To: Board of Directors
From: Peter Holzmeister
Date: July 26, 2007
Subject: Truckee River Trail easement
Why this matter is before the Board: This matter involves a request from the Town of
Truckee that our District convey easements to the Town to enable them to maintain the
Truckee River Trail.
History: You are probably familiar with development of the Truckee River Trail. That trail
crosses over land owned by TDPUD in three places. Two of those places are within the
Regional Park that we have leased to the Truckee Donner Park and Recreation District.
The third piece of TDPUD land that is crossed is at the Martis Valley Substation.
Several years ago we conveyed an easement to the Recreation and Park District for
purposes of allowing the Trail to cross the Martis Valley parcel. At that time everyone
believed that the Recreation and Park District. The Trail was planned to cross two of our
parcels in the Regional Park, but since that property was already under lease to the
Recreation and Park District there was no need for us to grant them an easement for the
Trail.
New information: Now things have changed. The Town of Truckee will be maintaining the
Trail. So easements need to be established in the name of the Town of Truckee. The
easement we conveyed to the Recreation and Park District at Martis Valley Substation
needs to be rescinded by action of the Recreation and Park District and then convey by
TDPUD to the Town. Two new easements across the parcels in Regional Park need to be
conveyed to the Town, with concurrence of the Recreation and Park District.
Attached is a letter from Dan Wilkins, Public Works Director/Town Engineer, describing this
entire matter and including maps and other supporting documents. I believe Dan will be at
the meeting to help discuss this.
Recommendation: I recommend that the Board adopt a motion expressing its intent to
convey easements to the Town of Truckee for the purpose of maintaining the Truckee River
Trail as described in the letter fro Dan Wilkins dated July 23, 2007 and its attachments
IM J U L 2 6 2007
Town Council Department Heads
Richard Anderson, Mayor Tony Lashbrook, Town Manager
Town of Scott Berry, Chief of Police
Barbara Green, Vice Mayor �n T T J. Dennis Crabb, Town Attorney
John McLaughlin, Community Development Director
Joshua J. Susman, Councilmember Kim Szczurek,Administrative Services Director
Dr. Mark Brown, Councilmember e"`+, - ti+'g Judy Price, Town Clerk
Carolyn Wallace Dee, Councilmember tI•�•rfas9^ _ `werp.•' e Alex Terrazas,Assistant to the Town Manager
Daniel Wilkins, Public Works Director/Town Engineer
July 23, 2007
Peter Holzmeister, General Manager
Truckee Donner Public Utility District
PO Box 309
Truckee, CA 96160
Dear Mr. Holzmeister:
The purpose of this letter is to discuss the paving, ownership, and maintenance of Phase 1 of the
Truckee River Trail. The goal for the Truckee River Trail corridor in the Town of Truckee Trails
and Bikeways Master Plan is to provide a multi-purpose trail connection across the Town of
Truckee, along the Truckee River, connecting Donner Lake to the Glenshire Subdivision. With
this letter, the Town would like to document a proposal to Truckee Donner Public Utility District
(TDPUD) regarding the transferring of ownership and granting of easements along Phase 1 of
the Truckee River Trail for purposes of paving and maintaining the trail.
Truckee Donner Recreation and Parks District(TDRPD) currently holds easements through ore
TDPUD-owned parcel (APN 19-450-45) for Phase 1 of the Truckee River Trail, as shown in
Attachment A. The trail travels through two additional TDPUD-owned parcels (APN 19-450-53
and 19-450-54) for which no easements currently exist. A portion of the Truckee River Trail is
currently constructed of a Class 2 aggregate base material. The Town has identified funding in
the FY 2007/2008 budget to pave this section of trail with asphalt concrete, consistent with the
Town of Truckee Trails and Bikeways Master Plan.
