To: Board of Directors
From: Ed Taylor
Date: September 14, 2007
Date of Board Meeting: September 19, 2007
Subject: COP Committee Report
1. WHY THIS MATTER IS BEFORE THE BOARD
The Board of Directors requested that a committee be established to monitor the
projects and disbursements of funds related to the 2006 COP.
2. HISTORY
The 2006 COP was established in September of 2006. The purpose of this COP is to
fund various District projects, including the District Pipeline Replacement projects.
This plan is prepared under the guidelines of the District's Objective #1 — (Provide an
adequate, reliable, and high quality water supply and distribution system to meet current
and future needs.) and Goal # 1.2 (Maintain and implement a current Water master
Plan, including the required facilities to meet current and future demand and supply.)
and Goal # 1.4 (Provide effective and efficient maintenance and replacement
programs.)
3. NEW INFORMATION
A committee was established to discuss the funding and progress of projects. The first
committee meeting was Tuesday, September 11 at 6 pm. In attendance were Bill
Thomason, Pat Setter, Neil Kaufman and myself.
The following is a list of the items discussed (see attachments):
• Funding to-date
• Completed projects to-date
• Future funding
• Future priority projects
• Staff evaluation of leak issues & possible changes in priority
• Proposed projects for 2008 (map & list)
4. RECOMMENDATION
This is a workshop item.
Cash Flow Project Funds 2006 through 2010
Interest Earnings Capital Expenditures
$17,398,233 Loan Proceeds
First 6 months (7,207,338) Amount spent through 12/31/06 ($7,207,338)
131,684 Interest through 12/31/06-verify through date $131,684
$10,322,579 Balance or available funds at 12/31/06
219,355 Interest earned 1/1/07 through 6/30/07-est 4.25% 219,355
Year 1 (2,767,086) 2007 expenditures per Ed (2,767,086)
$7,774,847 Balance or available funds at 12/31/07
165,216 Interest earned 7/1/07 through 12/31/07-est 4.25% 165,216
168,726 Interest earned 1/1/08 through 6/30/08-est 4.25% 168,726
Year 2 (2,825,000) Expenditures 7/1/08 through 12/31/08 (2,825,000)
5,283,789 Balance or available funds at 12/31/08
112,281 Interest earned 7/1/08 through 12/31/08-est 4.25% 112,281
114,666 Interest earned 1/1/09 through 6/30/09-est 4.25% 114,666
Year 3 (2,825,000) Expenditures 7/1/09 through 12/31/09 (2,825,000)
2,685,736 Balance or available funds at 12/31/09
57,072 Interest earned 7/1/09 through 12/31/09-est 4.25% 57,072
58,285 Interest earned 1/1/10 through 6/30/10 -est 4.25% 58,285
Year 4 (2,801,093) Expenditures 7/1/10 through 12/31/10 (2,801,093)
Balance or available funds at 12/31/10
$1,027,284 ($18,425,517)
Draw Down Schedule 9/14/20079:51 AM
Status of Priority 1 Pipelines To Date
Year Subdivision Street From To Len tI
2006 Tahoe Donner Mougle Lane 10511 Mougle Lane 11406 Mougle Lane 4,500
2006 Tahoe Donner Bennett Flat Road Hansel Avenue 12005 Bennett Flat Road 1,900
2006 Tahoe Donner Lausanne Way 12436 Lausanne Way Hansel Avenue 1,150
2007A Tahoe Donner Cristallina Way Swiss Lane Swiss Lane 2,700
2007A Tahoe Donner Edelweiss Lane Swiss Lane Cristallina Way 950
