To: Board of Directors
From: Jessica Wilson
Date: July 5, 2007
Subject: Change Order No. 1 for the Storage Tank Rehabilitation— 2007 Project
1. Why this matter is before the board:
Approval from the Board of Directors is necessary to issue a Change Order to a construction
contract.
2. History:
On June 6, 2007, the Board awarded the Storage Tank Rehabilitation — 2007 project to
Olympus &Associates, Inc., in the amount of$83,825.00.
3. New information:
The following modifications to the Sierra Meadows Tank must be completed before re-coating
the interior:
• Installation of two 8-inch U-vents on the edge of the roof - Currently there is one
mushroom vent in the center of the roof that does not vent well under snow loads. The
U-vent design has proven to work well on other District tanks.
• Installation of 20 feet of handrail on the roof- Currently there is no handrail. The railing
will be placed around the exterior ladder and roof hatch for safety.
• Removal of the interior ladder-The existing aluminum ladder is severely corroded and is
no longer safe to use. Because having an interior ladder is not a code requirement, the
most cost efficient solution is to remove the ladder without replacement.
Staff anticipated that the District Operations Crew would complete the above modifications by
August 3, 2007, so that the Contractor could begin on August 6, 2007, as scheduled in the
Contract Documents. The Contractor, however, requested that they be allowed to begin the
Work earlier and submitted a quote to perform the modifications.
Page 1
Staff believes that Olympus' proposal would save the District money and time. Their quote is
less expensive than what it will likely cost the District to perform the same work because it is
their area of expertise. Also, by performing the Work earlier in the year, there is less likelihood
that the District will need to pay the Contractor for "Environmental Controls", controlling
temperature and humidity within the tank. At the moment, the Water Crews have three less
people working than last summer. If Olympus works on the modifications, it will free up crew
time to work on other projects and maintenance.
4. Recommendation:
I recommend that the Board authorize Contract Change Order No. 1, in the amount of a
$3,411.00 payment to Olympus & Associates, Inc., from the District.
Attachments:
Change Order Form
Page 2
FROM OLYMPUS AND ASSOSIATES INC PHONE NO. 775 322 0288 Jun. 29 2007 01: 11PM P2
,m
Jun-2rs-2007 12:070M Fro-''R'WCKEE DONNER PUO +5305871189 T-148 P•002/002 F-343
TRUCKEE DONNE , flange Order
Contract Name: Storage Tank Rehabilitation-2007
contract Change Order Nc: _ Crig. Contract Amt.3 83.1825.00 Days NA
Date: Julys,2007 Preu. Apprd Charges 3 0.00 Days _,NA
Contractor Iympu6&Associate�lrtc. This Change 3 _ 3,411,00 Days NA
Riviised Contract Amt. 3 87,236.00 Days _ NA _
This Change Order covers changes to the subject Contract as described herein. The Contractor shall construct,
fumish equipment and metedais, and perform all work as neomeary or required to comnplete the Change Order
lteTns for a lump sum price agreed upon between the Contractor and District.
Increase in (Deor'ease) Contract Time
Contract in Contract Extension
Description of Changes Amount W ; Amount W (days) _
I —Modifications to Tank Aopurtenanoes $3,411.00 NA
I
i
i
i
Totals I $3,411.00
Net change In contract amount(Increase or decrease) $3,411.00 I
The amount of the Contract will be increased by the >gUm e+f $3,411,00 and the Contract Time shall not be
sxi tided. The undersigned Contractor approves the foregoing Change Order as to the changer., if arty, in the
oontm,61 price specified for each item InelUding any and all suparvlslan COM and other miscelisrieous costs
relating to the dhange in work,and as to the extension of tirrie narrowed, if any:for romplelon of the entire work on
account or said Change Order. The Co m^a= agreels to rurnish all labor and rnntarlals and perform all other
necessary work, inclusive of the directly or indirectly related to the approved time extension, required to complete
the Change order items. This merit will become a supplarn®tit of the contract and all provisions will apply
hereto. It is understood that th range Order shall be effective when approved by the District
/ 2 t7
Accepted: /Cc-itracwr Date:
at�re
Approved; District. bate:
(Signature)
Page 1