The Town and TDRPD have agreed upon the Town taking over ownership and maintenance
responsibilities of the Truckee River Trail, provided that the underlying landowners of the trail
are also agreeable to this change in ownership and responsibility. A copy of the letter from
TDRPD concurring with this agreement is attached to this letter(Attachment B).
With this letter the Town would like to formally request that the easement through APN 19-450-
45 be transferred from TDRPD to the Town of Truckee. The Town will take the lead on the
logistics of accomplishing this task, assuming that TDPUD is willing to allow the easement to be
transferred and/or granted. The transfer of the easement would essentially require that TDRPD
abandon their existing easement through TDPUD property. Concurrently, TDPUD would need to
formally dedicate the easement to the Town of Truckee, who would then formally accept the
10183 Truckee Airport Road, Truckee, CA 96161-3306
www.townoftruckee.com
Administration: 530-582-7700/ Fax: 530-582-7710/email: truckee@townoftruckee.com
Community Development: 530-582-7820/ Fax: 530-582-7889 l email:cdd@townoftruckee.com
Animal ControlNehicle Abatement: 530-582-7830/ Fax: 530-582-7889/email:animalcontrol@townoftruckee.com
Police Department: 530-550-2328 / Fax: 530-550-2326 l email:policedepartment@townoftruckee.com
Printed on recycled paper.
Peter Holztmeister, TDPUD General Manager
Page 2
easement. I have attached the easement plat and legal description that were prepared by
Sagebrush Surveying in 1998 for the easement dedication to TDRPD (Attachment Q.
In addition, and as shown in Attachment A, a portion of the trail runs through APNs 19-450-53
and 19-450-54. These parcels are also owned by TDPUD but no easement was dedicated to
TDRPD because it is to be part of the Truckee Regional Park. Therefore, if the Town were to
take over ownership and maintenance of the trail through this parcel, it would be necessary to
create easement through the parcels with accompanying legal and new plats and legal
descriptions. In 2000, the Town retained Gary Shuart, a licensed land surveyor, to begin the
preparation of the easement documents for this portion of the trail, the results of which are
provided in Attachment D. However, once the trail was complete it was decided that TDRPD
would maintain ownership of the trail for the time being, and so these easements were never
created. Therefore, the Town is in the process of retaining a surveyor to prepare and complete the
plat and legal description documents, which we will forward to you when available.
Based upon the TDPUD's overall support for the Truckee River Trail project, the Town hopes
that the transfer of ownership of these easements from TDRPD to the Town of Truckee is
generally acceptable to TDPUD. As such, the Town would respectfully request that the TDPUD
Board consider this action.
I would like to thank TDPUD, on behalf of the Town, for its continued cooperation and
partnership in improving this important community asset. I appreciate your time in considering
this issue, and am available at 582-2902 to answer questions or provide clarifications regarding
this proposal.
Ancerelyz
1 �
Daniel P. ilkms, P.E.
Public Works Director/Town Engineer
Enclosed: Attachments A-D
10183 Truckee Airport Road, Truckee, CA 96161-3306
www.townoftruckee.com
Administration: 530-582-7700/Fax: 530-582-7710 l email: truckee@townoftruckee.com
Community Development: 530-582-7820/Fax: 530-582-7889 l email:cdd@townoftruckee.com
Animal Control/Vehicle Abatement: 530-582-7830/Fax: 530-582-7889 l email: animalcontrol@townoftruckee.com
Police Department: 530-550-2328/Fax: 530-550-2326 l email:policedepartment@townoftruckee.com
t � ';e �,s: � .-• ot.� ...5 .��.r•lrtr t'i«"i Z � +ue �" �1e
<. �. t. -.• NSA
s y
f4
ri= v
_.
a.1 ��€ _ err a �+S ✓ ��
x
s
t, lsaao-73 s a
x: Pt
S $ P
s _
e•
F_ y
fi'i 9 4�t �B 4f ...A 330-04 ,
; L TTSA
119-4407
x' s` 19-440-72 .3 ' 6 ,,;•s '` t 19-440 81� -� k
7TSA -
t,
m r a44
4 a .
