HomeMy WebLinkAbout10 Sierra College Potable Water Agenda Item #
CKEE DONNER
Publica ty Distric
Memorandum
To: Board of Directors
From: Neil Kaufman
Date: July 10, 2007
Subject: Potable Water System Improvements at Sierra College
1. Why this matter is before the board:
Board Authorization is required for expenditures in excess of$15,000.
2. History:
In April 2007, the Board gave approval to entering into an agreement with Sierra College
regarding the upsizing and construction of water system improvements associated with the
college's Truckee campus. The draft agreement presented to the Board showed a total
payment of $277,239 from the District to Sierra College. The Board approved a total
expenditure of up to $300,000, providing about$23,000 for contingencies.
3. New information:
The draft agreement presented in April was never finalized and signed by the District. Since
April 2007, two issues have arisen that should be brought to the attention of the Board.
1) There is about 1,100 feet of pipeline running from the main building site west to State
Route 89. This section of pipe will be 12-inch. A 12-inch pipe is needed by the
District and is identified in the 2004 Water System Master Plan. In April, it was
expected that Sierra College would be paying the entire cost of this section of pipe.
Sierra College later submitted documentation indicating that an 8-inch pipe was
needed by the college. Upon review of this information, I agree that only an 8-inch
pipe is needed by the college. Therefore, the District would be responsible for the
cost of upsizing this section of pipe from 8" to 12". The cost quoted by the College
for this upsizing is $39,932.
2) In April, I had indicated that Southwest Gas would be contributing some money
towards the construction of a joint trench containing water and gas piping. At that
time, I had estimated this value at between $10,000 and $20,000. This value has
been finalized at $6,188.
A revised agreement has been prepared encompassing the above two items. The total
payment from the District to Sierra College is now $310,983. In order to provide a small
contingency allowance, I am requesting authorization for expenditure of up to $330,000.
4. Recommendation:
1) The District enter into an agreement with Sierra College whereby the college will
construct the water system facilities requested by the District at a cost not exceed
$330,000.
2) The Board authorize staff to transfer the necessary funds from Water Facility Fees to the
Water General funds to pay for the improvements.
Attachment:
Revised Draft Supplemental Agreement with SJCCD
UTILITY CONSTRUCTION AGREEMENT
BETWEEN THE
TRUCKEE DONNER PUBLIC UTILITY DISTRICT
AND
SIERRA JOINT COMMUNITY COLLEGE DISTRICT
This Agreement is entered into on the day of , 2007 between the TRUCKEE
DONNER PUBLIC UTILITY DISTRICT, a local public agency of the State of California, hereafter referred
to as the "TDPUD," and SIERRA JOINT COMMUNITY COLLEGE DISTRICT, a local public agency of
the State of California, hereafter referred to as "SJCCD." The TDPUD and SJCCD may be referred to
herein as "Party" or the "Parties." This Agreement is entered into with respect to the following facts:
RECITALS
WHEREAS, the SJCCD has contracted for construction of its Truckee Campus Project (hereinafter
"Project"); and
WHEREAS, the SJCCD has, at the request of the TDPUD, included in the Project certain water system
facilities that are not necessary for the provision of water service to the Project, but are beneficial to the
TDPUD's overall water system;
WHEREAS, the improvements include upsizing the water line near the nursery on Donner Pass Rd at
STA 10+34 to the campus at STA 19+00 (approximately) from 12" to 16", upsizing the water line from 8"
to 12" from STA 14+00 to STA 2+81, extending a 12" water line from STA 2+81 to the southwest corner
of Deerfield Drive and Hwy 89 and extending a 12" water line from STA 2+81 west across Hwy 89 as
shown on Increment 1 Rough Grading and Site Utilities Plans dated June 15, 2007 and Offsite Water
and Hwy 89 Improvement Plans dated January 5, 2007.
WHEREAS, the TDPUD has agreed to pay the construction costs associated with those facilities not
necessary for the provision of water service to the Sierra College campus; and
WHEREAS, the SJCCD has awarded a contract for the construction of the project pursuant to California
law including Education Code 81335, and the contract shall include the work to construct the TDPUD's
water facilities noted above.
