HomeMy WebLinkAbout9 Hydrogeologic Consulting Services Agenda Item # TRUCKEE DONNER Memorandum To: Board of Directors From: Ed Taylor Date: June 15, 2007 Subject: Proposals for Hydrogeologic Consulting Services 1. Why this matter is before the board: Board approval is required for expenditures in excess of$15,000. 2. History: The Board previously requested that a Request for Proposals be issued the next time that hydrogeologic consulting services were required. On May 2, 2007, a draft RFP for Hydrogeologic Consulting Services was presented to the Board. The Board then approved issuing the RFP. 3. New Information: Four proposals were received by the District. The four firms that submitted are: AquA Hydrogeologic Consulting. Reno, Nevada Farr West Engineering &Quad Knopf. Reno, Nevada Fugro West. Roseville, California Wood Rogers. Sacramento, California After reviewing the proposals, the firms were ranked based upon the following categories (1 = Best, 4=Worst): Size of Firm (Available Resources) 1. Wood Rogers 2. Fugro West 3. Farr West Engineering &Quad Knopf 4. AquA Hydrogeologic Consulting Overall Experience 1. AquA Hydrogeologic Consulting 2. Wood Rogers 3. Fugro West 4. Farr West Engineering &Quad Knopf Familiarity with TDPUD &Martis Valley Basin 1. AquA Hydrogeologic Consulting 2. Farr West Engineering &Quad Knopf 3. Wood Rogers 4. Fugro West Response to District Needs 1. AquA Hydrogeologic Consulting 1. Farr West Engineering &Quad Knopf 2. Fugro West 3. Wood Rogers After the above review as performed, the cost proposals were opened and reviewed. On an hourly basis, AquA and Farr West are about the same and are less expensive than the other two. These two firms are smaller in size and are likely to have much lower overhead costs than the other two companies. The hourly rates between Fugro West and Wood Rogers were comparable. After reviewing all of the information I believe that David Carlson and AquA Hydrogeologic Consulting would be the best firm to assist the District in drilling the new well and site determination for future wells. I believe that their familiarity with the drilling conditions in the local area sets them apart from the other firms. As part of the preparation of the Bidding Documents for the Fibreboard Well, staff and AquA will contact the well drillers in the California/Nevada area to review the specifications on the past few wells and determine how they could be improved. The District will create a Master Services Agreement with the selected consulting firm. Work to be performed by the consulting firm shall be defined by Task Orders under the Master Services Agreement. Should the hydrogeologic consulting services provided by the selected firm prove satisfactory, the District may extend the term of the Master Services Agreement for up to three years. For future years, the hourly rates given in the Cost Proposal may be adjusted by an amount not to exceed the increase in the Consumer Price Index (CPI) as published by the United States Department of Labor for the corresponding time period. 4. Recommendations: Authorize the Water Department to retain AquA Hydrogeologic Consulting to assist the District with construction bidding and construction of the Fibreboard Well. The contract would be based upon the hourly rates given in AquA's cost proposal with an amount not to exceed $110,000. Attachments: RFPs t low co� Is Truckee Donner Public Utility District Hydrogeologic consulting Services Technical Proposal IN Martis Valley - Rehabilitation Y - z x G r �s f Glenshire - Rehabilitation Old Greenwood- Production Well Fibreboard - Exploration Well Is. 9 T, rb�ry f f , A �. iillr�_ Prosser Village - Production Well ,r1 A&A May 22,2007 Neil Kaufman,P.E. Water System Engineer Truckee Donner Public Utility District 11570 Donner Pass Road Truckee,California 96160 RE: Technical Proposal for Hydrogeologic Consulting Services Dear Mr. Kaufman: AquA Hydrogeologic Consulting(AquA)is pleased to submit our technical proposal for hydrogeologic consulting services as requested by the Truckee Donner Public Utility District. As you read through our submittal:the technical proposal,our work experience, and resumes,I am sure that you will find that AquA will be the one consulting firm that will provide you with the hydrogeologic expertise that you require. 1.0 Firm's Name: AquA Hydrogeologic Consulting Address: P.O. Box 18793,Reno, Nevada 89511 Telephone: 775-250-9700 Contact: David Carlson 2.0 Firm's Background and Experience AquA was formed in Reno,Nevada in 2001 to provide hydrogeologic consulting expertise in the field of ground water development. Owner of the firm is David Carlson. Since 1980, individual members of the AquA team have been involved in developing and managing ground water resources throughout the world including South America,the Middle East, Indonesia, Guatemala, and the United States. Specifically,since 19881 have been the groundwater consultant to the - Truckee Donner Public Utility District,with the exception of 1994 to 1998, when I was working in the Middle East and Indonesia. During this period of time I have overseen and supervised the following projects for the Truckee Donner Public Utility District: • Drilling and construction of the Prosser Annex Exploration Well • Drilling, construction, and testing of the Prosser Village Production Well • Drilling, construction, and testing of the Old Greenwood Production Well • Drilling and construction of the Featherstone Exploration Well • Drilling and construction of the Alder Drive Exploration/Test Well - • Drilling,construction, and testing of the Martis Valley Production Well • Well rehabilitation and testing of the Glenshire Drive Production Well • Well sampling and testing of the Martis Valley Production Well • Conducted basin-wide groundwater investigation to select prospective production well sites • Drilling,geologic sampling, and water quality collection at four deep exploration sites • Conducted pumping test on Prosser Heights Production Well • Well rehabilitation and testing of the Northside Production Well P.O.Box 18793 Reno,NV 89511 •(775)250-9700•Fax(775)852-3642 •david@aquagroundwater.com•www.aquagroundwater.com In addition to being the groundwater consultant for the Truckee Donner Public Utility District, AquA is also the groundwater consultant for the Truckee Meadows Water Authority(TMWA) (since 1998) and Carson City Public Works Department(since 2006). During this time period the following projects which are similar to the proposed Fibreboard Well have been completed: • Drilling,construction, and testing of the replacement well No.24 (2007-Carson City) • Drilling, construction, and testing of the Sparks Police Station Production well(TMWA) • Drilling,construction, and testing of the Sparks High School Production Well(TMWA) • Drilling,construction, and testing of the Dilworth School Production Well(TMWA) • Drilling, construction, and testing of the Prater Way Production Well (TMWA) • Drilling,construction, and testing of the Hawkings Court Production Well(TMWA) • Drilling,construction,and testing of the Silver Lake Production Well(TMWA) • Drilling,construction,and testing of the Huffaker Circle Production Well(TMWA) • Drilling,construction, and testing of the Mendive School Production Well(TMWA) During all of the listed projects completed for both Carson City and the Truckee Meadows Water Authority,technical drilling and testing specifications were prepared and sent to prospective drilling contractors. On all projects detailed on-site supervision and data collected was provided. After the production wells were constructed,extensive development and pumping test programs were conducted. All of the field data collected and analyzed was included in a final report. 3.0 Staff members experience and resumes The following are the AquA personnel who will be assigned to the project. Because drilling, constructing, and testing of the well require 24-hour coverage,I have included extra staff and their qualifications if they are needed. Detailed resumes are included at the end of the proposal. Project Manager-David Carlson- Senior Hydrogeologist-State of California,Professional Geologist No. 8209. 