-� -761
19-450-35 ty A 3
T
TSD
r < _ TDRPD ,.+ '� >« :', ,r. ! 19-440-83 -
t. 6
" 's 19-440-79 >: �, — TSD -
? c = $
19-45045x s= TOWN
' 1TDPUD9-4 3 TDPUD a +s.',« ,-19-440-75
y 19-450 55 ,y 19-450 54 _.s.xt ,g. s"J,; TSD .>b
TSD o j _
- ���` TDPUD _ {f` ��-..°
i
.a-
A. ..
.. 19-050 52 ,x 3
" r TDRPD - s :x OCkr= x r€� aY - ' `- . ex o
t
y5
' s
V
-
Existing Paved Trail Truckee River Trail Construction and Maintenance Access Easments
INProposed Paved Trail (Currently Class 2 Aggregate)
W E Phase 3 (Not Yet Built) TDPUD Parcels Requiring New Easements
TDPUD ParceIV Requiring Transfer of Easement3.
s Proposed Construction Easement
Parcel Boundaries 0 0.04.08 0.16 0.24 0.32 l3,.)oe W addvi, 6'07
Mlles File:LAW,MAPS.LceacyTrail Construction Acccss Eaaemcnl TDPUD
Attachment B
Iruckee Donner
Recreation and Park District
10046 Church Strccf, "Thic-ec. Calif6ml.1 96161 General Manager
TRUCKEE-DONNER 131 IONF_. ( s8 .7r,(} �'i.: ( Ott;. , �_77�
RECRF,ATION&PARKnISTRICT Steve Rarld811
July 9, 2007 File#070711
Dan Wilkins
Town of Truckee
10183 Truckee Airport Road
Truckee, CA 96161
Dear Dan,
The Truckee-Donner Recreation and Park District Board of Directors, at their regular
meeting of June 14, 2007, discussed the Legacy Trail and the possible paving of the trail
from Regional Park to Riverview Sports Park.
The board took the following action: The District accepts the proposal from the Town of
Truckee to take over phases 1 and 2 of the Truckee River Legacy Trail and the plan that
specifies the paving of the trail. The District will release our easements to the Town of
Truckee allowing the Town to renegotiate with land owners. The Town will take over
the responsibility of maintenance and liability of the trail from Regional Park to River
View Sports Park. The trail and any paving in Regional Park cannot be wider than the
current existing multi use trail in existence now.
This letter confirms the District's action to transfer ownership of the Truckee River
Legacy Trail from Regional Park to River View Sports Park to the Town of Truckee.
When the trail is accepted by the Town, it will be their responsibility for the maintenance
and liability of the trail.
