HomeMy WebLinkAbout11 Pioneer Drive Overhead Distribution Agenda Item # 11 sUCKEE • Memorandum To: Board of Directors From: Joe Horvath, District Electrical Engineer Date: March 29, 2007 Date of Board Meeting: April 4, 2007 Subject: Proposed 4 Pole Overhead Distribution Line on Pioneer Drive 1. WHY THIS MATTER IS BEFORE THE BOARD The Board requested that this matter be brought to their attention for a decision. 2. HISTORY Approximately 75 percent(135 miles) of the District's electric distribution system is composed of overhead facilities using wood pole structures. The overwhelming majority of these overhead lines have been constructed along road rights-of-way. There are some areas of the District where overhead lines follow back yard easements including sections of Prosser Lakeview Estates and Sierra Meadows. These are typically single phase tap lines, not three phase main lines. However, there is a area in Donner Lake where a three phase main line cuts across a hillside for approximately 2,000 feet with no easy means of access (see attached Figure 1). The only access to these structures is on foot, which makes outage restoration or maintenance extremely problematic. In order to eliminate these structures, the Electric Department has performed the following actions, briefly summarized below: • Joint Trench with Water Department: In 2004, the Water Department installed a 12inch mainline from the Cedar Point Dr. area to the intersection of Denton Avenue and Pioneer Drive. We had their contractor install a 6 inch conduit and several vaults along this route for a distance of about 2,600 feet. Our portion of the cost was approximately$160,000. This underground system would form the new mainline circuit necessary to replace overhead cross country line. However, a gap existed because our east side electrical connection must occur at the intersection of Reed Ave. and Pioneer Drive, a distance of about 600 feet along the Pioneer Drive right-of-way. • Cedar Point Dr. and West Reed Ave: During 2005 and early 2006, crews installed a padmount switch at Cedar Point Dr. and riser facilities on West Reed Ave. to complete the west and south side underground connections. Crews also started to pull cable into the conduit system. The cost to install these facilities is approximately$110,000. • Pioneer Drive Connection: On the east side of the project, the 600 foot gap along Pioneer Drive, between Denton Ave. and the District's existing 3 phase overhead line at the intersection of Reed Ave. and Pioneer Drive must be closed to complete the mainline circuit connection. Possible construction options included a 4 pole overhead line, an underground line requiring 2 vault structures, or a cross country connection to Reed Avenue. Any cross country connection to Reed Avenue is problematic because it requires the establishment and clearing of new right-of-way along a fairly steep wooded hillside. It has been the District's practice to use established right-of-way corridors, typically road right-of-ways, for the placement of electric facilities as much as possible. This is the preferred method of locating utility facilities because it minimizes associated utility impacts. The underground option along Pioneer Drive was rejected for a number of reasons, including the fact that the District will have spent approximately $270,000 to underground a majority of this route already, taking advantage of joint trenching opportunities with the Water Department. Although the Water Department placed new line in this 600 foot section of Pioneer Drive in 2005, it was installed using slipline, not trench construction methods. This roadway section of Pioneer Drive is narrow, and already contains underground facilities including a water, natural gas and sewer lines. An underground electric conduit and vault system could be installed, but not without great difficulty. Because this neighborhood is an existing overhead electric line area, and sufficient right-of-way and road shoulder areas exist to place pole structures, the overhead pole line alternative was chosen as the best option. 3. NEW INFORMATION In September, 2006 the District engaged Sage Land Surveying to stake the 600 foot section of Pioneer Drive right-of-way between Denton and Reed Avenues. Following the staking of the road right-of-way, the District engaged Harrison Tree Service to clear a 10 foot section road shoulder area (well within the road right-of-way) of trees and brush necessary to build the overhead pole line. I was then contacted by residents in this neighborhood who were concerned because they were depending on some of the trees and brush, which we had removed, to keep their vehicles from sliding over the road embankment during winter weather. They also had questions about placement and alternatives to the proposed overhead line. Some of these residents brought their concerns to a Board meeting in December, 2006. At this meeting, the Board asked that the proposed overhead line extension be agendized for future meeting. 4. RECOMMENDATION Chapter 7.48, Section 7.48.010 of the District's policies states: It shall be the policy of the Truckee Donner Public Utility District to require all new or rebuild construction to be placed underground wherever practical. Special circumstances may dictate undergrounding is not practical and the District reserves the right to determine the practicality of a rp oiect. The installation of overhead electrical facilities to serve single-family dwellings, within an existing overhead subdivision, shall be permitted. All multi-family dwellings, commercial buildings and land parcels that are to be divided into four or more individual lots, shall require the installation of underground facilities regardless of location. Therefore, because of the reasons outlined above and in concurrence with District Policy, I recommend that the Board direct staff to proceed with the construction of a 4 pole overhead distribution line on Pioneer Drive between Denton and Reed Avenues. t ti� T i I 1 rr� a. ' ? 9 b Pioneer Drive —View is to the west from the intersection of Reed Avenue and Pioneer Drive. Note the 3 phase overhead line on Reed Avenue. Pioneer Drive —View is to the east from the intersection of Denton Avenue and Pioneer Drive. �:r \ y� : 3.. . .a Pioneer Drive—Aerial view of the Sued area depicting the heavy tree cover. FT to! _� •i 1 tear '1p Alz �` � d• s� \ `fB �1� � rb,S -� x�s rA6� r>'��r� °� �,E� b :+ �� a ll '611; �� � k i ply ri gib u'4 `,F M 'W * iM1K M'6 ' rvNfiea gy 1 a a r w rl 1 1 p1,IRV 1 � loft t r' Fa; � � F� eC � 1��.•.