Memorandum
To: Board of Directors
From: Neil Kaufman
Date: March 2, 2007
Subject: Consideration of an agreement with Sierra College regarding
construction of a pipeline extension
1. Why this matter is before the board:
Board Authorization is required for expenditures in excess of $15,000.
2. History:
There is a 10" steel pipeline that crosses Dons restaurant. Th s pipe was
ers about
Osnstal installed in tate Rote$970 and
9 South
near the Shell gas station and the McDonald
the condition of this pipe is unknown.
3. New information:
Sierra College has been pursing the construction will be from State Route 89rSouth across from the
years. Vehicle access to the new campus
Shell gas station. As part of the project, Sierra
eC ole � be constructing a pedestrian bridge
across Donner Creek just east of the existingbridge.
uits
The District discussed the possibility of installing Th potable
egeaagreeter ldeto nstaline pationtof the uttlties
within the pedestrian bridge with Sierra Collegeirection, the
provided that the District paid the costs associated withthis work.and electrical conduitAllan ngsr the
pedestrian bridge were modified to include the pipe
crossA
connecting pipeline north and south of Donner Creek was also included in the drawings.
Utility crossings of creek and rivers are often expensive adifficult nd obta permit.uch he District
should
closely examine every opportunity to partner with o projects ortuni to install a parallel
the age of the existing steel pipeThe existing p'peis prudent tcan the Den rict be reuse this movedfprom service when it fails.
pipe crossing of Donner Creek.
Potable water service to the campus will be provided from
(behind Brdge her et 6170eway storeTank l can oted ust provrth
ide
of the Downtown area. The existing Gateway Tank
sufficient pressure or fire flow to the site. A 16' pipeline near ill run along Donner
this Pass
R adtfro west
Villager Nursery under Interstate 80 to the traffic
and cross the college property adjacent to an existing overhead electrical pole line.
At my direction, a 12" pipe was included in the Sierra College drawings running from the campus site
on top of the hill down to State Route 89 So�ent water system demands. As additional h. The isting 16' and 191 pipes at eed the
growth
Gateway area are undersized with respect cu
occurs at PC-1, Donner Lake and Tahoe Donner, additional piping is needed to convey water to this
area. The need for this 12" pipe was documented in the Water System Master Plan and is shown on
Figures 7-8 and 8-1 of that document. The 12" pipe is not needed by the College, but is needed by
the District. Therefore, it is the District's responsibility to pay for installation of this pipe.
The total cost to the Water Department for this piping is estimated at $200,000. The 12" pipe down
the hill and across State Route 89 would be paid by Facility Fees. The Donner Creek crossing would
be paid by rate monies. The college is currently advertising for bids and the bid opening is scheduled
for the middle of March. Once the bids are opened and the low bidder is determined, I will be able to
provide a firm cost to the Board
4. Recommendation:
There is no recommendation at this time. Once the bids are opened and a final cost is
determined, I will return to the Boarwill construct and rthe piping end that �ndrthe District wilict enter into al pa agree
thamcostwith
Sierra College whereby the college
Attachments:
Figure 1