1 will be the project manager. I have over 26 years of hydrogeologic experience and since 19881 have been the project manager/groundwater consultant to the Truckee Donner Public Utility District. During this period time I have supervised the drilling, construction,and testing of the Martis Valley production well,the Prosser Village production well, and the Old Greenwood production well. Support personnel Richard Johnson-Project Geologist/Hydrogeologist Mr. Johnson has over 18 years as a ground water hydrologist. Mr. Johnson has supervised groundwater resource development programs for -^ mining clients and municipal utilities. Programs that Mr. Johnson has supervised included drilling operations,well construction,well development,and aquifer testing of numerous large- diameter municipal wells for TMWA. He also provided on-site supervision and data collection ... for the Glenshire Drive production well and the Prosser Annex production well. David M Carlson-Geologist/Groundwater Modeler Mr. Carlson has 6 years experience in the supervision of drilling and construction of production wells and associated air-lift and pump development programs. Mr. carslon provided on-site supervision and data collection during the drilling,construction,and testing of the Prosser Village production well and the Old Greenwood production well. Ron Petersen-Hydrogeologist/Geophysicist Mr. Petersen has over 30 years experience in hydrogeologic investigations,groundwater resource maping and evaluation,groundwater "°" modeling,and environmental investigations. Mr.Peterson specializes in the use of geophysics to map groundwater. Mr. Peterson has supervised and provided data collection during several 10- day pumping tests during the past two years. He has also provided field supervision during the drilling,construction,and testing of four large diameter,high capacity production wells during the past two years. Bettina Warner—Geologist Ms. Warner in the past two years has completed several water supply projects.Ms. Warner provided on-site supervision and data collection for the drilling, construction,and pumping test conducted on the Old Greenwood production well. She also provided supervision for the construction of several municipal wells for the Truckee Meadows Water Authority. Noel Liner—Geologist Mr. Liner has 5 years experience in geomorphology and surface water hydrology as well as professional consulting experience in the areas of geotechnical and slope _ stability issues. Mr. Liner has provided field supervision and data collection during the construction of four large diameter production wells and the pumping tests conducted on these wells. 4.0 Description of services to be provided The services that will be provided for the Fibreboard well drilling,construction,development and pumping test will be very similar to the services that were provided for the Prosser Village production well and the Old Greenwood production well. A description of the services to be provided are as follows: • Review the geologic,air-lift results,and water chemistry data from the exploration borehole that was drilled at this site. • Prepare well drilling,construction,and air-lift development technical specifications. • Prepare pump development and testing technical specifications. • Attend pre-bid meeting with drilling and pump contractors and Truckee Donner Public Utility District staff. Answer technical questions regarding the expected geology and drilling conditions.Assist District in preparing addendum to specifications if required. • Assist District is evaluation of submitted drilling and pump bid documents. • Provide supervision and data collection during the drilling of the borehole to its anticipated depth of 1,200 feet. These activities will include developing a detailed geologic log of the drill cutting derived from the borehole;record drilling material used; record drilling penetration rate; and review daily drilling logs developed by the drilling crew. -- • Supervise and review geophysical survey of borehole. • Ensure that the drilling contractor follows the technical specifications. • Supervise the construction of the well. ,^ • Provide on-site supervision and data collection during air-lift development. • Provide on-site supervision and data collection during the double-swab pump development and the collection of water quality samples. Samples will be delivered to Sierra Environmental Laboratory. • Provide on-site supervision and data collection during the pump development program. • Provide on-site supervision and data collection during the step-drawdown test and the constant-discharge pumping test. This includes providing data loggers to record the drawdown in the production well during the pumping and recovery phases of the program. 0 Provide on-site supervision during the downhole video survey and the plumbness survey. m • Summarize all field activity and data collected with analysis of pumping test data, and prepare a final report which shall contain recommendations regarding production pump setting and yield. 5.0 Description of staffing level As a result of the anticipated 24-hour drilling,development, and testing activity I will be the .. project manager full-time,with Richard Johnson, David Carlson Jr.,Ron Petersen, and Tina Warner providing field activity coverage.All of the support staff has worked on previous Truckee Donner Public Utility District well construction and testing projects. I will attend all of the meetings required and provide support to the District staff as required. 6.0 QA/QC procedures To be consistent and provide the District staff with a highest quality product,all documents generated by AquA will be submitted to the District in draft for their review prior to be submitted in a final version. In house review is also part of our QA/QC procedures. When a document is generated,it goes through a review prior to being sent out,either as a draft or final version. I try to review all documents that are sent out, and if I cannot conduct the review, either Richard Johnson or David Carlson Jr. does the reviewing. 7.0 Firm's insurance coverage The following is a list of our insurance coverage. With regards to the comprehensive automobile coverage,we are currently getting a quote to upgrade to your$500,000 requirement. General aggregate $1,000,000 Professional liability $1,000,000 Workers Compensation $1,000,000 8.0 Subcontractors We will not be using any subcontractors. 9.0 Projects I have included in the following section several project write-ups for recently completed Truckee Donner Public Utility District projects. If you have any questions regarding this proposal,please contact me at (775)250-9700. Sincerely, A�q\uA Hyddrogeologic Consulting David Carlson Senior Hydrogeologist �CRO FUGRO WEST, INC. FIBREBOARD WELL AND ADDITIONAL WATER SUPPLY WELLS ,. TECHNICAL PROPOSAL Prepared for: TRUCKEE DONNER PUBLIC UTILITY DISTRICT May 25, 2007 r, Fugro Proposal No. 2007.170 r - -- �ORO FUGRO WEST, INC. 502 Giuseppe Court,Suite 11 Roseville,California 95678 •- May 25, 2007 Tel:(916)773-2600 Proposal No. 2007.170 Fax:(916)782-4846 Truckee Donner Public Utility District -" Post Office Box 309 11570 Donner Pass Road Truckee, California 96160 Attention: Mr. Neil Kaufman Water System Engineer -- Subject: Technical Hydrogeologic Consulting Proposal, Observation and Inspection Services, Fibreboard Water Well Drilling Project Dear Mr. Kaufman: In response to your Request for Proposal (RFP) dated April 12, 2007, Fugro is pleased to submit our qualifications and costs related to professional hydrogeological, observation and inspection services for the proposed drilling of one water supply well. The Truckee Donner Public Utility District (District) anticipates drilling of the Fibreboard Well during the summer of 2007. We understand that the scope of work may include siting and construction of additional water supply wells in the future. This document constitutes the Technical Proposal for the subject project. The Cost Proposal is contained in a separate document. We appreciate the opportunity to bid on this upcoming work and plan to provide reliable, technically sound services to the Truckee Donner Public Utility District. Please call if you have any questions regarding our proposal. - Sincerely, FUGRO WEST, INC. Nels Ruud, Ph.D. Project Hydrogeologist Peter Leffler,qGHg. Associate Hydrogeologist Paul Sorensen, P.G., C.Hg. for David Gardner, P.G., C.Hg. Principal Hydrogeologist Attachments: Appendix A- Resumes Appendix B - Examples of Certificates of Insurance A member of the Fugro group of companies with offices throughout the world. - - — - -- --- - -- ---- — ------ - ---------- -- ._.. Truckee Donner Public Utility District !