HomeMy WebLinkAbout8 Transformer Bid Agenda Item #8 TRUCKEE DONNER Public Utility District Memorandum To: Board of Directors From: Sanna Schlosser, Associate Electrical Engineer Date: March 15, 2007 Date of Board Meeting: March 21, 2007 Subject: Transformer Bid Award Recommendation 1. WHY THIS MATTER IS BEFORE THE BOARD Only the Board can approve bid awards. 2. HISTORY The District's annual purchase of transformers is required to meet our customer obligations and the purchase has been budgeted. Last year we had a discussion of the differences between biodegradable dielectric and traditional mineral oil based dielectric fluid. The board decided to use biodegradable oil in the pad mounted and pole mounted single phase transformers (Schedules A and B) for the contract. 3. NEW INFORMATION Again this year we have asked vendors to bid on two different types of dielectric fluid for each transformer: standard, petroleum-based mineral oil, and biodegradable, seed-based oil. I will be happy to address any questions you have about the differences between the oils. We have also made some changes to our material specifications regarding maximum and minimum dimensions as well as specifying a minimum bushing height. These changes came from field feedback and are an attempt to address some issues we have had with our previous contract. These new requirements ensure that the transformers supplied to us will work with the concrete pads we currently use and will allow us to make connections in a safe manner. Bids have been opened and analyzed for the District's purchase of transformers. Attached are summaries of the bid information received. The bid results show the description and quantity of transformers required, vendor name, dielectric fluid type, quoted price, delivery time, and any noted exceptions to our bid requirements. The following factors were used in determining the successful bidder: price, adherence to our contract and specifications, and delivery time. The lowest bid price was determined by the Total Owning Cost (TOC) formula calculation. The TOC is equal to the sum of the Unit Price plus the cost of No Load Losses plus the cost of Load Losses. The TOC calculation allows the District to determine the transformers with the lowest overall ownership costs, which may not always correspond to the lowest unit prices. The low bidder for a category type will be determined by the summation of the TOCs for all transformers within that category, based on a quantity of one (1) for each transformer. The TOC prices and low bidders are depicted in Table 1. Adherence to our contract and specifications is very important, however minor deviations from our specifications may be permitted based on our review of the particular situation. Delivery time, however, is very critical due to our short construction season. We are frequently faced with the need to utilize transformers in quantities that we do not have in stock and as a result are required to go out to bid. Bidding each and every time is an expense to the District and increases the time it takes to purchase transformers. For this reason, we requested pricing to be good for a period of one year, from 3/1/07 through 3/1/08. The contract prices shown on the attached Bid Award Recommendation table are good for orders placed until 6/30/07. After this time, our contract allows the vendors to calculate and apply escalation /descalation percentages to transformer prices once per calendar quarter until the end of the contract period. 