- ,j, �y � Ffr at , t 7 f t O 1 9 i AW gy4"1") p. Page 1 of 1 On Sat Mar 31 14:53 , 'susan Lindstrom' <sindstrom@cebridge.net>sent: Dear Neighbors; On Wednesday, April 4th, the TDPUD will present to the Board their plans to construct a new overhead power line along Pioneer Drive. The meeting will be held at 7pm at the TDPUD office at 11570 Donner Pass Road. This is our only opportunity to make our presence known and voice our opinions. Your attendance could make a real difference in the outcome of the Boardbi 's decision. *PETITION TO THE TRUCKEE-DONNER PUD BOARD OF DIRECTORS The TDPUD is planning to construct a new 600-foot overhead power line on Pioneer Drive between its intersections with Reed and Denton avenues in order to connect with an existing underground line installed at the hairpin curve a few years ago. This new overhead line will replace the existing overhead line down Reed Avenue. In anticipation of construction of the new overhead line, the PUD has already clear-cut trees within a 10-to 20-foot-wide corridor. Pro e-ow_ners were not given a chance to__comment on this project during_its planning_stages,_and we ar_e requesting that opportunity now.. Accordingly, we the undersigned ask the PUD to either explore an alternative route for their new overhead line or underground the new line, so as not to: (1) hinder snow removal along this section of road; (2) compromise the ambience and character of our neighborhood thoroughfare; or (3) degrade our viewshed of Donner Lake and, thereby, diminish property values on our road. Name (p rint) Physical Address Signature Date _Richard Ginn _14615 Denton Ave R.S Ginn 3/31/07 We invite all persons in your household that are of voting age to sign this petition. You can print out and sign this petition and return via fax (530-587-7083) or drop off your petition into the envelope posted to the garage at 14931 Denton Avenue or you can just email (slindstrom.@cebridge.net) or call (530-587-7072) with a reply of support. Remember,your response must be received before Wednesday,April 4tn a/11 /7n07 Mar 31 07 01 : 10P Raymond Plock a Associate 1 -510-655-7353 P• 1 PETITION TO THE TRUCKEE-DONNER PUD BOARD OF DIRECTORS The TDPt D is planning to construct a new 600-foot overhead power line on Pioneer Drive between its intersections with Reed t and Denopin curve avenues i ord order r ago. ne st with new an existing underground l ne installed overhead line will replace the existing overhead line down Reed Averue. in anticipation cf co!istructien of the new overhead line, the PUD has already clear-cut trees within a 0- to 20-foot wide corridor. Pro ert owners were not iven a chance to comment on tl js Nrc�'ect durin its tannin staues and we are reauestinc that op rtuni no for w. Accorcingly, we the understgned ask the PUD to either explore an alternative ro sr ow their new overhead Vne or underground the new ine, so as not to: t1, removal along thorou hfareoor(3) degrade ournviewshed ofDonn ear rLake and,thereby, neighbonccod g d minish property values on our road. i n ti r Date Name S (print Physical Address 9 3/3r f p� Dear Neighbors; On Wednesday, April 4°', the TDPUD will present to the Board their plans to construct a new overhead power line along Pioneer Drive. The meeting will be held at 7pm at the TDPUD office at 11570 Donner Pass Road. This is our only opportunity to make our presence known and voice our opinions. Your attendance could make a real difference in the outcome of the Board's decision. *PETITION TO THE TRUCKEE-DONNER PUD BOARD OF DIRECTORS The TDPUD is planning to construct a new 600-foot overhead power line on Pioneer Drive between its intersections with Reed and Denton avenues in order to connect with an existing underground line installed at the hairpin curve a few years ago. This ne%v overhead line will replace the existinq overhead line down Reed Avenue. In anticipation of construction of the new overhead line,the PUD has already Gear-cut trees within a 10-to 20-foot-wide corridor. Propedy owners were not given a chance to comment on this proiect during its planning stages, and we are requesting that opportunity now. Accordingly, we the undersigned ask the PUD to either explore an alternative route for their new overhead line or underground the new line, so as not to: (1) hinder snow removal along this section of road; (2) compromise the ambience and character of our neighborhood thoroughfare; or (3) degrade our viewshed of Donner Lake and, thereby, diminish property values on our road. Name(print) Physical Address signal Date Ri- ran L°� v ! sr3 ZE'.ri We invite all persons in your household that are of voting age to sign this petition_ You can paint out and sign this petition and return via fax(530- 587-7083) or drop oft your petition into the envelope posted to the garage at 14931 Denton Avenue or you can just ernaii �lindstro gUr4doe.netl or call (530-587-7072)with a reply of support. Remember,your response must be received before Wednesday, April r a u i I T jPUD New Overhead tower Line retttton Reminder: AOL-MA never ask You to send u5 your password or credit card twmb¢r In an emaN. ThK MOW has been scam for known viruses 1•rom: slindetromiaCeDridpe.net i m, To: annamavadamont01MM$n.iom, rpurtfadmen corn, 5u9an.Dan S acoo1ey®csus du,du• stsnQtdla�diruat.orp treddoAosbridge.net t Subject: TDPUD Now Overhead Power tine Pet"ion Dab: Sat,31 Mar 2007 11 53 AM Dear Neighbors; eir plans to On Wednesday, April 0 ,the TDPUD will present to the Board t at he TOPUDnOffwe at 1struct 8 1570 Donne power line a" Pioneer Drive. The meeting vAll be he opinions. Your Pass toad. This is our only opportunity to make our presence known and voice our attendance could make a real difference in the outcome of the Board's decision. *PETITION TO THE TRUCKEE•DONNER PUD BOARD OF DIRECTORS The TDPUD is planning to construct a new 800-foot overhead power fine on Pioneer Drive between its intersections with Reed and Denton avenues in o order Thi to conned overhead line will replace the exiatunderground ling installed at the hairpin curve a few years a9 overhead line down Reed Avenue. in anticipation to a corridor t?ro e_ t truction of the new e not giver+..a has already in s 10- to 2 clear-cut trees with es Ind we ark +-eg-q M- lg.that- oMunity chance to comment on tnis..g91e S dunr its.pia rnn sty--�. ._.- rn for their now — naw. Accordingly, we the undersigned u tshpe motto: (1) hinder snow either explore an aremoval alongehis section e overhead tine or underground the new of our neighborhood thoroughfare; or (3) degrade road; (2 compromise o Donner Lake ambience thereby,di propel values on our road. pt}r vi phy3kal Address Name (Print) Signature fete CIAX t"Tt70� 47- ; ' ,4+ti2 4 T � za4 -��' ., in our household that are of voting age to sign this petition. You can pant out and sign ,Ne invite all persons i, Y posted to the garage at this petition and return via fax(530-581-7083) or drop off your petition into the envelope 14931 Denton Avenue or you can just email Wiivsd berme W nesnday,° ,a4u;530-5g7 70T2j with a reply of Support. Remember, your response must be received 4/1/2007 http://webmail,wi.con/24126/aol/en-us/maiUdisplay-message.aspx i:cvp 510-799-0798 P• 2 'box=lnbos&Msgld=.. AT&T Yahoo!maii-riconatori'yahoc.com http:;ius.f336.mai:.yahoo.corn'ym/ShowLetter . C? Print.Close Window 3-f MAIL hL < From: "susan Lindstrom" <slindstrom@cebridge.net> "'AnnaMaria Damonte'" <annamahadamonte@msn.com>, courtfarrel@msn.com, Susan,Daniels@cbnorcal.com, fred dog ceb .nlcoolh edu, stan@tdlandtrvst.org, kjensen@surewest.net, vdrury@yoo. , any el, ayo0Dm, schoenwalds@hotmaii.com, bkinghomQes@ SA a is-tv,i�ekCp ters@endea�bcomet, Bra inbrabec@aol.corn,Timber_PoppYCY dddclan@sbcglobai.net, Denise.VanBeek@Idcpfi.com, rginn@cebridge.net, cmardhQaoi.com, jucdbonsai@starstream.net, alpenglowclean agmail.com,joancritt@hotmail.com, To: jis@tahoearchitect.com, Chiarenza@aol.com, Karen@usasa.org, k.witt.789@cebridge.net, KathyreeverKing@usamedia.tx, swbk@hotmail.com, eokengdiFrc