�` *-� May 25,2007(Proposal No.2007.170) ON Fugro Company Profile SACRAMENTO OAKLAND 502 Giuseppe Ct.,Ste. 11 1000 Broadway, Ste.200 Roseville, CA 95678 Oakland, CA 94607 Contact: Peter Leffler, P.G, C.Hg. Phone: (510)267-4415 FAX: (510)268-0137 Email: pleffler@fugro.com Fugro has been operating in California since 1977. The firm has grown internally and through the acquisitions of highly respected local firms. Fugro's Water Resources Group is concentrated in our Roseville, Oakland, San Luis Obispo, and Ventura offices. It is anticipated that our Roseville office will be serving most of the field needs for your projects, with the continuous backing of Water Resources staff in our other offices. Fugro has broad expertise in water resources management and development. We have conducted hundreds of individual well design and well field development investigations, •- hydrogeologic investigations, basin safe-yield investigations, aquifer storage and recovery projects, water quality evaluations, desalination project feasibility studies, and groundwater basin management studies. Fugro provides well siting, well design recommendations, preparation of well construction plans and specifications, construction observation, and production testing for municipal and private water wells. Fugro's extensive experience in hydrogeology and well design is critical to successful well production. Perforation placement, perforation slot size, gravel pack gradation, casing design and installation, and gravel packs and cement seal placements are custom designed for each well. Fugro engineers and hydrogeologists assist clients in evaluating contractor bids and managing well construction and testing. As the client representative, we oversee the well construction, documenting the "as-built" conditions, design the production testing program, make recommendations for the optimal well discharge rate, and pump settings. We test and ._ document well yield, specific capacity and pumping level variations, and collect samples for water quality analysis. Water level monitoring is accomplished using downhole pressure transducers connected to microprocessor data loggers, which Fugro maintains as part of its inventory of well testing equipment. Fugro has extensive experience in evaluating and determining the causes of diminished production or injection capacity in water wells. Assessments include specific capacity testing, water quality analysis, particulate filtering and analysis using electron-microscope analysis, video logging, and review of operational data. Using these data, Fugro investigates the cause of the problem and recommends solutions for restoring well capacity. Fugro's water well services are supported by our knowledge of the regulatory framework permits (RWQCB, NPDES, DOHS), which govern well development and rehabilitation. 2 a Truckee Donner Public Utility District ORO May 25,2007(Proposal No.2007.170) a Fugro project experience includes the following: Rio Linda/Elverta 2007(in Community Water progress) Rio Linda(Well 14) 705 16 1500 Municipal ..- District City of Gilroy 2006 Gilroy(Forest Park) 350 18 2300 Municipal California Water 2006 King City(Well No. 13 240 16-5/8 2000 Municipal Service Company 2006 King City(Well No. 14) 240 16-5/8 2000 Municipal City of Soledad 2004 Soledad (Well No. 11) 700 16 1500 Municipal 2002 Bixler 350 16 3500 ASR Production/ East Bay Municipal Injection Utility District 1999 San Leandro 540 6 500 Test Well 1999 San Lorenzo 662 18 2000 ASR Production/ Injection Santa Clara Valley 1997 Campbell 800 16 2000 ASR Production/ Water District Injection 1999 Gardena(Ballona) 400 18 1000 Municipal 2002 Artesia(Roseton 2) 960 18 1000 Municipal 2000 Hawaiian Gardens(Juan) 900 18 2000 Municipal 2004 Gardena(Ballona) 430 18 1000 Municipal Golden State Water 2004 Bell(Otis) 1570 18 900 Municipal Company 2002 Wrightwood(Basel Test 1080 Test Hole Hole) 2001 Inglewood(Yukon 5) 650 18 1250 Municipal 2000 Inglewood(Yukon 4) 600 18 1500 Municipal 2002 Hawthorne(129th St.) 800 18 2000 Municipal 2001 Gardena So.No.6 750 18 1000 Municipal 2000 Pleasanton 740 12 200 Test Well Zone 7 1999 Pleasanton 600 12 780 Test Well Alameda County 1999 Pleasanton 600 12 500 Test Well 1999 Pleasanton 760 12 700 Test Well References (contact and phone number)for clients are provided below. Agency Well Date of Well Yield Location Contact Phone No. •- Name Service (gpm) City of Soledad Well No. 11 2004 1,000 Soledad Cliff Price 831-687-3963 East Bay Municipal Utility Oro Loma 1999 1,500 Oakland Mike Tognolini 510-287-0125 District Golden State Los �-- Water Several Current 900-2,000 Angeles Joe Minicci 714-535-7711 Company City of Gilroy Forest Park 2006 2,300 Gilroy Dan Aldridge 408-846-0271 California King City 13 Water Service and 14 2006 2,000 King City Ted Coughlin 408-210-9035 Company 4 _--------- ------ _-___.._ _____ -__-.-- Truckee Donner Public Utility District -- May 25,2007(Proposal No. 2007.170) • Design and management of construction observation services for numerous municipal water supply wells throughout California. • Long-term association with ground water issues related to surface mining for such clients as Vulcan Materials Company, Hansen PLC, Granite, and Tulare County. • Lead investigator for a comprehensive water resources investigation and safe yield determination of the 340,000-acre Kaweah Delta Water Conservation District in Tulare County. • Directed or assisted in preliminary desalination feasibility studies for the City of Long Beach Water Department, Cambria Community Services District, and the City of Arroyo Grande. • Managed many hydrogeologic studies relating to groundwater management water supply development, safe yield studies, municipal well design, seawater intrusion abatement, desalination, artificial recharge, and groundwater quality. Mr. Peter Leffler, P.G., C.Hg., Associate Hydrogeologist, has more than 15 years of experience performing hydrogeologic studies in California. His experience includes design and construction management for water supply wells, test wells, and monitoring wells; pumping tests and data analysis; groundwater basin management, artificial recharge, salt loading impacts, salt water intrusion, groundwater modeling, water resources planning, contaminant hydrogeology, and surface water studies. Mr. Leffler has performed all phases of these studies including project management, proposal preparation, fieldwork, data analysis, report preparation, and presentations. Mr. Leffler's experience includes: • East Bay Municipal Utility District. Performed regional groundwater basin analyses and developed steady state/transient groundwater flow models of the Bixler area in east Contra Costa County. Also conducted pumping and injection testing of a large-diameter well in preparation for implementation of a 1 MGD pilot scale ASR project in the East Bay Plain in Alameda County. • City of Gilroy. Project Manager for a municipal well siting study, installation of eight test wells, and design/installation/testing of one production well. Work is ongoing with preparation of well specifications for a second municipal water supply production well. • Rio Linda/Elverta Community Water District. Project Manager for a municipal well siting study, and design/installation/testing of one water supply production well. Work is .- ongoing with construction of the municipal water supply production well. • Kaweah Delta Water Conservation District. Served as Project Manager for development of a regional groundwater flow model of the District. The project area encompassed approximately 340,000 acres and the model incorporated the various components of recharge and discharge. The transient model was calibrated and used to simulate several scenarios of future water supply and demand. 6 —-- -- --- - --. . - --- --- ----- - --- ----------- Truckee Donner Public Utility District . , -- May 25,2007(Proposal No.2007.170) Mr. Tim Nicely, Project Hydrogeologist, has more than 7 years of experience performing hydrogeologic studies in California related to construction management and observation for installation of municipal, test and observation wells, aquifer testing, numerical modeling of groundwater flow and transport, and groundwater basin analyses. His responsibilities include project planning, implementation and management; field work; data collection, compilation and analyses, report preparation and project management. Mr. Nicely's project experience includes: • Golden State Water Company. Coordinated and conducted field work related to .— nine large diameter production wells in Los Angeles County including project planning, contractor observation for drilling, depth-specific zone testing, well construction, development, lithologic logging, pumping aquifer tests; water quality sample coordination; NPDES permit .