Loading...
HomeMy WebLinkAbout11 Wire and Cable Bid Agenda Item #AWIT E E. kjo Public Utility District Memorandum To: Board of Directors From: Sanna Schlosser, Associate Electrical Engineer Date: May 10, 2007 Date of Board Meeting: May 16, 2007 Subject: Wire and Cable Bid Award Recommendation 1. WHY THIS MATTER IS BEFORE THE BOARD Only the Board can approve bid awards. 2. HISTORY The District's annual purchase of wire and cable is required to meet our customer obligations and the purchase has been budgeted. 3. NEW INFORMATION Bids have been opened and analyzed for the District's purchase of wire and cable. Attached is a summary schedule of the bid information received. The schedule shows the description and quantity of wire required, vendor name, quoted price, delivery time, and any noted exceptions to our bid requirements. The following factors were used in determining the successful bidder: price, adherence to our contract and specifications, and delivery time. Adherence to our contract and specifications is very important, however minor deviations from our specifications may be permitted based on our review of the particular situation. Delivery time, however, is very critical due to our short construction season. 4. RECOMMENDATION I recommend the Board approve the following Schedules as shown below for the purchase of wire and cable for the District's electric system: t u tfjr rl l r Ex tet Pd S I duf Vender,,, feet t ft - (NdIl'to.Ex666 A HD Supply 9,000 $949.00 $8,541.00 B HD Supply 10,000 $2,582.00 $25,820.00 C HD Supply 1,000 $1,412.00 $1,412.00 D HD Supply 1,000 $2,236.00 $2,236.00 E HD Supply 2,000 $4,105.00 $8,210.00 F HD Supply 2,000 $5,718.00 $11 ,436.00 G HD Supply 1,500 1 $1,154.00 $1,731.00 Total $59,386.00 WIRE & CABLE BID SUMMARY - 2007 Truckee Donner PUD Apparent Low Bidder Schedule A Secondary Cable, 2-1/0 &142, Code Name Brenau, Quantity: 9,000 ft. Quoted Quoted Exceptions Bidder Manufact. Price(kft) Total Price Delivery Time to Bid Other Non-Colusion Affidavit G.E. Supply Alcan $1,220.00 $10,980.00 1 wk Yes Champion Phelps Dodge $980.00 $8,820.00 1-3 Yes General Pacific Phelps Dodge $1,129.00 $10,161.00 10 Yes Gra bar Southwire $1,220.80 $10,987.20 16-20 Yes HD Supply Alcan or General $949.00 $8,541.00 6 Yes JCH Sur)DIV Southwire $1,471.00 $13,239.00 2-3 Yes Prysmian Prysmian $1,052.94 $9,476.46 12 Liq. Damages Yes Wedco, Inc Kin wire $1,106.00 $9,954.00 1 Yes Schedule B Secondary Cable, 2-350&1-4/0, Code Name Wesleyan, Quantity: 10,000 ft. Quoted Quoted Exceptions Bidder Manufact. Price(kft) Total Price Delivery Time to Bid Other G.E. Supply Alcan $3,335.00 1 $33,350.00 1 wk Champion Phelps Dodge $2,877.00 $28,770.00 1-3 General Pacific Phelps Dodge $2,734.00 $27,340.05 10 Gra bar Southwire $3,336.00 $33,360.00 16-20 HD Supply Alcan or General $2,582.00 $25,820.00 6 JCH Supply Southwire $4,020.00 $40,200.00 2-3 Prysmian Prysmian $2,877.30 $28,773.00 12 Liq. Damages Wedco, Inc Kin wire $3,022.30 $30,223.00 1 i Page 1 of 4 5/11/2007 WIRE & CABLE BID SUMMARY - 2007 Truckee Donner PUD Apparent Low Bidder