4. RECOMMENDATION We believe the advantages of biodegradable oil justify its increased cost compared to traditional mineral oil filled transformers. Therefore we recommend, in decreasing order of preference, the following bid award options for the Board's consideration: Option 1: 1 recommend the Board approve the use of biodegradable oil for all District transformers and award Schedules A, B, C and D to the biodegradable oil transformer vendors as shown on the attached Bid Award Recommendation table with pricing good for 1 year, subject to 3 quarterly escalation/descalation price adjustments until the end of the contract period. Option 2: 1 recommend the Board approve the use of biodegradable oil for single phase polemount and padmount transformers and award Schedules A and B to the biodegradable oil transformer vendor and Schedules C and D to the mineral oil transformer vendors as shown on the attached Bid Award Recommendation table with pricing good for 1 year, subject to 3 quarterly escalation/descalation price adjustments until the end of the contract period. Option 3: 1 recommend the Board award Schedules A, B, C and D to the mineral oil transformer vendors as shown on the attached Bid Award Recommendation table with pricing good for 1 year, subject to 3 quarterly escalation/descalation price adjustments until the end of the contract period. TABLE 1 - TRANSFORMER BID RESULTS Evaluated Price Comparison - Total Owning Cost (TOC) Key: Recommended Bid �µ ` �,, .'No Bid Low bid but does not meet contract requirements Schedule A - Single Phase Polemount Transformers Mineral Oil Sched Cooper WESCO GE Howard Moloney ERMCO Al $1,591.41 $2,039.22 $2,361.21 $1,830.75 $2,073.56 $1,860.86 A2 $1,993.95 $2,555.45 $2,436.83 $2,209.89 $2,813.37 $2,403.14 A3 $2,008.38 $2,505.93 $2,527.13 $2,380.23 $2,780.55 $2,350.31 A4 $2,728.68 $3,050.74 $3,498.24 $2,853.99 $3,253.14 $2,821.97 A5 $1,597.88 $2,168.25 $2,456.70 $1,941.98 $2,210.57 $1,926.69 A6 $2,205.73 $2,651.32 $3,201.39 $2,494.93 $2,918.37 $2,483.04 A7 $2,777.68 $3,100.14 $3,804.17 $3,019.18 $3,279.08 $2,950.56 $14,903.71 $18,071.05 $20,285.68 $16,730.96 $19,328.64 $16,796.58 Biodegradable Oil Sched Cooper WESCO GE Howard Moloney ERMCO Al $1,668.41' —.,.1 $1,862.88 $2,148.56 $2,175.59 A2 $2,097.28` $2,277.94 $2,958.37 $2,788.94 A3 $2,078.98 $2,434.81 $2,930.55 $2,806.26 A4 $2,850.89 $2,835.39 $3,458.14 $3,245.25 A5 $1,684.67 ; $2,003.72 $2,285.57 $2,218.12 A6 $2,102.94. $2,551.64 $3,063.37 $3,045.25 A7 L $3,165.42 $3,073.71 $3,479.08 $3,863.40 $15,648.60 $17,040.09 $20,323.64 $20,142.82 Schedule B - Single Phase Padmount Transformers Mineral Oil Sched Cooper WESCO GE Howard Moloney ERMCO B1 $2,298.52 $3,089.78 $2,458.35 $2,166.50, $2,624.71 B2 $3,082.25 $3,461.66 $3,543.34 $3,225.73 ; $3,464.28 B3 $3,880.38 $4,487.88 $5,598.09 $4,474.99 $4,770.47 B4 $4,696.86 $5,184.94 $7,098.43 $5,317.36i $5,934.89 B5 $2,610.01 $3,663.96 $4,091.51 $2,907.41 '` } $3,175.59 B6 $3,363.97 $3,991.48 $5,147.17 $3,962.26 $4,030.68 $19,932.00 $23,879.71 $27,936.89 $22,054.27ya $24,000.62 Biodegradable Oil Sched Cooper WESCO GE Howard Moloney ERMCO B1 $2,517.09 $2,234.71 $3,039.79 B2 $3,362.76 _ e $3,288.51 $3,951.28 B3 $4,217.59 � " � $4,521.95' $5,542.58 B4 $5,120.72 $5,404.56 , $7,234.65 B5 $2,861.88 $2,997.20 $3,971.39 B6 $3,654.65 $4,083.27 $4,946.02 $21,734.70 $22,530.21q $28,685.70 3/16/2007 Page 1 of 2 Schedule C - Three Phase Padmount Trans. 120/208v Mineral Oil Sched Cooper WESCO GE Howard Moloney ERMCO C1 $7,947.37 $7,462.81 $8,208.42 $6,690.03 _. $7,598.52 C2 $8,946.19 $8,519.56 $9,028.14 $7,831.90 $8,639.74 C3 $10,016.09 $9,985.17 $10,828.75 $8,728.87 $9,907.71 C4 $10,950.56 $10,919.33 $11,398.00 $10,772.50� i $11,475.84 C5 $13,101.38 $13,418.60 $14,126.99 $14,058.78 $14,095.52 C6 $15,086.96 $15,490.74 $15,902.35 $16,901.66 $16,232.22 C7 $20,938.03 $21,174.14 $22,209.10 $23,731.21 $21,872.62 C8 $28,939.60 $28,886.98 $30,038.30 $30,098.63 $28,612.53 $115,926.17 $115,857.34 $121,740.05 $118,813.58 ,,m _ $118,434.70 Biodegradable Oil Sched Cooper WESCO GE Howard Moloney ERMCO C1 $8,718.36 , $6,890.13 $9,149.76 C2 $9,747.93 $8,070.07 $10,261.14 C3 $10,844.77� $8,896.78 � $11,715.56 C4 $12,116.40 $10,935.07` „ '" $13,591.84 C5 $14,057.00. � $14,106.43 =` $16,354.71 C6 $16,128.33 � $16,821.31 .