Loading...
HomeMy WebLinkAbout10a Attachment 1 - R2021-06 - Approving Power Source Disclosure 2019 Resolution No. 2021-06 APPROVING SUBMISSION AND ATTESTING TO THE VERACITY OF THE 2019 POWER SOURCE DISCLOSURE REPORT AND POWER CONTENT LABEL ______________________________________________________________________ WHEREAS, the Truckee Donner Public Utility District (District) is a public agency of the State of California, and owns and operates an Electric System for the provision of electric service at retail to the general public within its service area; and WHEREAS, Senate Bill 1305 (SB 1305), adopted in 1997, directs all California retail suppliers of electricity to disclose to consumers the sources of energy used to provide the electric service in an accurate and easy to understand manner; and WHEREAS, the California Energy Commission (CEC) regulation implementing SB 1305 requires publicly owned electric utilities, like the District, to have the Board attest to the veracity of the Power Source Disclosure (PSD) and Power Content Label (PCL) in lieu of an audit by a third-party certified public accountant; and WHEREAS, District staff accurately prepared the 2019 PSD Report and PCL for submission to the CEC and District customers based on information provided and verified by our electric suppliers including the Utah Associated Power Systems, Western Area Power Administration, and Western Electricity Coordinating Council, and a third-party verifier who prepares a report for all electricity transactions and submits this report annually to the California Air Resources Board for Greenhouse Gas Emissions reporting requirements; and WHEREAS, the District generally submits a PSD Report to the CEC by June 1st of each year, and the PCL is made available to our customers around November of each year in accordance with CEC requirements and deadlines. NOW THEREFORE BE IT RESOLVED by the Board of Directors of the District as follows: The Board of Directors approves the submission of the 2019 Power Source Disclosure Report (Exhibit A) and Power Content Label (Exhibit B) to the California Energy Commission and hereby provides attestation of the veracity of the reports submitted by staff. PASSED AND ADOPTED by the Board of Directors at a meeting duly called and held within the District on the 7th day of April, 2021, by the following roll call vote: AYES: NOES: ABSTAIN: ABSENT: TRUCKEE DONNER PUBLIC UTILITY DISTRICT By____________________________________ Christa Finn, President of the Board ATTEST: _____________________________________ Shanna D. Kuhlemier, CMC, District Clerk Version: May 8, 2020 149,269 83,208 66,061 - 9,424 7,124 66,659 DIRECTLY DELIVERED RENEWABLES Facility Name Fuel Type State or Province WREGIS ID RPS ID N/A EIA ID Gross MWh Procured MWh Resold Net MWh Procured Adjusted Net MWh Procured N/A Horse Butte Wind Wind Idaho W3260 62359 57890 42,909 1,426 41,483 41,483 Trans Jordan Generating Station Biomass & biowaste Utah W1405 61356 56853 25,480 2,407 23,073 23,073 Pleasant Valley Wind Energy Project Wind Wyoming W236 61559 56093 543 272 271 271 Stampede Dam - WAPA Small Hydro with REC's Eligible hydro California W1177 61046 7066 1,832 1,832 1,832 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - FIRMED-AND-SHAPED IMPORTS Net Nuclear, Large Hydro & Renewables Retail Sales (MWh) Unspecified Power (MWh) Procurement to be adjusted Net Natural Gas Net Coal & Other Fossil Fuels Net Specified Procurement (MWh) ANNUAL REPORT TO THE CALIFORNIA ENERGY COMMISSION: Power Source Disclosure SCHEDULE 1: PROCUREMENTS AND RETAIL SALES For the Year Ending December 31, 2019 TRUCKEE DONNER PUBLIC UTILITY DISTRICT Instructions: Enter information about power procurements underlying this electricity portfolio for which your company is filing the Annual Report. Insert additional rows as needed. All fields in white should be filled out. Fields in grey auto-populate as needed and should not be filled out. For firmed-and-shaped imports, provide the EIA ID of the substitute power, not the generator ID of the RECs. For EIA IDs for unspecified power or specified system mixes from asset-controlling suppliers, enter "unspecified", "BPA,""Powerex,",or "Tacoma" as applicable. For specified procurements of ACS power, use the ACS Procurement Calculator to calculate the resource breakdown comprising the ACS system mix. Procurements of unspecified power must not be entered as line items below; unspecified power will be calculated automatically in cell L9. Unbundled RECs must not be entered on Schedule 1 ; these products must be entered