Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
14 Fiberwell CEQA
Agenda ItemTRUCKEE # . . .r�y��u c1Utility District I � Memorandum To: Board of Directors From: Neil Kaufman Date: February 28,2007 Subject: Adoption of Fibreboard Well Mitigated Negative Declaration CEQA 1. WHY THIS MATTER IS BEFORE THE BOARD The District is proposing construction of the Fibreboard Well project. Prior to starting construction activities, the District is required to complete an environmental review of the proposed site in compliance with CEQA. 2. HISTORY The 2004 Water Master Plan identified a planned well site south of Interstate 80 just east of the Fibreboard Undercrossing and adjacent to the maintenance center for the Old Greenwood golf course. The District acquired an easement from East-West Partners at this location as part of the Gray's Crossing project. This location is shown in Figure 1. The project involves drilling of a new water supply well and construction of the associated well building, site piping and electrical service. In November 2006, the Board approved a contract with Inland Ecosystems to prepare an Initial Study associated with the CEQA review of the Fibreboard Well project. On January 17, the Board approved the CEQA Initial Study. The Initial Study was then circulated to responsible and interested agencies as well as to the State Clearinghouse and the Nevada County Clerk. On February 7, 2007, the Board held a public hearing to receive written and oral comment regarding the project. No comments were received at the public hearing. 3. NEW INFORMATION The 30 day time period for submitting written and oral comments on the CEQA Initial Study has elapsed. No written or oral comments have been received regarding the project.. Attached with this memorandum are the Final Mitigated Negative Declaration and Notice of Determination. Filing the Notice of Determination with the State Clearinghouse and Nevada County Clerk completes the CEQA process for the project. Page 1 4. RECOMMENDATION I recommend the Board take the following actions regarding the environmental review for the Fibreboard Well Project. 1. Adopt the Final Mitigated Negative Declaration 2. Approve the project for purposes of CEQA. 3. Approve the Mitigated Monitoring Plan. 4. Authorize the filing of the Notice of Determination with the Office of the Nevada County Clerk and the Governor's Office of Planning and Research. 5. Adopt the De Minimis Impact Finding and authorize the filing of the Certificate of Fee Exemption with the Nevada County Clerk. 6. Adopt a finding that the draft documents as circulated and the negative declaration reflect the District's independent judgment. Attachments: Notice of Determination Final Mitigated Negative Declaration Page 2 i :t i iq+ 3 f � gREBOARD f 1, e s17,7 WELL SITE ....� x' Jr 9� a £ s S _ / a (1� /M(! .:.....,.... ..L r PIF T\ fl r r f r� y F ` D ! 5 l r x'� — ^v� `- s �, i g r NORTH 4 J k NOT ALE .f-- J ? A w. ter/ � •� g m e TRUCKEE DONNER Fibreboard Well I Public Utility District Site Location Form C Notice of Determination From: To: 1 ublic Agency: Truckee Donner Public Utility District ❑ Office of Planning and Research ,Address: P.O.Box 309,Truckee,Ca.96160 For 1 .S. 19rril: Sheer,1 cich•ess: P.O.Box 3044 1400 Tenth St. Contact: Neil Kaufman Sacramento,CA 95812-3044 Sacramento,CA 95914 phone: 530-582-3950 ❑ County Clerk Lead,Agency(ifdifferent from above): County of: Nevada --_—_-- _-------- Address: 950 Maidu Avenue Address;— __ — Nevada Contact: _-- ---- Phone: SUBJECT. Filing of Notice of Determination in compliance with Section 21108 or 21152 of the Public Resources Code. State Clearinghouse Number (if submitted to State Clearinghouse): 2007012088 Project Title: Fibreboard Well Project Project Location (include county): Nevada County, within the Old Greenwood Master Planned Community, Truckee, Ca. Project Description: The purpose of the Fibreboard Well Project is to increase the Truckee Donner PUD District's water system supply capacity.The well will be located within the Old is Valley Greenwood Master Planned Community adjacent to the Natural Resource Management Center Building No.1.It will draw water from the Mart Groundwater Basin.Actual withdrawals will only increase with addl development by the Town of Truckee&Placer County.The Fibreboard well is included in& consistent with the TDPUD 2004 Water Master Plan,based on Town Mstr Pln-SCF#94092041 has approved the above described project on 'I'his is to advise that the Truckee Donner Public UtilitvDistrict Lead Agency or Kesponsible Agency and has made the following determinations regarding the above described project: (Date) — 1.The project[❑w'ill ®will not]have a significant effect on the environment. 2. An Environmental impact Report was prepared for this project pursuant to the provisions of CEQA. ® A Negative Declaration was prepared for this project pursuant to the provisions of CEQA. 3.h1itigation measures[©were ❑were not]made a condition of the approval of the project. 4. A mitigation reporting or monitoring plan[®was ❑ was riot]adopted for this project. 4.A statement of Overriding Considerations[[]was ®was not]adopted for this project. 5.Findings[®were ❑were not]made pursuant to the provisions of CEQA. This is to certify that the final EIR with comments and responses and record of project approval.or the negative Declaration, is available to the General Public at: Truckee Donner Public_Utility_District — Title General Manager Peter L Holzmeister _ Signature(Public Agency) _— -.--- ---- Date Received for tiling at OPR — Date ---------------- Authority cited: Sections 21083,Public Resources Code. Revised 2005 Reference Section 21000-21 t74,Public Resources Code. 27