-� compliance oversight; and report preparation • Bixler Site Investigation, East Bay Municipal Utility District. Performed field activities associated with installation of five monitoring wells in order to explore the spatial extent of an aquifer; performed contractor observation for drilling, development and aquifer pump testing of each well; performed lithologic logging and sample collection; analysis of aquifer test data; and report preparation • City of Ventura Well No. 11 - Coordinated and conducted all phases of work related to a large diameter production well including project planning, contractor observation for drilling, lithologic logging, well construction, development, pumping aquifer tests; water quality sample coordination and analysis; NPDES permit compliance oversight; and report preparation. • City of Soledad Well No. 11 - Coordinated and conducted field activities related to the installation of a large diameter production well including assistance in project planning, contractor observation for drilling, lithologic logging, well construction, development, pumping aquifer tests; water quality sample sampling; NPDES permit compliance oversight; and report preparation. Anticipated Scope of Services The scope of services is summarized in the RFP and divided into 5 general tasks as outlined below. Since the tasks are well documented in the RFP, it is the intent of this section to summarize which staff would be involved in each task. Each of the Fugro staff involved in every task has extensive experience in well siting and installation projects. The project manager will be directly involved in all aspects of project planning, site meetings and report preparation. The contractor observation and on-site work will be performed by field staff under direct supervision by the project manager. Task 1 —Assist District Staff in Preparation of Bid Documents for Fibreboard Well Preparation of two bid documents related to 1) Well Drilling and Construction and 2) Well Development Pumping will be prepared by Mr. Peter Leffler, Project Manager and Mr. David Gardner, Principal-In-Charge. Mr. Leffler will attend both pre-bid meetings and assist the District 8 Truckee Donner Public Utility District May 25,2007(Proposal No.2007.170) Description of Quality Assurance/Quality Control procedures Fugro West, Inc. is in the business of providing a broad range of consulting services to a diverse client base. We strive to be the leading West Coast provider of geoscience solutions for land and marine engineering applications. We deliver outstanding services with professional, highly specialized staff and advanced technologies. The company has applied the ISO9001:2000 standard to its business and operational activities and has documented and implemented a totally integrated Quality Management System (QMS). Fugro West, Inc. does not design or develop products. The customers or their consultants specify all principal product characteristics. Our engineering activities are limited to developing methods and means of meeting these requirements. The Managing Director/President is responsible for the Quality Management System. The Quality Manager is top managements' representative responsible for the establishment, implementation, promotion and maintenance of the QMS throughout the organization. Description of Firm's Insurance Fugro will comply with the Insurance and Indemnification Requirements set forth by the District. Examples of Certificates of Liability as evidence of coverage are included in Appendix B. Fugro will provide original Certificates upon Contract execution. Acknowledgement of Liability Clause Language Fugro has reviewed the Liability clause in the RFP and finds it acceptable for incorporation into the contract. Listing of Subcontractors We will perform all aspects of work in-house using Fugro staff. We will not use any subcontractors. 10 Truckee Donner Public Utility District Proposal for HYDROGEOLOGwIC CONSULTING SERVICES AM 'N xxr S n<t n 1 1 M I�, n ' c.. �I•1 a r? � ,4 .` f � I W C3 C] C> 4R C7 C>G E F•R S DEVELOPING INNOVATIVE DESIGN SOLUTIONS 3301 C Street, Bldg 100-B ay 29.9 2007 Sacramento, CA 95816 Tel: 916.341.7760 Fax: 916.341.7767 �- WCDOC> -RDC) GEFRS May 25, 2007 Mr. Neil Kaufman,Water System Engineer Truckee Donner Public Utility District P.O.Box 309 Truckee,California 96160 Subject: Hydrogeologic Consulting Services Proposal for Fibreboard Well Dear Mr.Kaufman: Truckee Donner Public Utility District(District)provides drinking water to its customers from a network of water supply wells. The District has faced challenges in constructing its wells, including:hard drilling,high-cost projects, and contractor claims. Some of these challenges- '` for example,hard drilling conditions and lost circulation-are inherent in the District's geologic setting and cannot be avoided,and Wood Rodgers has the experience to help the District minimize the impacts of these challenges. However, some of the other problems the District has experienced,with high-cost projects and contractor claims,can be avoided with a targeted project approach that is based on advanced drilling engineering methods. }- Because of the approach used on past District well projects,the pool of qualified drillers who .- are willing to bid District well projects has decreased. Some drillers who are willing to bid have increased their prices to compensate for the foreseeable problems that will result from outdated project approaches. To obtain high-quality and cost-effective well projects,it is imperative for the District to reverse this trend so that the best drillers in the industry will bid District well jobs at competitive prices. Based on my 27 years of experience in drilling engineering,I am confident that the way to accomplish this is to design new well projects using sophisticated ,., methods to reduce the uncertainty for drillers,and to manage the projects proactively so that developing issues are dealt with before they become change orders or catastrophic problems. I believe that it is time for the District to consider an updated approach to well projects-one that will provide the highest quality and most cost-effective well possible. The attached proposal describes what the Wood Rodgers team brings to the table. We look forward to the opportunity to show the District how smoothly its well projects can run. If you have any questions,or would like to discuss our approach in more detail,please contact me at (916)341-7447. .. Sincerely, Lawrence H. Ernst,PG,CEG,CHG Senior Hydrogeologist Kv:amb\07062 w—w- corn Sacramento, CA San Francisco, CA Reno, NV Salinas, CA Modesto, CA Oakland, CA — 01 IBM L=1 = ENGINEERING May 24, 2007 Neil Kaufman—Hydrogeologic Consulting Proposal Water System Engineer Truckee Donner Public Utility District PO Box 309 Truckee, California 96160 Dear Mr. Kaufman Farr West Engineering is pleased to submit this proposal to the Truckee Donner Public Utility District (TDPUD) to develop additional groundwater resources for the District. Farr West is a Nevada Corporation, based in Reno, Nevada. We specialize in water resource development, environmental engineering, and project management. For reasons that will become apparent in this proposal, we have teamed with the local Reno Quad Knopf office on this project. Quad Knopf s technical staff have worked together with Farr West's staff in the Reno Tahoe area and specifically in the TDPUD service area over a period of approximately 20 years. Together, this team has the experience and skills needed to complete this project cost effectively and on schedule. Team Strengths: • Two Professional Geologists licensed in the State of California. • Certified Hydrogeologist in the State of California. • Site specific production well drilling experience within the TDPUD service area. • Prepared Groundwater Resource Evaluations for TDPUD. • Prepared Groundwater Availability Study for the Martis Valley area. • Experience with drilling, construction and permitting within the northern Sierra and Tahoe basin. • Extensive experience with aquifers in volcanic and alluvial geologic settings. • Support of civil engineering staff focused on water supply projects. • Extensive aquifer/zone specific water quality testing experience. • Experience with efficient well designs that can result in significant energy savings through the life of the well. • Experience with well construction methods to minimize incrustation and corrosion. 