nti Ischroers@tusd.rnet, kori@Itol.com, lindam.sanford@9ma is it @hom ail.com, miller@usamedia.ty, pjamsden@earthlink.net, rplock@pluck-associates.com, riconato@yaheo.com, stonesoupdesigns@sbcgobai.net, rorr.o625@earthlink.net, eski@cebridge.net, smcooley@verizon.net, slindstrom@cebridge.net, kalmanl@comcast.net, norm u nhbn.reno.nv.us Subject: TDPUD New Overhead Power Line Petition Date: Sat, 31 Mar 2007 11:53:09 -0700 Dear Ne!ghbors; On Wednesday,April 41n, the TDPUD will present to the Board their plans to construct a new overhead power line along Pioneer Drive . The meeting will be held at 7pm at the TDPUD office at 11570 Donner Pass Ro . This is our only could make a real difference Into make our the outcome oresence known and f the Board' decision.oice our opinions. Your attendance *PETITION TO THE TRUCKEE-DONNER PUD BOARD OF DIRECTORS The TDPUD is planning to construct a new 600-foot overhead power line on Pioneer Drive between its intersections with Reed and Denton avenues in order to connect with an existing underground line installed at the hairpin curve a few years ago. This new overhead line will replace the existing overhead line down Reed Avenue . in anticipation of construction of the new overhead rlliine, the vPUD n a y oy has alreacy clear-cut trees within a 10- to 20-oot- idetaoe ld and we re re ue Vners ✓ei urn chance to comment on this ro'ect d ri it now• Accordingly, we the undersigned ask the PUD to either ex plere an alternative route for their new overhead line or underground the new line, so as not to: (1)hinder snow removal along this section of road; (wshed of DonnerhLake and thereby, diminish property and character of our values on our roarhood thoroughfare; or (3) deg rade our vie Name (print) Physical Address Signature Date ; 2- w ddP. r, 9fd16/ �p -0/r,67 /�9b3 3/31107 lOi35 PM1 I of i Dear Neighbors; 4n Wednesday, April 44h, the TDPUD will present to the Board their plans to construct a new overhead power aw only o�tunine along to make our Drive. The meeting will be held at lens.at the r TDPUattendD office could make 11570 Donner differen a inthe outcome. This is rof the Board's decision. presence known and voice our op *PETITION TO THE TRUCKEE-DONNER PUD BOARD OF DIRECTORS The TDPUD is planning to construct a new 600-foot overhead �inieeinsta Iced atrtDe've between hairpin curves intersections a few years ago. This new eed and Denton avenues in order to connect with an existing underground overhead line will replace the existing overhead line o down eed corridor.0 Pro rt anticipation owners were not construction ven a chance tto comment on th s PUD has already clear-cut trees within a 10- to 20-footwe the proiect during its planning stages and we are requesting thaetppunder�rauna she newrdlingly, as not to: (1)hrindeassnowe emcDi too either explore an alternative route for their new overhead line 9 along this section of road; (2) compromise the ambience and character of our neighborhood thoroughfare; or (3) degrade our viewshed of Donner Lake and, thereby, diminish property values on our road. Signapf►re Date Name(print) Physical Address ff J nd urn We invite all persons in your household that are of envela age to signi nn this petition a AA AL age at print out t Dent and on n Avenue this 't,00ra Youetcanvtjustx email 587-7083) or drop off your petition into the P posted l ti ) or call (530-587-7072) with a reply of support. Remember, your response must be received before Wednesday, April 4th. I Page 1 of 2 susan Lindstrom From: Linda Sanford [lind am.sanford@g mail.com] Sent: Sunday, April 01, 2007 9:22 PM To: susan Lindstrom Subject: Re: TDPUD New Overhead Power Line Petition I signed the document below. Linda Sanford On 3/31/07, susan Lindstrom <slindstrom a�cebridge.net>wrote: Dear Neighbors; On Wednesday, April 4th, the TDPUD will present to the Board their plans to construct a new overhead power line along Pioneer Drive. The meeting will be held at 7pm at the TDPUD office at 11570 Donner Pass Road. This is our only opportunity to make our presence known and voice our opinions. Your attendance could make a real difference in the outcome of the Board's decision. *PETITION TO THE TRUCKEE-DONNER PUD BOARD OF DIRECTORS The TDPUD is planning to construct a new 600-foot overhead power line on Pioneer Drive between its intersections with Reed and Denton avenues in order to connect with an existing underground line installed at the hairpin curve a few years ago. This new overhead line will replace the existing overhead line down Reed Avenue. In anticipation of construction of the new overhead line, the has already clear-cut trees within a 10- to 20-foot-wide corridor. Property owners were not given a chance to comment on this project during its plannin sta es,_and we are requesting that Opportunity now. Accordingly, we the undersigned ask the PUD to either explore an alternative route for their new overhead line or underground the new line, so as not to: (1) hinder snow removal along this section of road; (2) compromise the ur viewshed of Donner Lake ambience f neighborhood our and, the eby diminishpropertyvalues on ourr road. hfare; or (3) degrade o Name (print) Physical Address Signature Date 4/9/07 Linda Sanford 14605_Denton Road 4/2/2007 Page I of 2 FYI: This item is scheduled toward the end of the meeting (see attached agenda) so don't worry if you can't be at the meeting exactly at 7:00p. If I remember correctly, the doors are never closed during the meeting. And if they are I doubt they are locked. Susan, signed copy of petition to follow. Thanks! Shanna & Andrew Entin From:susan Lindstrom [mailto:slindstrom@cebridge.net] Sent: Saturday, March 31, 2007 11:53 AM To: 'AnnaMaria Damonte'; courtfarrel@msn.com; Susan.Daniels@cbnorcal.com; freddog@cebridge.net; lacooley@csus.edu; stan@tdlandtrust.org; kjensen@surewest.net; vdrury@yahoo.com; amybwelles@yahoo.com; schoenwalds@hotmail.com; bkinghomes@USAmedia.ty; jtmcclaskey@sbcglobal.net; Brainbrabec@aol.com; Timber_Poppy@yahoo.com; Dvanbeek@petersendean.com; dddclan@sbcglobal.net; Denise.VanBeek@dcpfi.com; rginn@cebridge.net; cmardh@aol.com; juddbonsai@starstream.net; alpenglowclean@gmail.com; joancritt@hotmail.com; jls@tahoearchitect.com; Chiarenza@aol.com; Karen@usasa.org; k.witt.789@cebridge.net; KathyreeverKing@usamedia.tx; swbk@hotmail.com; Metroken@Frontiemet.net; Ischroers@tusd.net; kori@ltol.com; lindam.sanford@gmail.com; nickletiki@hotmail.com; miller@usamedia.tv; pjamsden@earthiink.net; rplock@plock-associates.com; riconato@yahoo.com; stonesoupdesigns@sbcgobal.net; romo625@earthlink.net; eski@cebridge.net; smcooley@verizon.net; slindstrom @cebridge.net; kaimanl@comcast.net; norm@nhbn.reno.nv.us Subject:TDPUD New Overhead Power Line Petition Dear Neighbors; On Wednesday, April 4th, the TDPUD will present to the Board their plans to construct a new overhead power line along Pioneer Drive. The meeting will be held at 7pm at the TDPUD office at 11570 Donner Pass Road. This is our only opportunity to make our presence known and voice our opinions. Your attendance could make a real difference in the outcome of the Board's decision. *PETITION TO THE TRUCKEE-DONNER PUD BOARD OF DIRECTORS The TDPUD is planning to construct a new 600-foot overhead power line on Pioneer Drive between its intersections