NOW THEREFORE, the Parties agree as follows:
1. Work of the Contract. The SJCCD agrees to upsize the water line near the nursery on Donner
Pass Rd at STA 10+34 to the campus at STA 19+00 (approximately) from 12" to 16", upsize the water
line from 8" to 12" from STA 14+00 to STA 2+81, extend a 12" water line from STA 2+81 to the
southwest corner of Deerfield Drive and Hwy 89 and extend a 12" water line from STA 2+81 west across
Hwy 89. TDPUD's water facilities shall be constructed as shown on the project plans and specifications
subject to reasonable changes required by actual construction conditions, as approved by the SJCCD.
The Work shall also comply with the Development Agreement between SJCCD and the TDPUD dated
July , 2007.
2. Control of Work, Upon the award of a contract to perform the Project, including the TDPUD's
water facilities, the SJCCD shall have the sole authority to control and direct the activities of the SJCCD's
Page 1 of 3
contractor. Any communication the TDPUD desires with the contractor must be conducted through the
SJCCD. TDPUD shall have the right to inspect the construction and ensure that the construction meets
the requirements of the Approved Drawings and the TDPUD's current Water System Construction
Standards.
3. Payment to SJCCD. TDPUD agrees to make periodic payments to SJCCD upon completion and
acceptance of a given component of the Work. SJCCD shall then submit a written request for payment to
TDPUD. SJCCD shall include reasonable documentation supporting the request for payment. TDPUD
shall make payment to SJCCD within thirty (30) days of the TDPUD's receipt of an invoice from the
SJCCD. At the time that this Agreement is entered into, the Parties agree that the total cost to the
TDPUD is estimated to be three hundred ten thousand, nine hundred eighty three dollars ($310,983) and
that the actual costs and expenses may exceed this estimate. SJCCD shall be entitled to additional
amount of Fifteen-Hundred Dollars ($1,500)for administrative costs.
4. Change Orders. Any changes in the Work shall be authorized in writing by both the TDPUD and
SJCCD prior to their construction. The TDPUD shall not be liable for costs associated with any changes
not authorized by TDPUD. SJCCD shall be responsible for all change orders occurring on upsizing the
water line near the nursery on Donner Pass Rd at STA 10+34 to the campus at STA 19+00 from 12" to
16", and upsizing the water line from 8" to 12" from STA 14+00 to STA 2+81. All change orders and
delays associated with extending the 12" water line from STA 2+81 to the southwest corner of Deerfield
Dr and Hwy 89 and across Hwy 89 to the POC and extending a 12" water line from STA 2+81 west
across Hwy 89 shall be borne by TDPUD.
5. Supplemental Agreement. There exists a Development Agreement between SJCCD and the
TDPUD. This agreement is supplemental to that document.
6. Necessary Acts. Each Party to this Agreement agrees to perform any further acts and execute
and deliver any further documents that may be reasonably necessary to carry out the provisions of this
Agreement.
7. Attorneys Fees. In the event of any litigation concerning any controversy, claim or dispute
between the Parties hereto, arising out of or relating to this Agreement or the breach hereof, or the
interpretation hereof, the prevailing Party shall be entitled to recover from the losing Party reasonable
attorneys fees and costs incurred therein or in the enforcement or collection of any judgment or award
rendered therein.
8. Forum. Any litigation to enforce or interpret the provisions of this Agreement or the Parties' rights
and liabilities arising out of this Agreement or the performance hereunder shall be maintained only in the
courts in the County of Nevada, California.
9. Governing Law. This Agreement shall be governed by and construed in accordance with the laws
of the State of California.
Page 2 of 3
This Agreement shall be binding upon the Parties only when signed by both Parties.
TRUCKEE DONNER PUBLIC UTILITY DISTRICT
DATED: BY:
Peter L. Holzmeister, General Manager
SIERRA JOINT COMMUNITY COLLEGE DISTRICT
DATED: BY:
Title:
Page 3 of 3