Gundy
NOES: None
ABSTAIN: None
ABSENT: None
TRUCKEE DONNER PUBLIC UTILITY DISTRICT
James A. Maass, President of the Board
ATTEST:
Peter L. Holzmeister, District Clerk
Resolution 2004-16