with Reed and Denton avenues in order to connect with an existing underground line installed at the hairpin curve a few years ago. This new overhead line will replace the existing overhead line down Reed Avenue. In anticipation of construction of the new overhead line, the PUD has already clear-cut trees within a 10- to 20-foot-wide corridor. Property owners were not given a chance to comment_on_this_proiectduring its planning sta eg s, an we are requesting that opportunity now. Accordingly, we the undersigned ask the PUD to either explore an alternative route for their new overhead line or underground the new line, so as not to: (1) hinder snow removal along this section of road; (2) compromise the ambience and character of our neighborhood thoroughfare; or (3) degrade our viewshed of Donner Lake and, thereby, diminish property values on our road. Name (print) Physical Address Signature Date Shanna Entin 10128 Patty Lane, Truckee, CA, 96161 04/01/07 4/2/2007 4/2/2007 —phone call (petition has been mailed but may not arrive before 4/4 meeting) 14834 Denton Avenue - lot Mcllwain, Gary and Carol y 14845 Denton Avenue - lot Own lot in conjunction with Brabec, Brian and Joanna Bay area residents 4/2/2007 —phone call (petition has been mailed but may not arrive before 4/4 meeting) 14834 Denton Avenue - lot McIlwain, Gary and Carol 14845 Denton Avenue - lot Own lot in conjunction with )3rabec, Brian and Joanna Bay area residents *PETITION TO THE TRUCKEE-DONNER PUD BOARD OF DIRECTORS 1. The TDPUD is planning to construct a new 600-foot overhead power line on Pioneer Drive between its intersections with Reed and Denton avenues in order to connect with an existing underground line installed at the hairpin curve a few years ago. This new overhead line will replace the existing overhead line down Reed Avenue. In anticipation of construction of the new overhead line,the PUD has already clear-cut trees within a 10-to 20-foot-wide corridor. Property owners were not given a chance to comment on this project during its planning stages, and eve are requesting that opportunity now. Accordingly,we the undersigned ask the PUD to either explore an alternative route for their new overhead line or underground the new line, so as not to: (1)hinder snow removal along this section of road; (2) compromise the ambience and character of our neighborhood thoroughfare; or(3)degrade our viewshed of Donner Lake and, thereby, diminish property values on our road. Name(print) l �1 lPhysical Address sigaaturd' (� �LDate R 1 A:idr l Y3h0O`• lv►alt-jtnxx irt�tiC�ticuau •••ua..s•• .PETITION TO THE TRUCKEE-DONNER PUD BOARD OF 01RECTORS Pioneer Delve between its to corsstruct a now Sty-foot overhead power line � underground line installed The TDPUD is planning Denton avenues in order to connect with an existing intersections with Reed and This new overhead line wig replace the existing overhead lined ewes at the hairpin curve a few years ago- overhead tine,the PUD has sires��h nroiec Reed Avenue. in anticipation of cortsttrructionuof theme Wefe iv tin •►,� nr eort►tnity MW, Accordmide e the undersigned round the Pw tine. within a f0-to 2o-foot-wide corridor. �• �` everh�md line or underg dc,riM^ i!c olandm staff. we - compromise the ambience and character ask the PUD to either explore an alternative route for their new diminish so as not to:(1)hinder snow removal along this section of road;(2) of our neighb orhin d thoroughf...; or (3) degrade our viewshed of Donner Lake and, thereby, property values on our road- Phyncat Address Name (print) Date Signature j�, --- e.,4 tir041o1107 1�I e. etitS 4-T peAToV% YRUJd?0- M u�ifa7 t+t� _. httpJfUs.f835.Mad'ahoo.comty m(ShowLetter?1�sgYd=4676_5496550_73527 3072--50259... �I1I2Q47 A 1 t Y anoos twall -3Lu,u;►Ozhcr *PETITION TO THE TRUCKEE'DONNER PUD BOARD OF DIRECTORS ive between its The TDPUD is planning to construct a new 600-toot overhead powerwith anline existingpioneer r line instnu d intersections with Freed and Denton avenues in in rd o r�to��nect ill replace the xisting overhead lino down at the hairpin curve a few years ago- This Reed AvQnue• {n anticipation of construction of the new overhead line,the PUD has already c{e��s XoeeGi within a 10-to 2b-four-wide corridor- Accardingty, we the undersigned c��rr_.;na its c�iat�inn eta "� a er reaue� ask the PUD to either fin*of und explo an afMrnative route for they new Overheadomise the ambience and cround the haracter so as not to:(1)hinder snow removal along this section ofim hed of Bonner Lake and, thereby, diminish of our neighborhood thoroughfare; or (3) deg Property values on our road. Physical Address Name (Print) Date Signature jntme$ Cam' J 04r01107 _.... .ea�alro7 l YW 7 De.4f0� rLU, lce-- �jgnc t (� McCl.AsKE`{� 35-maul. AhOO.Cote/ym'ShovvLetter?MsgId2 4676-5496550_73527_3072,_50259... 4/1/2007 httpJlus.f8 Y r r a i Dear Neighbors; ong Pioneer A ril 4h, the TDf'UD will present to the Board their plans to construct a new overhead P �tu�it�y to make our On Wednesday, p Drive. The meeting will be held at 7'pm at the TDPV ance d rr�ake a real d fteren c the of the Board's decision• presence known and voice our opinions, Your attend *PETITION TO THE TRUCKEE-DONNER PUO BOARD OF DIRECTORS ions vvith D is planning to construct a new 6W-fact overhead Power line s Pioneeratthhe airpin curve an few years ago. This now d and The TDPU I_enton avenues in order to connect with an existing underground fine mst overhead tine will replace the existing overhead line down Reed Avenue. in anticipation of c{u iu ku��cfc ien's`M 1ermme line,on thip ce PUD has already clear-cut trees within a 10- to 20 foot-wide corridor, Proper[v o we urin is i in s e a w re r stin ha n n the new line, astnot to (1)t�indersnow removal QL*C_tA g degrade our either explore an alternative route for their new overhead enc or underground along this section of road; (2) compromise the ambience and o character of our neighborhood thoroughfare; or (3) g viewgshed of Donner Lake and,thereby,diminish property values D a t e Physical Addmss Signature (print) i 12 —_ r��s•L,� /i E 7 J`f- !/INN��t��L�'1s= / �./ /J cJ� /� 7 E2 0 b u r= r— *PETITION TO THE TRUCKEE-DONNER PUD BOARD OF DIRECTORS r— The TDPUD is planning to construct a new 600-foot overhead power line on Pioneer Drive between its intersections with Reed and Denton avenues in order to connect with an existing underground line installed at the hairpin curve a few years ago. This new overhead tine will replace the existing overhead line down Reed Avenue. In anticipation of construction of the new overhead line, the PUD has already clear-cut trees within a 10-to 20-foot-wide corridor. Property owners were not given a chA ge to comment on this Qrgjg I during its planning stags and we are requesting that opportUni!y now Accordingly, we the undersigned ask the PUD to either explore an aliemanre t route for their new overhead line or underground the new line, so as not to: (1) hinder snow removal T along this section of road; (2) compromise the ambience and character of our neighborhood thoroughfare; or (3) degrade our viewshed of Donner Lake and, thereby, diminish property values on our road. J 0 Name(print) Physical Address Signature Date (_0 sae e 11.2 -67 P O N -�J cn �x co c-, 0 0 w 0 0 J C Dear Neighbors; On