Schedule C Secondary Cable, 3-1/0 &142, Code Name Notre Dame, Quantity: 1,000 ft Quoted Quoted Exceptions Bidder Manufact. Price(kft) Total Price Delivery Time to Bid Other G.E. Supply Alcan $1,780.00 $2,492.00 1 wk 1400 ft std. reel Champion Phelps Dodge $1,625.00 $1,625.00 1-3 General Pacific Phelps Dodge $1,962.00 $1,962.00 10 Sched. C,D,E,F&G all or none Gra bar Southwire $1,734.40 $1,734.40 16-20 HD Supply Alcan or General $1,412.00 $1,412.00 6 JCH Supply Southwire $2,090.00 $2,090.00 2-3 Prysmian Prysmian $1,495.92 $1,495.92 12 Li . Damages Wedco, Inc Kin wire $1,571.12 $1,571.12 1 Schedule D Secondary Cable, 3-4/0 &1-2/0, Code Name Wake Forest, Quantity: 1,000 ft Quoted Quoted Exceptions Bidder Manufact. Price(kft) Total Price Delivery Time to Bid Other G.E. Supply Alcan 2,800.001 $2,800.00 1 wk Champion Phelps Dodge $2,550.00 $2,550.00 1-3 General Pacific Phelps Dodge $2,755.00 $2,755.00 10 Sched. C,D,E,F&G all or none Gra bar Southwire $2,728.00 $2,728.00 16-20 HD Supply Alcan or General $2,236.00 $2,236.00 6 JCH Supply Southwire $3,286.00 $3,286.00 2-3 j Prysmian Prysmian $2,352.90 $2,352.90 12 Liq. Damages Wedco, Inc Kin wire $2,472.23 1 f i Page 2 of 4 5/11/2007 WIRE & CABLE BID SUMMARY - 2007 Truckee Donner PUD Apparent Low Bidder Schedule E Secondary Cable, 3-350& 1-4/0, Code Name Slippery Rock, Quantity: 2,000 ft Quoted Quoted Exceptions Bidder Manufact. Price(kft) Total Price Delivery Time to Bid Other G.E. Supply Alcan $5,245.00 $10,490.00 1 wk 1500 ft std. reel Champion Phelps Dodge $4,460.00 $8,920.00 1-3 General Pacific Phelps Dodge $4,717.00 $9,434.00 10 Sched. C,D,E,F&G all or none Gra bar Southwire No Bid HD Supply Alcan or General $4,105.00 $8,210.00 6 JCH Supply Southwire $6,147.00 $12,294.00 2-3 Prysmian Prysmian $4,400.82 $8,801.64 12 Li . Damages Wedco, Inc Kin wire $4,623.35 $9,246.70 1 Schedule F Secondary Cable, 3-500 &1-350, Code Name Wofford, Quantity: 2,000 ft Quoted Quoted Exceptions Bidder Manufact. Price(kft) Total Price Delivery Time to Bid Other G.E. Supply Alcan No Bid Champion Phelps Dodge $5,960.00 $11,920.00 1-3 General Pacific Phelps Dodge $6,361.00 $12,722.00 10 Sched. C,D,E,F&G all or none Gra bar Southwire No Bid HD Supply Alcan or General $5,718.00 $11,436.00 6 JCH Supply Kin wire $9,023.00 $18,046.00 2-3 Prysmian Prysmian $6,051.30 $12,102.60 12 Li . Damages € Wedco, Inc in wire $6,176.70 $12,353.40 1 Page 3 of 4 5/11/2007 WIRE & CABLE BID SUMMARY - 2007 Truckee Donner PUD Apparent Low Bidder Schedule G Service Wire, 2/0 Triplex, Code Name Runcina, Quantity: 1,500 ft. Quoted Quoted Exceptions Bidder Manufact. Price(kft) Total Price Delivery Time to Bid Other G.E. Supply Alcan $1,410.00 $2,115.00 1 wk Champion Phelps Dodge $1,160.00 $1,740.00 1-3 General Pacific Phelps Dodge $1,631.00 $2,446.50 10 Sched. C,D,E,F&G all or none Gra bar Southwire $1,369.60 $1,369.60 16-20 $ discrepancy HD Supply Alcan or General $1,154.00 $1,731.00 6 JCH Supply Southwire $1,650.00 $2,475.00 2-3 Prysmian Prysmian No Bid Wedco, Inc Kin wire $1,241.15 $1,861.73 1 I G r E Page 4 of 4 5/11/2007