/�&W
Steve Randall
General Manager
I o
3
POINT
I N 65017100„ E o
o ID
� '.• /SLO EASEMENT ,o
/N 63°22'15' El�tq.4q' `� I o%' _
TOE SLOPE D
/ N.73°1-1'03" E - C)
- - ---- -- -- — - — -- — - -- -- .7 - ----a °°� -- --
162'
—� SLOPE EASEMENT ,� TIE N ° ° D
5-1 E 60.07 70 02'08 W 2031.15 d
TO N. 1/4 I GOR. 5E6.14
N.32°2420" E 57.67'--�. .' ° �" N.Bq°46'10" E 65.81' to
ago � 2�/. / POINT "AI,�.� 5.73°38'21" W 52.g3' ;u
IN 0
\` •. o
2O' WIDE f@IKE PATH 1
EASEMENT •' S.64°43'Ig" W a 1 33
5.4q°17'05" W z
j' 5.53058'I5" W o ��5,bcil75.72' p
0 °3o'16" W TRUCKEE DONNER
�e PUBLIC UTILITY DISTRICT `A[
,/AZ-0L. IO' WIDE ells
wEsr Lm�E °' PATH (EX15TIN6) q4 OR 440
5€G.14 .19
�5.2q°Ob'37" Vet W
,4r
a
5.6705253" W • o"v 5.37°5b'50" W � I N
53.70, o°� 66.45' w
/
5.50°21'00" f�! � 5.52 051 I W
46.53' �/� ;- 41,3b= TRUCKEE-DONNER PARK
s.65 2123 Wa;� p�. 4 RECREATION D15TRICT ��
°46�21' w A��'
%�� 501 Oil 041 �- 0
4r55',(,b0.26) / � :*
TIE, Nh6°16'5q" E 2785.66'TO N, 1/4 GOR. 5.14 w
- XHI 81 T
m
TOWN OF TRUCKEE
,RY SHUART LANE) SURVEYING
'LS 4645 , RENEWAL Oq/30/02 BIKE PATH EASEMENT 3
EXISTING FIELD ALIGNMENT
>v. rtzuuc_oo517_ �Iws14 AUGUST - 5EPTEMHER 2000
Attachment C
Sagebrush
PLXNNLNG • SL'RVEYLNG • CONSULTING
P.O.Box 516 •Truckee,CA 96160 •(916) 587-6902
Date: March 10, 1998 JN(9811)
EXHIBIT A
BIKE PATH EASEMENT
al
_ Beingan area of land lying ying on, over and across a portion of the Northeast Quarter of
Section 14, Township 17 North, Range 16 East, Mount Diablo Meridian; more +
particularly described as follows: -
-,Beginning at the North Quarter Comer of said Section 14, as shown on Parcel Map
-No. 93-052 filed for record in Book 18 of Parcel Maps at Page 233 of Nevada County.
Records, State of California; thence South 89°32'53"East on the North Line of said
Section 14 a distance of 41.23 feet; thence South 76°47'52" West 40.94 feet; thence
South 69°05'15" West 1.58 feet to a point on the North/South Centerline of said Section
14; thence North 00°35'21"East 10.24 feet to the Point of Beginning.
Prepared by:
Charles R. Sage, Jr.
L.S. 5549
Exp. 06/30/01
LAIN D
,j;; N% o. 5549 Q
OF CA
Sagebrush EXHIBIT "B"
BIKE PATH EASEMENT
PLANNING SURVEYING CONSULTING A POR. OF PARCEL 1 BK 15 PM PG.68
P.O. Box 510 Truckee. saiso
(53o) 587-sso2 LYING WITHIN SEC.14, T.17 N., R.16 E., M.D.M.
(mo
2-6-98 jN,,9811 TOWN OF TRUCKEE NEVADA COUNTY CALIFORNIA
SCALE � 1'= 10,
7RUCIOE SANI TARYDIST.
REWINDER
18 P1N=
Mt&NITY
I N
0
s0eg ESM'? ..
��+ 10P D,WIDE SAM 8479 a
114 CORNER E OC 0
o�
N
SEC 11 S89'32153"E 41.23'
SEC 14
F0
N 1t
sew,00 M o 2�W 40.949
�. 0 571547 5
z
S69'05'15"W
1.58'
TRUClarDOWNER 6
TRU WD A IERP.U.D.
REC.&PARKD/ST. W P5 �1
ti
►r
J
r.
O
R •.,• f.�:.
J
s No. 5549 r
•. :��•
Attachment D
0
3
L�
;u
c
S
C
.ZI
--I
TRUCKEE DONNER z
SCALE 1 =100 , �� GL. 10' NUDE BIKE PUBLIC UTILITY DISTRICT t)
O PATH (EXISTING) q4 OR 440
}NEST LINE �
.�� �
SEG.14 ./j 5.2q 0065-l" W �
5 53.70 53 W ooa
D
�K��-DONN�R PARK x
s•b5°�I'?�° w o o�i" p�, � � � RECREATION �
N DISTRICT .o
Lu
514 55(60I28)� /oa� _" 5OI OR 041 (VON cn
^=TIE. N.66°18'S9" E 2785.68' ►^fLY. EDGE PARKING
�o HIDE BIKE PATH ° ., r_
-l'4I" W °`% TO N.I/4 GOR. 5.14 EASEMENT N.81 054 E 57.74 �n tr
A 5.62°46'21" W 45,73' (60.28) 5.83°I5'32" E 51.50' r!
