HomeMy WebLinkAbout10 Old Greenwood Well project Agenda Item # 10 UCKEE DONNER Public Utility District Memorandum To: Board of Directors From: Ed Taylor Date: April 2, 2007 Subject: Final Completion and a Closeout Change Order for the Old Greenwood Production Well Project 1. WHY THIS MATTER IS BEFORE THE BOARD: The Old Greenwood Production Well project is complete. A closeout change order and a resolution accepting the project require Board approval. 2. HISTORY The Board previously awarded the Old Greenwood Production Well project to WDC Exploration & Wells. No project change orders have been previously brought to the Board for approval. 3. NEW INFORMATION The Old Greenwood Production Well Project is now complete. I am requesting a Closeout Change Order to the Contract for issues under 9 general items that will cover all of the change order issues that arose during this project. Item 1: Contract item, (3) A Drill, Log, and Sample Borehole. Extra Work — Because of on for seen conditions, an extra 14 days of Labor, additional materials, and fuel were required to complete the project. This resulted in an additional $29,392.40 of Labor, an additional $41,928.62 of Material, and an additional $19,600 of fuel. This resulted in an additional cost of $90,921.00. Item 2: Contract item, (3) B. Drill, Log, and Sample Borehole, Extra Depth — An additional 90 feet of well was drilled. This resulted in an addition cost of $8,820.00. Item 3: Contract item, (4) Furnish and install casing and screen blank — An additional 50 feet of casing was furnished and installed. This resulted an additional cost of $3,400.00. Page 1 Item 4: Contract item, (7) - Furnish and Install 3-inch Gravel fill pipe from ground level to 310 feet. This resulted in an increase in the amount of $3,410.00. Item 5: Contract item, (8) — Furnish and Install gravel pack — 1300 feet to 310 feet. This is a 130 feet decrease in gravel pack. This resulted in an decrease amount of $5,070.00. Item 6: Contract item, (11) — Development by surge block & water jetting & air lifting. This is a decrease of 41 hours. This results in a decrease of $15,990.00. Item 7: Contract item, (14) — Dispersing chemicals for well development. This item was not used in the development of the well. This results in a decrease of $1,140.00. Item 8: Contract item, (15) — Chemical, calcium Hypochlorite, used for development. This item was not used in the development of the well. This results in a decrease of $200.00. Item 9: Contract item, (16) — Chemical, Sulfuric Acid, used for development. This item was not used in the development of the well. This results in a decrease of $290.00. 4. RECOMMENDATION a) I recommend that the Board authorize Contract Change Order #1, In the amount of an $83,861.00 addition of the contract amount to WDC Exploration &Wells. b) I recommend that the Board pass a Resolution accepting the Old Greenwood Pump Production Well Project as complete and authorizing the filing of the notice of completion. Attachments: Change Order Form Resolution Page 2 DONNER Final Change Order Contract Name: Old Greenwood Production Well Contract Change Order No: 1 Ong. Contract Amt $ 494,530.00 Days NA Date: March 29,2007 Prev.Apprd Changes$ _ 0,00 Days NA Contractor: WDC Exploration&Wells This Change$ 83,861.00 Days NA Revised Contract Amt.$ 578:391.00 Days NA This Change Order covers changes to the subject Contract as described herein. The Contractor shall construct, furnish equipment and materials, and perform all work as necessary or required to complete the Change Order Items for a lump sum price agreed upon between the Contractor and District. Increase in (Decrease) Contract Contract in Contract Time Description of Changes Amount $ Amount M Extension 3A -Drill, log,and sample borehole, Extra Work $90,921.00 38 -Drill log,and sample borehole,Extra Depth $8,820.00 4-Furnish and install casing and well screen blank,low-carbon steel including welding collars.ASTM A53(est.620 ft), 18-inch x 0.312-inch wall. Furnish and install 100-ft cement seal(linear/ft) $3•400.00 7—Furnish and install 3-inch gravel fill pipe from ground surface to 310 ft $3,410.00 depth. 