5442 LONGLEY LANE, SUITE B • RENO NV 89511 9 (775) 851-4788 • FAX (775) 851-0766 Benefit to the TDPUD: • Depth of two experienced professionals • Provide greater insight, internal review and backup • Provide full-time staff and commitment to the project goals • Close contact and communication with PUD staff to make sure that goals are accomplished. As our local communities in the Lake Tahoe area grow, much effort is needed to ensure that current and future groundwater development is carefully planned and implemented to incorporate safe, long lasting, energy efficient well designs. Farr West has the experience and expertise to evaluate the hydrogeologic environment, select optimum well sites, and oversee the physical design and construction of the well to achieve these objectives. Farr West and Quad Knopf are dedicated to the success of our local communities and appreciated the opportunity to propose on this work. Thank you for taking the time to review the submitted proposals. Sincerely, Kirk Swanson, PhD Brent Farr, PE David Westhoff, PE Senior Hydrogeologist President Senior Hydrogeologist Farr West Engineering Farr West Engineering Quad Knopf 5442 LONGLEY LANE, SUITE B 9 RENO NV 89511 • (775) 851-4788 • FAX (775) 851-0766 FARR WEST ENGINEERING Technical Proposal for Hydrogeologic Consulting Services Fibreboard Well Installation and Testing May 2007 i Well Drilling Project near Rye Patch Reservoir,Nevada Submitted By: Submitted To: Kirk Swanson,PhD Neil Kaufman,P.E. Farr West Engineering Water System Engineer 5442 Longley Lane, Suite B Truckee Donner Public Utility District Reno,Nevada 89511 P.O. Box 309 Truckee, California 96160 SECTION 1.0 INTRODUCTION Farr West Engineering (Farr West) is pleased to submit this technical proposal to Truckee Donner PUD. This submission is related to hydrogeologic consulting services requested by the TDPUD. Farr West was formed with the goal of maintaining personal working relationships with clients while providing engineering services that are cost-effective. Farr West Engineering specializes in water and wastewater utility management, facility design and construction; primarily for public agencies in metropolitan and rural communities. This proposal has been divided into the following sections: TECHNICAL PROPOSAL SECTION 1.0 INTRODUCTION SECTION 2.0 FIRM INFORMATION 2.1 CONTACT INFORMATION 2.2 FIRM DESCRIPTION 2.3 INSURANCE AND IDEMNIFICATION SECTION 3.0 PROJECT EXPERIENCE AND STAFFING 3.1 FIRM EXPERIENCE 3.2 TEAM EXPERIENCE 3.3 STAFFING LEVEL REQUIREMENT SECTION 4.0 SCOPE AND SERVICES 4.1 INTRODUCTION 4.2 FIBERBOARD WELL CONSTRUCTION AND TESTING RFP Task 1 RFP Task 2 RFP Task 3 4.3 SITING OF ADDITIONAL WATER SUPPLY WELLS RFP Task 4 4.4 QUALITY ASSURRANCE/QUALITY CONTROL APPENDIX A TEAM MEMBER RESUMES APPENDIX B INSURANCE CERTIFICATES COST PROPOSAL—SUBMITTED SEPARATELY RFP Hydrogeologic Consulting Services - 1 - Farr West Engineering Truckee Donner PUD May 24,2007 SECTION 2.0 FIRM INFORMATION 2.1 CONTACT INFORMATION Farr West Engineering will be the lead firm on this project for contracting and project management. Quad Knopf also has the qualifications and experience to conduct the proposed work outlined in the request for proposal but will take a supportive role in this project. Far West Engineering Quad Knopf 5442 Longley Lane, Suite B 9600 Prototype Court Reno,NV 89511 Reno,NV 89521 (775) 851-4788 (775) 324-1212 Kirk Swanson, PhD David Westhoff, PG (775) 853-7257 direct (775) 857-7117 cell kirknfweng com davidwkguadknopf 2.2 FIRM DESCRIPTION Farr West Engineering is a Reno-based Nevada Corporation that was created in 2001. We specialize in environmental engineering, project management and utility planning. Almost all of our clients are public entities. Our firm is comprised of professional engineers, associate engineers and technicians. We have a total staff of fourteen professionals in the Reno-Tahoe area. We have teamed with Quad Knopf, in Reno Nevada. Farr West and Quad Knopf staff have a special interest in this project due to a long history of work in the Truckee area including resource evaluations and groundwater availability studies. Although Farr West or Quad Knopf could have proposed independently, combining our staffing resources guarantees experienced professional staff during the busy drilling/well construction season. With our combined experience in the Truckee area, we will make an exceptional team. Kirk Swanson and David Westhoff began working together at Hydro-Search Inc. approximately 20 years ago and have a strong professional relationship. Quad Knopf s comprehensive array of services includes water supply and treatment design. Since its inception in 1972, the firm has had the objective of providing public agencies the services of professionals with extensive experience to successfully complete their projects. Quad Knopf has a staff of nearly 300 employees in five offices spanning California and Nevada providing integrated services in the broad disciplines of civil engineering, land use planning, environmental services, and biology as one full-service unit. RFP Hydrogeologic Consulting Services -2- Farr West Engineering Truckee Donner PUD May 24, 2007 -� 2.3 INSURANCE AND IDEMNIFICATION Insurance Farr West carries comprehensive general liability insurance at limits of$4,000,000 (aggregate) which significantly exceeds the minimum project requirements. Automobile insurance carried by Farr West with a limit of $1,000,000 (per accident) also exceeds District's project requirements. Farr West also maintains statutory required workers compensation insurance. Insurance certificates have been included in Appendix B for reference. Indemnification Farr West will agree to the following indemnification requirement as stated in the request for proposal; "The Consultant shall indemnify and hold harmless the DISTRICT, its directors, officers, partners, agents, and employees from and against any and all liability, claims, demands, damages, losses, and expenses, including but not limited to attorney's fees, for which the Consultant is determined to be legally liable resulting from negligent acts, errors, or omissions by the Consultant, its directors, officers, agents, and employees in performance of services required by this Agreement. Liability, claims, demands, damages, losses, or expenses resulting from the negligent acts, errors or omissions, whether active or passive, by the DISTRICT, its directors, officers, partners, agents, employees, or by others are excluded from the Consultant's obligations pursuant to this paragraph." RFP Hydrogeologic Consulting Services - 3 - Farr West Engineering Truckee Donner PUD May 24,2007 SECTION 3.0 PROJECT EXPERIENCE AND STAFFING LEVEL 3.1 FIRM EXPERIENCE Farr West is prepared to provide qualified and experienced personnel for hydrogeologic field services for water resources exploration and development projects under the direction of the Truckee Donner Public Utility District's Water System Engineer. Our staff has more than 60 years of combined water resource exploration, development, and management experience and includes Professional Engineers licensed in California, and Nevada; Professional Geologists licensed in California; and a Certified Hydro-Geologist registered in California. Farr West's professionals have conducted water resource exploration/development and well installation projects both internationally and domestically, from remote mine sites in the Andes to highly regulated U.S. Department of Energy locations. In addition, Farr West's staff has experience with a wide variety of exploration techniques, drilling methods, service contractors, and well designs. Our staff has managed all aspects of groundwater exploration and development programs with drilling budgets alone in excess of $4M. Farr West has a long history of data collection, interpretation, and presentation. Quad Knopf has demonstrated the ability to work with clients, sub-consultants, regulators, various governmental agencies and the public. 