° $18,660.56 C7 $22,534.73' $23,186'14 $24,635.84 C8 $31,062.13= . $30,837.40 `� .. $33,185.18 $125,209.65 � ��_ $119,743.34 _ $137,554.58 Schedule D - Three Phase Padmount Trans. 277/480v Mineral Oil Sched Cooper WESCO GE Howard Moloney ERMCO D1 $7,979.23 $7,845.50 $8,542.33 $6,689.85 a $7,725.10 D2 $8,974.76 $8,661.20 $8,954.30 $7,654.45 � � �,� $8,647.21 D3 $9,903.04 $9,932.31 $10,876.05 $9,379.22 ice ' $9,852.91 D4 $10,852.81 $10,680.74 $11,411.26 $10,508.22 $11,299.93 D5 $12,975.39 $13,494.34 $14,479.20 $13,319.871 $13,663.18 D6 $14,621.37 $15,929.84 $15,918.98 $15,775.27 $15,441.58 D7 $19,716.68 $20,568.99 $20,253.19 $21,219.37 $20,635.48 IDS $28,002.47 $28,138.73 $27,570.93 $27,209.05, $27,127.85 D9 $32,847.44 $34,068.44 $34,160.00 $34,321.77 $32,508.33 $145,873.18 $149,320.09 $152,166.22 $146,077.08 ; $146,901.58 Biodegradable Oil Sched Cooper WESCO GE Howard Moloney ERMCO D1 $8,748.97 $6,893.17 $9,202.67 D2 $9,773.50 w„ $7,883.61 $10,248.21 D3 $10,822.78. �' $9,655.62 $11,635.32 D4 $11,524.82 0,817.46 $13,383.03 D5 $13,895.11 $13,674.69 $15,963.18 D6 $15,829.77 $16,171.61 $17,909.68 D7 $21,180.65. $21,739.42 $23,563.88 D8 $30,160.98 $27,727.48 $31,769.85 D9 $35,444.11 $35,162.65 $37,539.33 $157,380.68 � .. �. R $149,725.72 $171,215.16 3/16/2007 Page 2 of 2 2007 TRANSFORMER BID AWARD RECOMMENDATION Contract Period 3/1/07 to 3/1/08 MINERAL OIL BIODEGRADABLE OIL Order Contract Extended Contract Extended Bio Type Schedule Qty Price Price Price Price + % Polemount - 1 Ph. Cooper Cooper 25 kva Al 2 $966.00 $1,932.00 $1,043.00 $2,086.00 7.4% 37.5 kva A2 4 $1,174.00 $4,696.00 $1,392.00 $5,568.00 15.7% 37.5 kva A3 $1,216.00 $0.00 $1,338.00 $0.00 9.1% 50 kva A4 3 $1,871.00 $5,613.00 $2,062.00 $6,186.00 9.3% 25 kva A5 $980.00 $0.00 $1,120.00 $0.00 12.5% 37.5 kva A6 $1,461.00 $0.00 $1,424.00 $0.00 -2.6% 50 kva A7 1 $1,920.00 $1,920.001 $2,397.00 $2,397.00 19.9% $14,161.00 $16,237.00 12.8% Padmount, 1 Ph. Cooper Cooper 25 kva 131 $1,719.00 $0.00 $1,948.00 $0.00 11.8% 50 kva 132 $2,185.00 $0.00 $2,485.00 $0.00 12.1% 75 kva 133 $2,696.00 $0.00 $3,023.00 $0.00 10.8% 100 kva 134 1 $3,216.00 $3,216.00 $3,598.00 $3,598.00 10.6% 25 kva 135 1 $2,046.00 $2,046.00 $2,296.00 $2,296.00 10.9% 50 kva 136 6 $2,406.00 $0.00 $2,696.00 $0.00 10.8% $5,262.00 $5,894.001 10.7% Padmount, 3 Ph. 120/208v Cooper Cooper 45 kva C1 2 $7,053.00 $14,106.00 $7,801.00 $15,602.00 9.6% 75 kva C2 2 $7,616.00 $15,232.00 $8,414.00 $16,828.00 9.5% 112.5 kva C3 2 $8,200.00 $16,400.00 $9,024.00 $18,048.00 9.1% 150 kva C4 1 $8,526.00 $8,526.00 $9,768.00 $9,768.00 12.7% 225 kva C5 1 $9,946.00 $9,946.00 $10,647.00 $10,647.00 6.6% 300 kva C6 $10,966.00 $0.00 $11,715.00 $0.00 6.4% 500 kva C7 1 $14,557.00 $14,557.00 $16,253.00 $16,253.00 10.4% 750 kva C8 $20,099.00 $0.00 F-$22,244.001 $0.00 9.60 $78,767.00 1 $87,146.00 9.6% 277/480v Cooper Cooper 45 kva 131 2 $6,997.00 $13,994.00 $7,763.00 $15,526.00 9.9% 75 kva D2 1 $7,596.00 $7,596.00 $8,391.00 $8,391.00 9.5% 112.5 kva D3 $7,955.00 $0.00 $9,004.00 $0.00 11.7% 150 kva D4 1 $8,464.00 $8,464.00 $9,314.00 $9,314.00 9.1% 225 kva D5 $9,917.00 $0.00 $10,689.00 $0.00 7.2% 300 kva D6 $10,440.00 $0.00 $11,788.00 $0.00 11.4% 500 kva D7 1 $13,599.00 $13,599.00 $15,110.00 $15,110.00 10.0% 750 kva D8 $20,071.00 $0.00 $22,028.00 $0.00 8.9% 1000 kva D9 $21,955.00 $0.00 $24,690.00 $0.00 11.1% $43,653.00 $48,341.00 9.7% Notes: 1. Prices are effective until 6/30/07. Thereafter, prices are subject to escalation every quarter until the end of the contract. 2. " Bio+V - Percentage price difference between Low Bid Biodegradable Oil and Low Bid Mineral Oil filled transformers. ili Fignm