HomeMy WebLinkAbout15 c Attachment 3 Building Modernization ProjectJ E N N I F E R S T O L L A R C H I T E C T jenniferstollarchitect@gmail.com - jenniferstollarchitect.com PO Box 1812, Tahoe City, CA 96145 530-386-3896 Page 1 of 1 PRELIMINARY DESIGN BUDGET Project: 20-005 Truckee Donner PUD Facility Modernization Date: Thursday, May 20, 2021 Original Estimates - 2020 1) Demo stucco and add metal siding 600K 2) Awning Construction : 330K (original 180 + 150K for additional awnings) 3) Window Replacement: 250K (220K + 30K for new hall windows) 4) Streetscape Landscaping & bench: 100K 5) New Monument Signage: 75K 6) Demo and rebuild new Entry: 575K (500K +75 columns) 7) New Lighting Sconces: 50K 8) New window trim/siding: 50K 9) New roof at Employee patio: 200K 10) Subgrade waterproofing: 100K (previously not in the scope) 11) Add 1-1/2” rigid insulation under siding: 100K Total: 2.43m Notes: - Please note the following are estimates only, based on mid-2020 industry standards and are subject to changes. The market is very volatile and it is difficult to anticipate the 2022 market projections with any accuracy. - Lumber has roughly doubled in price from last summer and is anticipated to continue to rise throughout this summer. However the scope of this project is not primarily lumber. - Metal costs have also risen. This project has structural steel and metal siding, so this cost will be affected. - Labor costs are rising due to quantity of building in our area and abroad. This project is labor intensive due to the demolition work needed to remove the stucco. - Please note unforeseen issues with the building might be revealed during demolition and addressing larger problems might take priority, regardless of the original scope.