3.2 SIMILAR PROJECTS Farr West and Quad Knopf hydrogeologists have worked on several well projects in the Truckee area for TDPUD, Placer County and private development including: • In excess of 10 testing/production well sites • Water Resources Evaluation Studies • Groundwater Availability Study In addition to water resource development projects, Farr West has also completed many well facility design projects. The following similar projects represent the experience of staff members of Farr West Engineering and/or Quad Knopf. Some of the projects listed involved staff members while they worked at other firms. ➢ Water Resource Development: Truckee-Donner Public Utility District — Truckee, CA. Developed the hydrogeologic characterization of the watershed for the District. Successfully completed project objectives including exploration and production well drilling program for an additional 6,000 to 8,000 gpm water supply in interbedded fractured volcanic and alluvial units. Determined the amount of groundwater available based on precipitation, recharge and water use. Project included compilation of well logs and constructing geologic cross-sections. Previous experience working for the TDPUD involved data analysis of exploration and production well drilling and testing and field supervision of water supply well drilling in interbedded volcanic and alluvial units. Started working for the District in 1990s for Hydro-Search Inc. Participated in drilling of over 12 test/production well within the groundwater basin. ➢ Groundwater Budget Study: Truckee Donner Public Utility District — Truckee, CA. Provided technical review of a groundwater budget study for Martis Valley. The study RFP Hydrogeologic Consulting Services -4- Farr West Engineering Truckee Donner PUD May 24,2007 required an analysis of precipitation, soils, geology, surface runoff, streamflow and groundwater recharge. The objective of the study was to estimate the availability of ground water. ➢ Water Resource Development: Tulelake Irrigation District — Tulelake, CA. Responsible for the development of an 80,000 gpm irrigation well field under an emergency drought declaration issued by the Governor. Installation of ten new wells (24-inch, up to 2,600 ft.) was completed within 3 1/2 months and under budgeted monies of $4M. Project included evaluation of hydrogeology and basin recharge characteristics, coordination of surface and downhole geophysical contractors, drilling contractors, pump vendors, and interaction with local, state, and federal agencies. Designed wells and pump assemblies, prepared bid specifications, evaluated pumping interference and impacts, and provided overall technical oversight of all activities. Overall project, including pumps and other outside services completed within total budgeted monies of$5M. ➢ Water Resource Development: South Lake Tahoe, CA. Responsible for exploration, testing and installing municipal wells from 1994 to present. The objective of the project has been to minimize naturally occurring and introduced contaminants as well as improving infrastructure of the PUD water and waste water facilities. ➢ Groundwater Exploration: South Lake Tahoe Public Utility District — South Lake Tahoe, CA. Responsible for zone testing and installing municipal wells for the past ten years. Provided oversight of 94 mm core drilling, SimulProbe®, and temporary well zone specific sampling to determine material and water quality of specific intervals. Water quality issues have included MTBE, arsenic and hydrogen sulfide. ➢ Groundwater Exploration: Spring Creek Tract — South Lake Tahoe, CA. Responsible for the development of a water supply, during the short construction season, that significantly exceeded demand and water quality requirements in an environmentally sensitive area at relatively low cost compared to other alternatives. This project resulted in the deepest Roto-sonic hole in western United States RFP Hydrogeologic Consulting Services - 5 - Farr West Engineering Truckee Donner PUD May 24,2007 ➢ Water Resource Evaluation: Churchill County Community Development — Fallon, NV. Conducted independent third party review of proposed water supply development for new residential and industrial development in the Hazen area. ➢ Water Resource Development: Canyon General Improvement District — Sparks, NV. Provided project management for the development of a water supply, within limited time frame. Previous exploration efforts resulted in the drilling of greater than 20 unsuccessful boreholes. This effort relied on developing a conceptual hydrogeologic model based on surface geology, existing well logs and recharge characteristics of the area. A water supply source in excess of 1500 gpm was developed which greatly exceeded the supply requirement of 200 gpm. Interfaced directly with funding, regulatory and contractors to insure timely completion of the project. ➢ Well Facility Design: Truckee Meadows Water District, Reno, Nevada. This project involved the complex design of two wells pumping to a common discharge, with blending at specified levels in order to maintain water quality. The wells were located between the football field and parking lot of Reed High School in Sparks, Nevada. Farr West designed the pumping facilities while TMWA used the services of another consultant for well drilling. Brent Farr was the lead engineer and project manager on this project. ➢ Water Resource Development and Well Facility Design: City of Yerington, Nevada. Farr West ,�.... Engineering acts as the City Engineer � k for the City of Yerington. In March of �� G this year, the City lost one of their largest producing wells. As the irrigation season was set to begin, the City requested Farr West to assist with the drilling and equipping of a new well. Kirk Swanson managed the project, providing a well design, along with development specifications. He also supervised all field activities. Following well development, Brent s Farr provided a design for new well facilities, including new submersible pump capable of producing up to 1,600 gpm. ➢ Groundwater Exploration: Somersett Development LLC — Reno, NV. Responsible for the development of an irrigation water supply for landscaping plants during droughts. Previous efforts had encountered limited aquifers comprised of low permeability materials in bounded aquifers resulting in production wells with limited capacity. Identifying unmapped faults and designing a test well program to identify the faults resulted in discovering a more than adequate water supply. Artificial recharge of the bounded aquifers is being considered. RFP Hydrogeologic Consulting Services - 6 - Farr West Engineering Truckee Donner PUD May 24,2007 ➢ Water Resource Development: Municipal Well — City of Tulelake, CA. Provided the analysis of the existing wells and designed and supervised the installation of a new municipal well. The new well incorporated corrosion resistant features and was completed to a depth of 2761 ft. ➢ Well Facility Design: City of Yerington, Nevada. Brent Farr led the design efforts of a major well house rehabilitation project involving two existing facilities: Mason Well (1,000 gpm) and Rio Vista Well (250 gpm). These two existing facilities were in need of major upgrades, including new piping, well control valves, backup generator systems, and electrical controls; and for the Rio Vista Well, a new submersible pump and well house. ➢ Well Facility Project Management: Lyon County Utilities Department, Dayton, Nevada: Farr West managed the drilling and construction of two major well facilities in Dayton,Nevada. The first well facility was the Cardelli Well (1,500 gpm). The second well was the Rolling A Ranch Infiltration Well (3,000 gpm). Both of these projects were designed by another firm, but managed for the County by Farr West Engineering. 3.3 TEAM EXPERIENCE The project team members are all full-time employees at Farr West or Quad Knopf. Farr West employs several construction inspectors that will be utilized if appropriate activities require general construction oversight. Because of the significant contracting costs and to avoid problems with data inconsistency, Farr West recommends full time professionals for direct oversight of drilling, well construction and aquifer testing. Two of our staff members, Dr. Kirk Swanson and Mr. David Westhoff, have direct experience with District projects involving tasks similar to those identified in the Request for Proposal. We are familiar with the District's specifications used in the past and the regulatory environment in the Truckee and Lake Tahoe area. From this collective experience our support staff is also familiar with the goals of the District's water supply construction and exploration objectives. Dr. Swanson, Senior Project Manager, will manage all project activities and provide technical assistance to the field staff. In addition, he will provide on-site project involvement during critical data gathering or construction periods. Mr. David Westhoff will remain on the project full time for the duration of the field operations and provide senior level support, backup project management (if required) and quality assurance. The team will oversee all field activities in accordance with the District's specifications and assure that District activities are manned with qualified staff under direct