45 i o 5.51°54'35" W N.79°42'10" E 5.66623'07" E 55.20' 5.67°37'51" E 51.05= V)
714 W b4.3C' 5.�2°25'S9" E - POINT "A" z
-- �oQ�aPx� ocoaoolDaP ,62.84' r- S.T!°42'58' ELc�z i
�O 7OP0 OOIQ -f O
�4'54" W r 5.8q°30'D-l" E 65.80'� 43.62'
°N.82°06'15" E 61.22' 18'I°I1'4q" E 50.36'\ oaoi
N.84 1326 E GL.10' WIDE BIKE` 11y81°36'12" E 5.26°31'OB" W N.76°Iq` 6" E 54.bl
4 Gw 66.13' PATH (EXISTING) bl a3 19.58 '1f N-43°07'10" E 11.73'
WUTN !. -
TRANSITION AREA `"._ 7UTH 27.8q o
X 0
�=
STATE HNIY. 267 EDGE OF PAVEMENT
N.8q°OI'4q" W 43.35'
� w
-EXHIBIT "F311
m
m
TOWN OF TRUC KEE m
m
>RY SHIjART LAND SURVEYING BIKE " ' N T ro
3
'L5 4645 , RENEHAL Oq/30/02 1
EXI5TIN6 FIELD ALIGNMENT -°
.I.N. rwr.,K_005P- NH514 AUGUST - 5EPTEMSER 2000
\\\�20.WIDE BIKE
PATH EASEMENT
\$� BRI06E AREA
TRW
X
FM 233
SANITARY DIST. \
t AG PAVED
Mc61NITY REMAINDER PCA-• AREA _
Doc.*"-34210 PGL. A
9 NOS 774 —TiE.N.O; 4! E 9.q' I _�•�.a�e�✓e ms/� o�
SEG. II TO N.I/4 uoR 5E G.l4 ��A/" �'yp BIKE
7.,,sue• --. 18 PM 233
.______.___�___._______________ VL �pOj• .�'� II_�� PATH(EXISTIN6)
�Sa o i N.1/4 c'm SEC. 14 n�orare
5EGJ4 I
.•' 7D'834D•EI
/• 59.45' _ /r'�'�N10'4'Itq•E 7m
72Jq Is
NW'21'42-E I / \
4060' / Nbl']054•E 4a Q
y r�jy[( io6.M•
7S'DE'E ..�• `Nb7•S4�D4'E IPC
15 PH 66
� k�•,4� E 10-5-00
~• NbD'i4 44'iE W
x,.E ". T 15 PM 68 A
j s�scicEe-DOnorER R6GR�ATION t PARK DISTRICT 6GVAL��$
iDOG.NO.90-SW26 NORn«sovm ROTATE
w smH _
PIS i
I II
- -- -P-- --- --- A
i
i
:i
i
I
i
EXHIBIT
TOM OF TRUCKEE
i 3lKE PATH EASEMENT
EXISTING FIELD ALIGNMENT
I
t, � j AUGUST - SEPTEHEIM 2OW
�a
LAND SURVE -
Guess Valley, CA 95945
a� ttl h
I �•`� a .� o�, .wog I
Wn �'
\ Wg ra ; r
\� w
� <x •1'� 88 ^'
�. � \i aS 3.LGLS.W.N•311 �4� _ .
dd I Oil^ ~
'f
J�„8W i
pp
• Y
,
S t �
N