2007A Tahoe Donner Swiss Lane Northwoods Boulevard 13838 Swiss Lane 4,400
2007A Tahoe Donner Chalet Road Chapelle Place GC 3rd Fairway Easement 1,800
2007A Tahoe Donner Chateau Way 11766 Chateau Way Chalet Road 300
2007E Tahoe Donner Skiview Loop Tyrol Road Snowpeak Way 2,900
2007E Tahoe Donner Basel Place Lausanne Way Mougle Lane 410
2007E Tahoe Donner Skislope Way 15236 Skislope Way 16075 Skislope Way 3,150
2007B Tahoe Donner Skislope Way 15071 Skislope Way 15189 Skislope Way 575
24,73,1
Engineer
Engineering&Adminis
Estimated Actual
i Size Unit Price Cost Cost Differential Notes
8" $ 175 $ 787,500 $ 661,312 $ 126,188 Final Cost
8" $ 175 $ 332,500 $ 285,429 $ 47,071 Final Cost
8" $ 175 $ 201,250 $ 195,570 $ 5,680 Final Cost
8" $ 175 $ 472,500 $ 421,257 $ 51,243 Actual Cost Does Not Include Change Orders
8" $ 175 $ 166,250 $ 139,342 $ 26,908 Actual Cost Does Not Include Change Orders
12" $ 250 $ 1,100,000 $ 918,250 $ 181,750 Actual Cost Does Not Include Change Orders
8" $ 175 $ 315,000 $ 181,510 $ 133,490 Actual Cost Does Not Include Change Orders
8" $ 175 $ 52,500 $ 105,795 $ (53,295)Actual Cost Does Not Include Change Orders
8" $ 175 $ 507,500 $ 458,325 $ 49,175 Actual Cost Does Not Include Change Orders
8" $ 175 $ 71,750 $ 45,050 $ 26,700 Actual Cost Does Not Include Change Orders
8" $ 175 $ 551,250 $ 410,900 $ 140,350 Actual Cost Does Not Include Change Orders
8" $ 175 $ 100,625 $ 30,000 $ 70,625 Actual Cost Does Not Include Change Orders,Services Only-DI Main
Subtotal $ 4,658,625 $ 3,852,740 $ 805,885
ig&Administration(10%) $ 465,863 $ 312,026 $ 153,837
Contingency $ 565,000 $ -
Total $ 5,689,488 $ 4,164,766
gyration (Actual) 2006-Contract B $ 137,026
2007-Contracts A+ B $ 175,000
Planned 2008 Construe
Year Subdivision Street From
2008 Glenshire Regency Circle Courtenay Lane 10644 Regenc
2008 Glenshire Lancaster Place Regency Circle End
2008 Glenshire Somerset Drive 10448 Somerset Drive 10715 Somers
2008 Glenshire Glenshire Drive Rolands Way Whitehorse Rc
2008 Glenshire St. James Place Windsor Way End
2008 Glenshire Windsor Way Somerset Drive St. James Plac
2008 Sierra Meadows Frond Road Columbine Road 11886 Frond F
2008 Sierra Meadows Laurel Court Shore Pine Road End
2008 Sierra Meadows Pine Cone Road Tamarack Way End
2008 Sierra Meadows Ponderosa Drive Tamarack Way 10532 Ponder(
2008 Sierra Meadows Redbud Court Shore Pine Road End
2008 Sierra Meadows Shore Pine Road Columbine Road End
2008 Sierra Meadows Tamarack Way Pine Cone Road Ponderosa Dri-
2008 Tahoe Donner Chamonix Road Northwoods Boulevard 11562 Chamor
2008 Tahoe Donner Hansel Way Northwoods Boulevard Lausanne Way
2008 Tahoe Donner Northwoods Boulevard 11537 Northwoods Boulevard 12241 Northwc
2008 Tahoe Donner Oslo Drive 12212 Oslo Drive Julian Avenue
tion
Estimated Actual
o Length Size Unit Price Cost Cost Differential Notes
+Circle 1,550 8" $ 175 $ 271,250
500 8" $ 175 $ 87,500
:t Drive 1,550 12" $ 250 $ 387,500
id $ 250,000 Services Only-AC Main
475 8" $ 175 $ 83,125
250 8" $ 175 $ 43,750
)ad 350 8" $ 175 $ 61,250
375 8" $ 175 $ 65,625
150 12" $ 250 $ 37,500
sa Drive 500 12" $ 250 $ 125,000