senior supervision. The entire project staff has water resources experience. RFP Hydrogeologic Consulting Services -7 - Farr West Engineering Truckee Donner PUD May 24,2007 We have thoroughly reviewed the project requirements identified in the RFP and feel that the following staff will fulfill the requirements for an experienced water resource team with local Martis Valley basin experience. Appendix A includes resumes for project staff, as well as a summary of the experience and qualifications of our support staff. Kirk Swanson: Extensive groundwater exploration, well installation/construction and testing. Dr. Swanson is a senior hydrogeologist with more than 20 years of international water resource project management including technical supervision of hydrogeologic, geophysical and geological engineering investigations. His hydrogeologic experience is extensive and includes a wide range of hydrogeologic media (alluvial, carbonate, metamorphic, plutonic, volcanic including primary/secondary fracturing) and environments. Projects include studies of local and regional systems for basin yield analysis, environmental impact statements, water supply, water rights, groundwater recharge, dewatering and contaminant transport/remediation projects for municipal, industrial (RCRA), Federal, open pit/underground mining and irrigation projects. Dr. Swanson has designed numerous drilling programs and well designs incorporating high efficiency and corrosion resistance with well depths greater than 5000 feet and production yields in excess of 12,000 gpm. David Westhoff: Extensive groundwater exploration, well installation/construction and testing. Mr. Westhoff has more than 25 years experience as a hydrologist/hydrogeologist for water resource assessment in both surface and ground water projects. His responsibilities have included project planning, supervision of well drilling and aquifer tests, site investigations, numerous submittals to FEMA, hydrologic and hydraulic modeling including models for dam µ permits, design of stormwater control structures, , report preparation, and presentation of results to clients and regulators. He has managed water supply development projects, water budget analyses, environmental investigations and hydrology projects. Gary Hurban: All phases of groundwater exploration, well installation/construction and testing. Mr. Hurban has 13 years of professional experience in geology, hydrogeology and hydrology. He has a broad breadth of experience and expertise in areas including water resource exploration and development, surface water modeling, GIS data analysis and AutoCAD drafting. Mr. Hurban has extensive field experience managing and supervising exploration drilling programs and coordinating sub-contractors to successfully and efficiently bring projects to completion. Early in his career he consulted directly with mining companies as an exploration and development consultant geologist in the mining industry. Brent Farr, P.E.: Well Facility Design. Mr. Farr is the owner and Principle Engineer at Farr West Engineering. He has experience designing well facilities throughout Nevada. If necessary, Mr. Farr can assist TDPUD with the design of well facilities after completion of drilling the Fibreboard Well. Prior to starting Farr West Engineering, Mr. Farr worked for Montgomery Watson(now MWH). RFP Hydrogeologic Consulting Services - 8- Farr West Engineering Truckee Donner PUD May 24, 2007 Greg Lyman: Drilling and well installation/construction and testing. Mr. Lyman is a Project Engineer who manages and designs his jobs under the direction of the Principal and Owner of Farr West Engineering. Mr. Lyman has four years of experience providing consulting services to public and private clients. His experience includes geotechnical, construction management, storm water, transportation, pavement design, surveying,traffic, and land development fields. Susan Jorgensen: Extensive experience with construction oversight and testing. Ms. Jorgensen is a project engineer who manages and designs her jobs under the direction of the Principal and Owner of Farr West Engineering. Ms. Jorgensen has three years of experience providing consulting services to public and private clients. Her experience is in a variety of areas including geotechnical/materials testing, construction management, and water and wastewater utility design. Heidi Frantz: Ms. Frantz holds a B.S. in Natural Resource and Environmental Science and has professional experience water resource investigations including a number of hydrologic research projects. Her specialties include aquifer testing and basin analysis, hydrologic and hydraulic modeling, floodplain and floodway delineations, and design of flood control structures, as well as a range related fieldwork. Her recent project work includes hydrologic and hydraulic modeling, project research and fieldwork, floodplain delineations and report writing/editing. 3.4 STAFFING LEVEL REQUIREMENT The project will require supervisory staff and twenty-four hour field staff during drilling and well construction and aquifer testing. Combing the resources of Farr West Engineering and Quad Knopf assures that complete backup of all positions including licensed supervisory positions. The importance of experienced hydrogeologists, familiar with the local hydrogeology, during critical periods of drilling cannot be stressed enough. Kirk Swanson and David Westhoff will provide complete overlap at the supervisory level and will have hours allocated to supervise drilling activities and assure project continuity and quality assurance. Kirk Swanson, David Westhoff or Gary Hurban will provide on site supervision during drilling in critical water production zones. Providing experienced senior supervision during drilling in all potential production zones will provide significant benefits to meeting the project goals. The expertise of Dr. Swanson, Mr. Westhoff and Mr. Hurban on site allows for the greater understanding of the geological processes and allows for a more accurate interpretation of the volcanic/alluvial rock units. RFP Hydrogeologic Consulting Services -9 - Farr West Engineering Truckee Donner PUD May 24,2007 3.5 REFERENCES We strongly recommend that you contact our references to better determine our qualifications and capabilities. Mr. Ron Penrose, Project Manager Truckee Meadows Water Authority 1155 Corporate Blvd. P.O. Box 30013 Reno,Nevada 89520-3013 (775) 834-8017 rpenrose(a,tmwa.net Mr. Mike Workman, Manager Lyon County Utilities Department P.O. Box 1699 Dayton,Nevada 89403 (775) 246-6220 mworkmanklyon-county.org Mr. Dan Newell, City Manager City of Yerington 102 South Main Street Yerington,Nevada 89447 (775)463-3511 managerkyerington.net Ms. Connie Butts, Manager Canyon General Improvement District 400 Canyon Way Sparks,Nevada 89434 (775) 342-0783 connieggbis.com No Bergsohn, District Hydrogeologist South Lake Tahoe Public Utility District 1275 Meadow Crest Dr South Lake Tahoe, CA 96150 (530) 543-6204 ivobgstpud.us Earl Danosky, Manager Tule Lake Irrigation District P.O. Box 699 Tulelake, Ca 96134 (530) 667-2249 RFP Hydrogeologic Consulting Services - 10- Farr West Engineering Truckee Donner PUD May 24,2007 SECTION 4.0 SCOPE AND SERVICES 4.1 INTRODUCTION The RFP describes the tasks and required services for the two primary objectives. The immediate objective is to drill, construct and test an additional municipal production well at the Fibreboard site so that an additional well can be added to the TDPUD water system. In addition, the District may request assistance in identifying future potential well sites. Section 4.2 discusses the Fiberboard Well construction and testing as provided in the RFP and provides additional details. Section 4.3 will discuss an additional water resource investigation. 