on Schedule 2. At the bottom portion of the schedule, provide the other electricity end -uses that are not retail sales including, but not limited to transmission and distribution losses or municipal street lighting. Amounts should be in megawatt-hours. EXHIBIT A Version: May 8, 2020 Facility Name Fuel Type State or Province WREGIS ID RPS ID EIA ID of REC Source EIA ID of Substitute Power Gross MWh Procured MWh Resold Net MWh Procured Adjusted Net MWh Procured Eligible for Grandfathered Emissions? - - - - - - - - - - - - - - - - - - - - - - - - SPECIFIED NON-RENEWABLE PROCUREMENTS Facility Name Fuel Type State or Province N/A N/A N/A EIA ID Gross MWh Procured MWh Resold Net MWh Procured Adjusted Net MWh Procured N/A Nebo Power Station Natural gas Utah 56177 11,066 1,641 9,424 9,424 Veyo Heat Recovery Project Other Utah 60421 11,244 4,120 7,124 7,124 - - - - - - - - - - - - - - - - - - - - - - PROCUREMENTS FROM ASSET-CONTROLLING SUPPLIERS Facility Name Fuel Type N/A N/A N/A N/A EIA ID Gross MWh Procured MWh Resold Net MWh Procured Adjusted Net MWh Procured N/A - - - - - - - - - EXHIBIT A (cont) Version: May 8, 2020 - - END USES OTHER THAN RETAIL SALES MWh Transmission Losses 2784 Distribution Losses 3969 EXHIBIT A (cont) Version: May 8, 2020 26,756 RETIRED UNBUNDLED RECS Facility Name Fuel Type Location (State or Province)RPS ID N/A N/A Total Retired (in MWh)N/A N/A N/A N/A N/A Horse Butte Wind - REC Only Wind Idaho 62359 1,426 Trans Jordan Generation Stations - REC OnlyBiomass & biowaste Utah 61359 2,407 Pleasant Valley Wind Energy Project - REC OnlyWind Wyoming 61559 272 Nimbus - WAPA Small Hydro - REC OnlyEligible hydro California 61045 2,810 Lewiston Powerplant - WAPA Small Hydro - REC OnlyEligible hydro California 61044 283 Horse Butte Wind - REC Only Wind Idaho 62359 19,559 Total Unbundled RECs ANNUAL REPORT TO THE CALIFORNIA ENERGY COMMISSION: Power Source Disclosure SCHEDULE 2: PRORCUREMENTS AND RETAIL SALES For the Year Ending December 31, 2019 TRUCKEE DONNER PUBLIC UTILITY DISTRICT INSTRUCTIONS: Enter information about retired unbundled RECs associated with this electricity portfolio. Insert additional rows as needed. All fields in white should be filled out. Fields in grey auto - populate as needed and should not be filled out. EXHIBIT A (cont) Version: May 8, 2020 Adjusted Net Procured (MWh) Percent of Total Retail Sales Renewable Procurements 66,659 44.7% Biomass & Biowaste 23,073 15.5% Geothermal - 0.0% Eligible Hydroelectric 1,832 1.2% Solar - 0.0% Wind 41,754 28.0% Coal - 0.0% Large Hydroelectric - 0.0% Natural gas 9,424 6.3% Nuclear - 0.0% Other 7,124 4.8% Unspecified Power 66,061 44.3% Total 149,269 100.0% 149,269 17.9% ANNUAL REPORT TO THE CALIFORNIA ENERGY COMMISSION: Power Source for the year ending December 31, 2019 Total Retail Sales (MWh) Percentage of Retail Sales Covered by Retired Unbundled RECs TRUCKEE DONNER PUBLIC UTILITY DISTRICT SCHEDULE 3: ANNUAL POWER CONTENT LABEL DATA Instructions: No data input is needed on this schedule. Retail suppliers should use these auto-populated calculations to fill out their Power Content Labels. EXHIBIT A (cont) Version: October 2020 2019 POWER CONTENT LABEL TRUCKEE DONNER PUBLIC UTILITY DISTRICT www.tdpud.org ENERGY RESOURCES Power Mix 2019 CA Power Mix Eligible Renewable1 44.7%31.7% Biomass & Biowaste 15.5%2.4% Geothermal 0.0%4.8% Eligible Hydroelectric 1.2%2.0% Solar 0.0%12.3% Wind 28.0%10.2% Coal 0.0%3.0% Large Hydroelectric 0.0%14.6% Natural Gas 6.3%34.2% Nuclear 0.0%9.0% Other 4.8%0.2% Unspecified sources of power2 44.3%7.3% TOTAL 100%100% Percentage of Retail Sales Covered by Retired Unbundled RECs3 17.9% 1The eligible renewable percentage above does not reflect RPS compliance, which is determined using a different methodology. 2Unspecified power is electricity that has been purchased through open market transactions and is not traceable to a specific generation source. 3Renewable energy credits (RECs) are tracking instruments issued for renewable generation. Unbundled renewable energy credits (RECs) represent renewable generation that was not delivered to serve retail sales. Unbundled RECs are not reflected in the power mix or GHG emissions intensities above. For specific information about this electricity product, contact: Truckee Donner Public Utility District (530) 587-3896 For general information about the Power Content Label, please visit:http://www.energy.ca.gov/pcl/ For additional questions, please contact the California Energy Commission at: Toll-free in California: 844-454-2906 Outside California: 916-653-0237 EXHIBIT B