Wednesday, April 4'", the TDPUD will present to the Board their plans to construct a new overhead power line along Pioneer Drive. The meeting will be held at 7pm at the TDPUD office at 11670 Donner Pass Road. This is our only opportunity to make our v nrsaarsnrw 4nnwn and rniro ni�r M�rfiAn! Vn� 4 V. � rri r- ..... w v 'PETITION TO THE TRUCKEE-DONNER PUD BOARD OF DIRECTORS 0 The TDPUD is planning to construct a new 600-foot overhead power line on Pioneer Drive between its intersections with Reed and On Denton avenues in order to conned with an existing underground line installed at the hairpin curve a few years ago. This new overhead line will replace the existing overhead line down Reed Avenue. In anticipation of construction of the new overhead line, the PUD has already clear-cut trees within a 10-to 20-foot=wide corridor. Property owners were not given a chance to comment on this voiect during its planning stages and we are requesting that opportunity now. Accordingly, we the undersigned ask the PUD to either explore an altemative route for their new overhead fine or underground the new line, so as not to: (1) hinder snow removal along this section of road; (2) compromise the ambience and character of our neighborhood thoroughfare; or (3) degrade our viewshed of Donner Lake and,thereby, diminish property values on our road. m Name rinl (F ) Physical Address S lure Date � Brian Brabec ,- 14845 Denton A Joanna Brabec 14845 Denton Ave. 'We invite all persons in your household that are of voting age to sign this petition. You can print out and sign this petition and return via fax (530- 587-7083) or drop off your petition into the envelope posted to the garage at 14931 Denton Avenue or you can just email (slindstromOcebridoe net)or call (530-587-7072)with a reply of support. Remember, your response must be received before Wednesday, April 4 0 0 0 W O V _i Dear Neighbnr5 On Vliednesda"pl1-1 4"' the TOPUD will present-to the Board their plans to construct a nevr overhead Go�,ver line along Pioneer Drive. The meetingwill be held at=rpm at the TDRUD otfice_at 1-1570 Donner Pass Road This is pr cur onlyuortunity to makc__our_ esence known_and voice our nions. Your attendance could make a real difference in the outcon}L,of the Board's decision. CD *PETITION TO THE TRUCKEE-DONNER PUD BOARD OF DIRECTORS The TDPUD_is planninct to construct a nevr 600-foot overhead_power line on Pioneer Drive between its intersections with Reed and Denton avenues in order to connect with an existing underground_line instaNed t e hair in curve _few ears ago. [his riew overhead­al lre will replace the-existi�thinnq )yerhe10- d line down Reed Avenue. in antici ation of construction of the new overhead line the PUD has ahead Gear-cut trees within a 10- to 20-foot-wide corridor Prooerty owners were not given a chance 4o comment on this —t — - - p�ntng ---- ----- Qro1eet Burin its lan stages, and we are requesting that opportunity now. _ACCordinaly ttie undersi ned ask the P D to either exulore an alternative route for their new over�i�d line ar wtde,�ctround the new li_nQ, so as not toL(?) hinder snow removal along this section of road• (2) compromise the ambience and_charac --- viewshed of Donner Lake and, thereb neiahborh�od thoroughfare: or (3) degrade our v. diminish propert values on our road. — Name rintl I'�gi Address -- Signature ___ Da e Am - We invite al!persons in your housoholp that ar a cj via fax(530- votmq aqe to Sian this etition, You can l tint out and§2 this oetitiun and return 587 7083�_9r drag _off _xouC a(,i on intu the envelope osteg to the c�ara & at__1493i n stindshom cebndcje.netl or calf �30-581-7072 wi reply of su � xa�al lust ernaif ---�--- - - t`-- I_tl�_. ppnrt, _Rtmer� r r r onse must be received befare Wednesday Aril l Dear Neighbors; ' On Wednesday, April 0, the TDPUD will present to the Board their plans to construct a new overhead power line along Pioneer Drive. The meeting will be held at 7pm at the TDPUD office at 11570 Donner Pass Road. This is our only opportunity to make our presence known and voice our opinions. Your attendance could make a real difference in the outcome of the Board's decision. *PETITION TO THE TRUCKEE-DONNER PUD BOARD OF DIRECTORS The TDPUD is planning to construct a new 600-foot overhead power line on Pioneer Drive between its intersections with Reed and Denton avenues in order to connect with an existing underground fine insiaiied di iilC 11ailpirl Uuidc a 1VVV ro014 PWV. I IIJ overhead line will replace the existing overhead line down Reed Avenue. In anticipation of construction of the new overhead line,the PUD has already clear-cut trees wtthin a 10-to 20-foot-wide corridor. Property owners were not aiven a chance to comment on this proiect during its planning stages and we are requesting that opportunity now. Accordingly, we the undersigned ask the PUD to either explore an aitemative route for their new overhead line or underground the new line, so as not to: (1) hinder snow removal along this section of road; (2) compromise the ambience and character of our neighborhood thoroughfare; or (3) degrade our viewshed of Donner Lake and,thereby, diminish property values on our road. Name(print' Physical Address h � Si Date ko "A�6- !V C. Ile We invite all persons in your household that are of voting age to sign this petition. You can print out and sign this petition and return via tax (530- 5V-70a31, �r drnn MIF ynur netition into the envelope ousted to the garage at 14931 Denton Avenue or you can just email �slinfi dstrom(a)cebrid c net) or call (530-587-7072) with a reply of support. Remember. your response must be received before Wednesday, April Dear Neighbors; On Wednesday, April 4', the TDPUD will present to the Board their plans to construct a new overhead power line along Pioneer Drive. The meeting will be held at 7pm at the TDPUD office at 11570 Donner Pass Road. This is our only opportunity to make our presence known and voice our opinions. Your attendance could make a real difference in the outcome of the Board's decision. *PETITION TO THE TRUCKEE-DONNER PUD BOARD OF DIRECTORS The TDPUD is planning to construct a new 600-foot overhead power line on Pioneer Drive between its intersections with Reed and Denton avenues in order to connect with an existing underground line installed at the hairpin curve a few years ago. This new overhead line will replace the existing overhead line down Reed Avenue. In anticipation of construction of the new overhead line, the PUD has already clear-cut trees within a 10- to 20-foot-wide corridor. Progerty owners were not given a chance to comment on this project during its planning stages and we are requesting that opportunity now. Accordingly, we the undersigned ask the PUD to either explore an alternative route for their new overhead line or underground the new line, so as not to: (1) hinder snow removal along this section of road; (2) compromise the ambience and character of our neighborhood thoroughfare; or (3) degrade our viewshed of Donner Lake and, thereby, diminish property values on our road. Name (print) Physical Address Signature Date iL f .