8—Furnish and install gravel pack 1,300 ft to 310 ft(linear/ft) -$5,070.00 11—Development by surge block water/chemical jetting and air-lift pumping, 415,990.00 (est.80 hrs.) 14-Dispersing chemicals. NW220 or similar non-phosphate approved -$1,140.DQ dispersant(est,300 lbs) 15-65-70%granulated calcium hypochlorite(est.50 Ibs) -$200.00 16-Sulfamic Acid -$290.00 Totals $106,551.00 -$22,690.00 Net change in contract amount(increase or decrease) $83,861,00 Portion of change order previously approved and paid $0.04 Total Amount Owing(New Contract Amount less previous payment $106,551.00 applications) The amount of the Contract will be increased by the sum of$83,861.00 and the Contract Time shall not be extended. The undersigned Contractor approves the foregoing Change Order as to the changes:if any,in the contract price specified for each item including any and all supervision costs and other miscellaneous costs relating to the change in work, and as to the extension of time allowed, if any,for completion of the entire work on account of said Change Order, The Contractor agrees to furnish all labor and materials and perform all other necessary work, inclusive of the directly or indirectly related to the approved time extension, required to complete the Change order items. This document will become a supplement of the contract and all provisions will apply hereto. It is understood that the Change Order shall be effective when approved by the District. Contractor agrees that the Revised Contract Amount set forth above constitutes the full amount due Contractor under the Contract for all labor, equipment, materials and other costs, including all claims set forth in Contractor's Request or Equitable AdjustrQar* Accepted: �y �� ,-r f,'''�r.''' iContractor. Date: (Signature) ' Approved: 0strict Date: (Signature) I �I III I�I�I III I IIIII 1111 TRUCKEE I O •R Public Resolution No. 2007 - XX AUTHORIZING THE ACCEPTANCE OF OLD GREENWOOD WELL DRILLING PROJECT AND DIRECTING FILING OF THE NOTICE OF COMPLETION WHEREAS, the Board of Directors of the Truckee Donner Public Utility District made the determination to undertake the Old Greenwood Well Drilling Project; and W HEREAS, W DC Exploration &Wells., was selected by the District to perform the work; and WHEREAS, WDC Exploration &Wells, has completed all of the Work included in the Project; and WHEREAS, The District's Consultant, David Carlson, now certifies the completion of the project; and WHEREAS,the District's Water Utility Manager, Ed Taylor, has recommended that the work be accepted by the District; NOW THEREFORE BE IT RESOLVED by the Board of Directors of the District as follows: I. That the District hereby accepts the Old Greenwood Well Drilling Project as complete. 2. That the Clerk of the District be directed to file with the County of Nevada the Notice of Completion, a copy of which is attached hereto. 3. That 35 days following the filing of the Notice of Completion, the monies retained from the contractor payments be released to the contractor if no claims have been made to the District by material suppliers or laborers. PASSED AND ADOPTED by the Board of Directors at a meeting duly called and held within the District on the 4tn day of April 2007 by the following roll call vote: AYES: NOES: ABSTAIN: ABSENT: TRUCKEE DONNER PUBLIC UTILITY DISTRICT By Tim F.Taylor, President of the Board ATTEST: Peter L. Holzmeister, Clerk of the Board RECORDING REQUESTED BY: Truckee Donner Public Utility District WHEN RECORDED, RETURN TO: TRUCKEE DONNER PUBLIC UTILITY DISTRICT Post Office Box 309 Truckee, CA 96160 THE UNDERSIGNED DECLARES DOCUMENTARY TRANSFER TAX- NONE NOTICE OF COMPLETION NOTICE IS HEREBY GIVEN: 1. That the name and address of the public entity for whom the improvement project was done, as owner thereof, is the Truckee Donner Public Utility District, Post Office Box 309, Truckee, CA 96160. 2. Nature of interest or estate of owner: beneficial interest of a public utility easement for installation of water facilities. 3. That on April 4, 2007 the hereinafter described improvements were accepted as complete pursuant to Resolution 2007-XX of the Truckee Donner Public Utility District, the awarding authority. 4. That the subject improvements of the Notice are generally described and identified as follows: Drilling of a potable water production well completed to a depth of approximately 1,300 feet located at 12701 Fairway Drive, Old Greenwood Development, Truckee, Ca. and APN 19-720-04. 5. That the name and address of the contractor for such project was: WDC Exploration &Wells,580 W. Silver Street, Elko, Nevada 89801. 1 certify under penalty of perjury under the laws of the State of California that the foregoing is true and correct. Dated: TRUCKEE DONNER PUBLIC UTILITY DISTRICT By Peter L. Holzmeister, General Manager MAIL TAX STATEMENTS TO: SAME AS ABOVE Legal References: CC-3093,CCP-2003 (oath), 2015.5 (unsworn statement)