4.2 FIBREBOARD WELL CONSTRUCTION AND TESTING The Fibreboard well location is situated in an area of andesitic lava flows and alluvial rock sequences. The ancestral Truckee River flowed directly northwest of the proposed site. The District has divided the services for installation of the Fiberboard Well in to four tasks. Farr West has modified the tasks provided by the District. The tasks included: Task 1 —Preparation of Bid Documents Farr West shall review all relevant data regarding the Fibreboard Well site including past well driller's reports and previous bidding documents. Two separate sets of bidding documents will be prepared; one for the drilling and one for the development pumping. The District shall prepare the General Specifications and other front end documents. The Consultant shall prepare Technical Specifications for the drilling contractor and pump contractor with the following primary components: Fibreboard Well Drilling and Construction: • Well Drilling • Construction • Airlift/Swab Development Fibreboard Well Development Pumping: • Pump Development • Aquifer Testing Careful attention to the Technical Specifications is critical to a successful project. The Technical Specifications can ensure that the best methods and drilling fluids are used during the drilling process. Completing the project quickly, utilizing the best methods, can ensure that the completed well is efficient with the lowest energy costs. The Technical Specifications also need to be explicit in regard to the well materials and methods of installation in the well construction. Materials that will provide the desired well life with minimal required maintenance need to be balanced against cost. RFP Hydrogeologic Consulting Services - 11 - Farr West Engineering Truckee Donner PUD May 24,2007 Farr West will attend both pre-bid meetings to answer questions from potential bidders. Farr West will assist the District in preparing responses to bidder questions and issuing addenda items as appropriate. After the bid openings, Farr West shall assist the District in evaluating the bids submitted, and in developing a recommendation for consideration by the District's Board of Director's. Task 2—Provide 24-hour Supervision/Data Collection during Well Drilling Farr West shall provide 24-hour on-site field supervision and data collection during the Well Drilling and Construction contract. These activities shall include the following: • Geologic logging of the borehole to its proposed depth of 1,200 feet • Accounting for drilling material used • Recording drill rig activity • Logging the time of the drilling to determine penetration rates • Evaluation of downhole geophysical surveys • Documentation of drilling crew activities with respect to safety issues • Maintaining a log of time spent for each activity that the drilling crew undertakes • Ensure that well construction complies with the project specifications • Other activities as deemed necessary by the District After the completion of well drilling activity, Farr West will provide on-site field supervision and data collection during air-lift development. Farr West shall oversee the downhole video survey and plumbness tests conducted by the well driller. Task 3—Provide On-Site Supervision and Data Collection During Well Development The Consultant shall provide on-site field supervision and data collection during the Fibreboard Well Development Pumping contract. These activities shall include the following: • Collect water quality samples at 40 foot intervals during development pumping. • Oversee surging at increased pumping rates until the discharge is free of sediment and the turbidity is measured to be less than 100 NTU's. • Oversee step-drawdown testing to determine well efficiency and the pumping rate to be used during the constant-discharge test. • Oversee the constant-discharge pumping while monitoring the water level at the production well. • Monitor water levels at the production well during recovery periods. The Consultant shall be responsible for delivery of water quality samples to the Sierra Environmental Laboratory in Reno,Nevada. RFP Hydrogeologic Consulting Services - 12- Farr West Engineering Truckee Donner PUD May 24, 2007 Task 4 — Evaluate Data Collected During Well Drilling and Test Pumping and Prepare Summary Report The Consultant shall prepare a report summarizing all of the activity and data collection that was completed under Tasks 2 and 3. The report shall include data analysis and recommendations regarding the production potential of the well and sizing of well pump equipment. 4.3 SITING OF ADDITIONAL WATER SUPPLY WELLS The District's Water System Master Plan has identified the need for additional water supply wells as development occurs within the District's water service area. The District's RFP has described the services required for installation of additional wells under Task 5. This task is to commence at the request of the District as described below: Task 5—Assist in Siting of Additional Water Supply Wells Farr West is familiar with the hydrogeologic setting based on previous experience working in the Martis Valley Groundwater Basin. Kirk Swanson and David Westhoff contributed to the Martis Valley Groundwater Availability Study while working for Nimbus Engineers as well as contributed to reports while working for Hydro-Search Inc. Understanding volcanic processes is critical to siting wells in the Truckee area. Dr. Swanson of Farr West has the extensive knowledge and experience working within volcanic geologic settings. Dr. Swanson has studied and published papers on volcanic processes. Thin interbedded units within a sequence of volcanic rocks and local secondary fracture permeability within lava flows can account for most of the potential production within a volcanic rock sequence. In addition,understanding the relationships between arsenic occurrences in volcanic rock sequences is importance in regard to siting wells in the Truckee area. Since the production on the Truckee area is derived from volcanic and alluvial rock units understanding the interrelationship between volcanic processes and alluvial/fluvial processes required. Services provided under the Scope of Work will include: • Review of hydrologic studies (general geological, fault, volcanic and hydrogeological studies) • Review of well driller's reports • Review of other recent relevant information collected data by the District or others The Consultant then shall assist the District in the identification of potential future well sites. The familiarity that Farr West and Quad Knopf have with volcanic geology and the local geologic setting is crucial for the success for this task. RFP Hydrogeologic Consulting Services - 13 - Farr West Engineering Truckee Donner PUD May 24, 2007 4.4 QUALITY ASSURRANCE/QUALITY CONTROL Farr West's management principles include planning, implementation, checking and improvement. Quality assurance includes quality control, which comprises those actions related to the, collection of field data, verifying physical characteristics of construction materials and placement of construction materials. Members of the project team are well experienced in Quality Assurance/Quality Control procedures. The teams procedures for Quality Assurance and Quality Control have been developed working on highly regulated sites including Environmental Protection Agency Superfund sites and Department of Energy sites on the Nevada Test Site. Team members also have experience with Quality Control procedures on less regulated sites. Quality Assurance procedures can be divided into two categories regarding municipal well drilling and installation. The first category of quality assurance relates to the accurate collection of data during drilling and testing. The second aspect of quality assurance is related to materials and methods for constructing the municipal well. Technical Specifications created by Farr West include criteria to assure that Quality Control is adhered to by the drilling and pump contractors. Sample collection, under continuous chain of chain-of custody, and analysis will comply with regulated laboratory quality assurance protocol including performance audits, data validation and verification efforts. Quality Assurance (QA) includes activities that ensure that data collected are of adequate quality given the project objectives. Quality Assurance consists of two separate but interrelated activities: Quality Control (QC); and Quality Assessment. Quality control refers to the technical activities employed to ensure that the data collected are adequate given the project objectives to be tested. Quality Assessment activities are implemented to quantify the effectiveness of the quality control procedures. Some of the steps being taken to ensure that high quality data is collected include: • Implementation of Standard Operating Procedures for documenting and describing activities and materials; • Internal (project manager, i.e. Farr West) review of program's scientific, technical and construction processes; • External (alternate project manager, i.e. Quad Knopf) review of program's scientific, technical and construction processes. The steps have been effective it controlling quality assurance in a cost effective manner. RFP Hydrogeologic Consulting Services - 14- Farr West Engineering Truckee Donner PUD May 24,2007