-__, 7777-11 1 tit ; 71 *We invite all persons in your household that are of voting age to sign this petition. You can print out and sign this petition and return via fax (530- 587-7083) or drop off your petition into the envelope posted to the garage at 14931 Denton Avenue or you can just email 4tn ) or call (530-587-7072) with a reply of support. Remember, your response must be received before Wednesday, April Dear Neighbors; On Wednesday, April 41h, the TDPUD will present to the Board their plans to construct a new overhead power line along Pioneer Drive. The meeting will be held at 7pm at the TDPUD office at 11570 Donner Pass Road. This is our only opportunity to make our presence known and voice our opinions. Your attendance could make a real difference in the outcome of the Board's decision. *PETITION TO THE TRUCKEE-DONNER PUD BOARD OF DIRECTORS The TDPUD is planning to construct a new 600-foot overhead power line on Pioneer Drive between its intersections with Reed and Denton avenues in order to connect with an existing underground line installed at the hairpin curve a few years ago. This new overhead line will replace the existing overhead line down Reed Avenue. In anticipation of construction of the new overhead line, the PUD has already clear-cut trees within a 10- to 20-foot-wide corridor. Property owners were not given a chance to comment on this project during its planning stages, and we are requesting that opportunity now. Accordingly, we the undersigned ask the PUD to either explore an alternative route for their new overhead line or underground the new line, so as not to: (1) hinder snow removal along this section of road; (2) compromise the ambience and character of our neighborhood thoroughfare; or (3) degrade our viewshed of Donner Lake and, thereby, diminish property values on our road. Name (print) Physical Address Sigrature Date l s p , prr We invite all persons in your household that are of voting age to sign this petition. You can print out and sign this petition and return via fax (530- 587-7083) or drop off your petition into the envelope posted to the garage at 14931 Denton Avenue or you can just email (slindstrom(d�_cebridge.net) or call (530-ti87-7072) with a reply of support. Remember, your responsE! must be received before Wednesday, April th Dear Neighbors; On Wednesday, April 4t", the TDPUD will present to the Board their plans to construct a new overhead power line along Pioneer Drive. The meeting will be held at 7pm at the TDPUD office at 11570 Donner Pass Road. This is our only opportunity to make our presence known and voice our opinions. Your attendance could make a real difference in the outcome of the Board's decision. *PETITION TO THE TRUCKEE-DONNER PUD BOARD OF DIRECTORS The TDPUD is planning to construct a new 600-foot overhead power line on Pioneer Drive between its intersections with Reed and Denton avenues in order to connect with an existing underground line installed at the hairpin curve a few years ago. This new overhead line will replace the existing overhead line down Reed Avenue. In anticipation of construction of the new overhead line, the PUD has already clear-cut trees within a 10- to 20-foot-wide corridor. Property owners were not given a chance to comment on this proiect during its planning stages and we are requesting that opportunity now. Accordingly, we the undersigned ask the PUD to either explore an alternative route for their new overhead line or underground the new line, so as not to: (1) hinder snow removal along this section of road; (2) compromise the ambience and character of our neighborhood thoroughfare; or (3) degrade our viewshed of Donner Lake and, thereby, diminish property values on our road. Name (print) Physical Address Si nntture _ Date Brian Brabec 14845 Denton Ave. Joanna Brabec 14845 Denton Ave. 1A 1 k"( *We invite all persons in your household that are of voting age to sign this petition. You can print out and sign this petition and return via fax(530- 587-7083) or drop off your petition into the envelope posted to the garage at 14931 Denton Avenue or you can just email 4n ; ,. _: ) or call (530-587-7072) with a reply of support. Remember, your response must be received before Wednesday, April i Dear Neighbors; On Wednesday, April 4'h, the TDPUD will present to the Board their plans to construct a new overhead power line along Pioneer Drive. The meeting will be held at 7pm at the TDPUD office at 11570 Donner Pass Road. This is our only opportunity to make our presence known and voice our opinions. Your attendance could make a real difference in the outcome of the Board's decision. *PETITION TO THE TRUCKEE-DONNER PUD BOARD OF DIRECTORS The TDPUD is planning to construct a new 600-foot overhead power line on Pioneer Drive between its intersections with Reed and Denton avenues in order to connect with an existing underground line installed at the hairpin curve a few years ago. This new overhead line will replace the existing overhead line down Reed Avenue. In anticipation of construction of the new overhead line, the PUD has already clear-cut trees within a 10- to 20-foot-wide corridor. Property owners were not given a chance to comment on this project during its planning stages, and we are requesting that opportunity now. Accordingly, we the undersigned ask the PUD to either explore an alternative route for their new overhead line or underground the new line, so as not to: (1) hinder snow removal along this section of road; (2) compromise the ambience and character of our neighborhood thoroughfare; or (3) degrade our viewshed of Donner Lake and, thereby, diminish property values on our road. Name (print) Physical Address Signature ; ^ Date i We invite all persons in your household that are of voting age to sign this petition You can print out and sign this petition and return via fax (530- 587-7083) or drop off your petition into the envelope posted to the garage at 14931 Denton Avenue or you can just email (slindstrom(a�cebridoe.net) or call (530-587-7072) with a reply of support. Remember, your response must be received before Wednesday, April 4 in Page 2 of 3 From: susan Lindstrom [mailto:slindstrom@cebridge.net] Sent: Saturday, March 31, 2007 11:53 AM To: 'AnnaMaria Damonte'; courtfarrel@msn.com; Susan.Dan iels@cbnorcal.com; freddog@cebridge.net; lacooley@csus.edu; stan@tdlandtrust.org; kjensen@surewest.net; vdrury@yahoo.com; amybwelles@yahoo.com; schoenwalds@hotmail.com; bkinghomes@USAmedia.ty; jtmcclaskey@sbcglobal.net; Brain bra bec@aol.com; Timber_Poppy@yahoo.com; Dvanbeek@petersendean.com; dddclan@sbcglobal.net; Denise.VanBeek@dcpfi.com; rginn@cebridge.net; cmardh@aol.com; juddbonsai@starstream.net; alpenglowclean@gmail.com; joancritt@hotmail.com; jls@tahoearchitect.com; Chiarenza@aol.com; Karen@usasa.org; k.witt.789@cebridge.net; KathyreeverKing@usamedia.tx; swbk@hotmail.com; Metroken@Frontiernet.net; Ischroers@tusd.net; kori@ltol.com; lindam.sanford@gmail.com; nickletiki@hotmail.com; miller@usamedia.ty; pjamsden@earthlink.net; rplock@plock-associates.com; riconato@yahoo.com; stonesoupdesigns@sbcgobal.net; romo625@earthlink.net; eski@cebridge.net; smcooley@verizon.net; slindstrom@cebridge.net; kaimanl@comcast.net; norm@nhbn.reno.nv.us Subject: TDPUD New Overhead Power Line Petition Dear Neighbors; On Wednesday, April 41h, the TDPUD will present to the Board their plans to construct a new overhead power line along Pioneer Drive. The meeting will be held at 7pm at the TDPUD office