200 8" $ 175 $ 35,000
1,350 8" $ 175 $ 236,250
,e 350 12" $ 250 $ 87,500
ix Road 800 8" $ 175 $ 140,000
1,100 12" $ 250 $ 275,000
ods Boulevard 3,000 8"/12" $ 190 $ 570,000
1,900 8" $ 175 $ 332,500
14,400 Subtotal $ 3,088,750 $ - $ -
Engineering &Administration (10%) $ 308,875 $ -
Contingency $ -
Total $ 3,397,625 $ -
Planned 2009 Construct
Year Subdivision Street From To
2009 Tahoe Donner Golf Course 5th Fairway Easement Snowpeak Way Skiview Loop
2009 Tahoe Donner Sierra Glen Road Skiview Loop Northwoods Bou
2009 Tahoe Donner Skislope Way 14276 Skislope Way 14550 Skislope 1
2009 Tahoe Donner Skiview Loop 12651 Skiview Loop 14205 Skiview L
2009 Tahoe Donner TD Golf Course 15th Fairway Davos Drive Swiss Lane
2009 Tahoe Donner Trout Creek Crossing Zermatt Drive Northwoods Bou
2009 Tahoe Donner Trout Creek Crossing Baden Road Northwoods Bou
Planned 2010 Construct
Year Subdivision Street From Tc
2010 Tahoe Donner Copenhagen Drive 14049 Copenhagen Drive Skislope Way
2010 Tahoe Donner Hillside Drive Northwoods Boulevard Staghorn Road
on
Estimated Actual
Length Size Unit Price Cost Cost Differential Notes
700 8" $ 175 $ 122,500
evard 800 8" $ 175 $ 140,000
Vay 1,050 8" $ 175 $ 183,750
)op 5,450 12" $ 250 $ 1,362,500
700 8" $ 175 $ 122,500 Sliplining Project
evard 700 10" $ 215 $ 150,500 Sliplining Project
evard 900 12" $ 250 $ 225,000 Sliplining Project
10,300 Subtotal $ 2,306,750 $ - $ -
Engineering &Administration (10%) $ 230,675 $ -
Contingency $ -
Total $ 2,537,425 $ -
ion
Estimated Actual
_ Length Size Unit Price Cost Cost Differential Notes
4,050 12" $ 250 $ 1,012,500
4,075 8" $ 175 $ 713,125
8,125 Subtotal $ 1,725,625 $ - $ -
Engineering &Administration (10%) $ 172,563 $ -
Contingency $ 565,000 $ -
Total $ 2,463,188 $ -
4i
i i f
I Ait,
x
J
1�!
~4 t
7 bi
, (
a,. V
� X
1 �
^� a t
[
�
lT
d
a6 q�
A
M ,
i
r
y. t
_
� r �
f 7 b 1 f
! S a
y t }
f +
1 � f
LEGEND
Original Priority 1 Replacement
Completed Priority 1 Replacement
i - Other Pipelines
--- j
Replacedllnstalled During 1990s or 2000s
f NORTH
1 1 �
i
f {,
TRUCKEE DON NER Priority 1 Pipeline Replacement
Public Utility District Tstatus as of December 31 , 2007
f I r 6
r !!
t f7 z
1
Z J,USJ��^vx��t^��
_ _ —
a F.
_
- y�• V Y t r ' 'i
E
i
C
i f
- dd
E �
M
t 6
y J _
r ht y-
6
7
l
s
t
_
a !
,
I r ,
M1.
d
I
x" 1
t 1
!
r
E7t Iz
i E
F � i
z r
i
q } t
r i
t ' 1
t
� r
i J
t
t
E '
1 r 1
r
.f
-1
r
f ,y
}
= 2 i
t u:
C 4 MOVE TO
5
PRIORITY I
P i
xr ..
➢ -1 � Lv�....L".wf gy�pp-- �y '7
1c i
i
f 1 f = y
LEGEND
Original Priority 1 Replacement
I
t ! i Completed Priority 1 Replacement
Proposed Changes to Pipeline Replacement Program
7 � Proposed Sliplining Project
Other Pipelines
Replaced/installed During 1990s or 2000s
1
t
I �
NORTH
d i
tl
i
;1 =
B
1
TRUCKEE DONNER Proposed Changes to
Public Utility District Pipeline Replacement Program
i
r j l
., L ,f717-fi- �
MOVE TO
PRIORITY 1
r� i��l f '��',•'o[` �
g �Y l
f �
5 ,
444 ° fa
• _ =: VETO : ._. ; � 9 i �� i, : ^�,,�/.__...- -,af r' r, 1
f —
r 1
I
iL
i..
y
- �.1
MQV #f3'
fit!~ �w ,,'`>, ,&§ '.;',t r •j ,/� PgORITY 1r
/ �.
PV
1 }
t f
y
-✓. -....,.,., R'i�;1Y�k�4„f'r aM't'.4���JS:h ,�A�iC�`Nr