at 11570 Donner Pass Road. This is our only opportunity to make our presence known and voice our opinions. Your attendance could make a real difference in the outcome of the Board's decision. *PETITION TO THE TRUCKEE-DONNER PUD BOARD OF DIRECTORS The TDPUD is planning to construct a new 600-foot overhead power line on Pioneer Drive between its intersections with Reed and Denton avenues in order to connect with an existing underground line installed at the hairpin curve a few years ago. This new overhead line will replace the existing overhead line down Reed Avenue. In anticipation of construction of the new overhead line, the PUD has already clear-cut trees within a 10- to 20-foot-wide corridor. Prperty owners were not-given a chance to comment on this project during its planning stages, and we are requesting that opportunity now. Accordingly, we the undersigned ask the PUD to either explore an alternative route for their new overhead line or underground the new line, so as not to: (1) hinder snow removal along this section of road; (2) compromise the ambience and character of our neighborhood thoroughfare; or (3) degrade our viewshed of Donner Lake and, thereby, diminish property values on our road. Name (print) Physical Address Signature Date Shanna Entin 10128 Patty Lane, Truckee, CA, 96161 04/01/07 Andrew Entin 10128 Patty Lane, Truckee, CA, 96161 04/01/07 "We invite all persons in your household that are of voting age to sign this petition. You can print out and A I /'1 nn1 I Dear Neighbors; 01 On Wednesday, April Vh, the TDPUD Will present to the Board their plans to construct a new overhead power line along Pioneer m Drive. The meeting will be held at 7pm at the TDPUD office at 11570 Donner Pass Read. This is our only opportunity to make our presence known and voice our opiNong, Your attendance could make a real difference in the ouCr me of the hoard's decision. w °1 'PETITION TO THE TRUCKEE-DONNER PUD BOARD Of DIRECTORS J W ~ The TDPUD is planning to construct a new 600-foot overhead power line on Pioneer Drive between its intersections with Reed and Denton avenues in order to connect with an existing underground line installed at the hairpin curve a few years ago_ This new overhead line will replace the existing overhead line down Reed Avenue_ In anticipation of construction of the new overhead line,the PUD has already clear-cut traces within a 10-to 20-foot wide corridor. Property owners were not,given a chance to comment on this project during its planning stages, and we are requesting that opportunity now. Accordingly, we the undersigned ask the PUD to either explore an attemative route for their new overhead line or underground the now line, so as not to: (1)hinder snow removal along this section of road; (2) compromise the ambience and character of our neighborhood thoroughfare' or (3) degrade our viewshed of Donner lake and,thereby,diminish property values on our road. Name(print) Physical Address Signattxv. Date �7 2 n I 4Z A 1 i •fi 10. z 3 We invite all persons ir!your household that are of voting age to sign this petition. You can print out andsign this petition and return via fax(530- " 587-7083) or drop off your petition into the envelope posted to the garage at 14931 Denton Avenue or you can just emit (sshndstromQcebridge.nel}or call(530-587-7072)with a reply of support Remember, your response must be received before Wednesday.April OJ iw 4 i I Dear Neighbors; On Wednesday, April 41h, the TDPUD will present to the Board their plans to construct a new overhead power line along Pioneer Drive. The meeting will be held at 7pm at the TDPUD office at 11570 Donner Pass Road. This is our only opportunity to make our presence known and voice our opinions. Your attendance could make a real difference in the outcome of the Board's decision. *PETITION TO THE TRUCKEE-DONNER PUD BOARD OF DIRECTORS The TDPUD is planning to construct a new 600-foot overhead power line on Pioneer Drive between its intersections with Reed and Denton avenues in order to connect with an existing underground line installed at the hairpin curve a few years ago. This new overhead line will replace the existing overhead line down Reed Avenue. In anticipation of construction of the new overhead line, the PUD has already clear-cut trees within a 10- to 20-foot-wide corridor. Property owners were not given a chance to comment on this proiect during its planning stages, and we are requesting that opportunity now. Accordingly, we the undersigned ask the PUD to either explore an alternative route for their new overhead line or underground the new line, so as not to: (1) hinder snow removal along this section of road; (2) compromise the ambience and character of our neighborhood thoroughfare; or (3) degrade our viewshed of Donner Lake and, thereby, diminish property values on our road. Name (print) Physical Address Signature Date I e Cyo ley /-/7 70 b&,:F6,1 Alc l 4-f 7 7o � 7 s "We invite all persons in your household that are of voting age to sign this petition. You can print out and sign this petition and return via fax(530- 587-7083) or drop off your petition into the envelope posted to the garage at 14931 Denton Avenue or you can just email (slindstroma-cebridge.net) or call (530-587-7072) with a reply of support. Remember, your response must be received before Wednesday, April 4 in G' \\x Dear Neighbors; On Wednesday, April 4"' the TDPUD will present to the Board their plans to construct a new q er I ire along Pioneer Drive. The meeting will be held at 7pm at the TDPUD office at 11570 Donner Pass Road. This ' ur o oppo Lnity to make our presence known and voice our opinions. Your attendance could make a real difference in the out -ire of: e Boar 's decision. *PETITION TO THE TRUCKEE-DONNER PUD BOARD OF DI ORS �r The TDPUD is planning to construct a new 600-foot overhead power line on Pioneer Drive be n itranterse ions with Reed and Denton avenues in order to connect with an existing underground line installed at the hai few y ars ago. This new overhead line will replace the existing overhead line down Reed Avenue. In anticipation of co he overhead line, the PUD has already clear-cut trees within a 10-to 20-foot-wide corridor. Property owners were not given a c an to comment on this project during its planning stapes and we are requesting that opportunity now. Accordingly, we the undersigned ask the PUD to either explore an alternative route for their new overhead line or underground the new tine, so as not to: (1) hinder snow removal along this section of road-, (2) compromise the ambience and character of our neighborhood thoroughfare, or (3) degrade our viewshed of Donner Lake and,thereby, diminish property values on our road. Name(print) Physical Address Signature Gate `We invite all persons in your household that are of voting age to sign this petition. You can print out and sign this petition and return via fax(530- 587 7083) or drop off your petition into the envelope posted to the garage at 14931 Denton Avenue or you can just email (slindstrorriftcebridne net) or call (530-587-7072)with a reply of support. Remember, your response must be received before Wednesday, April 4 DATE: April 4, 2007 TO: TDPUD Members of the Board FROM: Pioneer/Denton/Reed Property Owners, Donner Lake RE: Proposed TDPUD Overhead Power Line My name is Susan Lindstrom and I'm back here to speak once again on behalf of about 50 residents on Pioneer, Reed and Denton roads at Donner Lake who could not be here tonight. Recall that we're an informal road association and are here to ask that the Board consider our absolute opposition to a current project by the PUD to construct a new overhead power line on our road. As we understand the proposed project, the new overhead line consists of a total of five new poles, not four as stated in the District's staff report. In the span of about 600 feet, wires would cross over Pioneer Drive twice, terminating at a new stub pole at the hairpin, where the line would hook-up to an existing underground power line that extends across open space to the Donner Lake Interchange at Cedar Point Drive. In anticipation of construction of the proposed line in October 2006, the PUD clear-cut trees up to a 20-foot-wide corridor along Pioneer Drive; it was not limited to a 10-foot- wide swath as stated in the staff report. We know that the District has the right to "trim" trees along their line, but does it also have the right to remove them? The residents were not contacted in advance of the clear cut. Recall that the PUD's removal of this vegetation created a safety hazard along our road, requiring the installation of a guardrail. When the TDPUD stated that we would have to pay for most of the guardrail, we appealed to the Board, which concurred with our request. We appreciate the TDPUD ultimately taking responsibility for their actions by financing 60-feet of rail. Guardrail aside, a key issue remains unresolved. At the December meeting, we asked: What is the PUD policy regarding the installation of new overhead power lines within an established subdivision? The question was left unanswered until now, and from the staff report, District policy has been clearly stated, I repeat: It shall be the policy of the Truckee Donner Public Utility District to require all new or rebuild construction to be placed underground wherever practical. Special circumstances may dictate undergrounding is not practical and the District reserves the right to determine the practicality of a project(Chapter 7.48, Section 7.48.010). It seems that the core of the policy statement hinges on "practicality." And, we ask, outside of the ever-present issue of cost, what is so impractical about undergrounding the line between Reed and Pioneer in order to connect to the existing underground line at the intersection of Pioneer and Denton? Why was the 2,600-foot section of new underground line that adjoins Pioneer Avenue practical to construct and ours is not? We know that undergrounding a line is always more expensive than the installation of overhead lines (even though maintenance costs are ultimately reduced.) But, if increased cost is the only factor that makes undergrounding impractical, then when is it ever practical to install an underground line? We believe that the PUD's recommendation for an overhead line on Pioneer Avenue is inconsistent with their policy statement. In an effort to gain some perspective on policies for other utilities districts, we contacted the General Manager for the North Tahoe Public Utilities District, Lee Schegg, and Jack Beckman, District Engineer at the Tahoe City Public Utilities District. We also talked to Phil Carrilo, Operations Manager for the Sierra Pacific Power Company. All were in agreement that new utilities are typically undergrounded, especially in scenic areas. We also learned that SPPC has initiated a program with Placer, Eldorado, Plumas, Sierra, and Nevada counties to establish districts, whereby areas with a high concentration of overhead wires are targeted for the conversion of overhead to underground line. The SPPC has even set aside 2% of their total revenues to pay for the new underground wiring. We bring these examples to the Board's attention to illustrate the clear and growing trend to underground utilities lines. In our particular case, the installation of a new overhead power line on Pioneer Avenue would degrade our existing viewshed of Donner Lake (e.g. W. Reed Avenue). The District justifies their plans "because this neighborhood is an existing overhead electric line area." But, we also have existing underground lines in our neighborhood and this section of Pioneer is currently free of overhead lines. Furthermore, we know that once an overhead line has been established, other utilities join the pole, as is distressingly evident by the spaghetti network of wires than hang on other overhead lines at Donner Lake. On Pioneer, at least seven parcels would be directly affected by the line, lots where residents have lived for up to 40 years. Vistas marred by power lines could substantially reduce our property values, as has been confirmed by a local Donner Lake realtor. In addition. the rural mountain ambiance of our roadway would be forever compromised. Last winter, the District offered to enter into an agreement to underground the line on Pioneer Drive, if we installed it largely at our own expense. We don't believe that the residents of Pioneer/Denton/Reed should have to bear the cost to underground a new overhead line that the District has chosen to build, not us. We maintain that our request to underground the line is consistent with TDPUD policy, in particular, and also with the general trend of public utilities to underground their new lines — especially in the scenic Truckee-Tahoe Basins. We don't believe we've had a fair public process in the planning of this new line. The TDPUD is a public agency, with the objective to have public input — before rather than after the planning. In the PUD staff report, it states that the District's goal is to "minimize associated utility impacts." This certainly has not been the case in our situation. Premature actions taken on the part of the PUD, without public input and without approval of the Board, have already left their indelible mark on our road. We now have a strip clear cut of trees and we now must install a safety guardrail and the project has not even been approved. And, now we are asked to endure a third eye-sore, a new overhead power line. The staff report maintains that "sufficient right-of-way and road shoulder areas exist to place pole structures." We need the road shoulder clear of obstructions, as a turn-out for two cars to pass along this steep pitch of road, and also we need this open space to store snow. The PUD would have to move poles far to the outside edge of the shoulder and doing so may require that yet another strip of trees be clearcut. The staff report also maintains that an underground line could only be constructed with "great difficulty" given existing underground utilities. This section of road and shoulder is at least 20 feet wide. There must be some remaining space for a new electrical line, even if installation had to slightly encroach into paving. In summary, we believe that there is no "impracticality" that would preclude the installation of an underground utility line on Pioneer Avenue, and in doing so, the PUD would follow through with actions that really do match their policy statements, as well as preserving the unique beauty of Donner Lake. Thank you again for your consideration.